Semantic search

Jump to navigation Jump to search
 Issue dateTitle
Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems25 November 1994Inadequate DC Ground Detection in Direct Current Distribution Systems
NRC Generic Letter 1991-0927 June 1991NRC Generic Letter 1991-009: Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System
05000322/LER-1985-05916 May 1990LER 85-059-01:on 851219,half Reactor Trip,Full NSSS Shutoff Sys Isolation & Reactor Bldg Standby Ventilation Sys Initiation Occurred Due to Loss of Power to Reactor Protection Sys Bus B.Assembly Breaker Reset
IR 05000322/19880035 August 1988Exam Rept 50-322/88-03OL on 880516-20.Exam Results:Two Out of Three Senior Reactor Operator & Seven Out of Nine Reactor Operator Candidates Passed Exams
IR 05000322/198700723 June 1987Insp Rept 50-322/87-07 on 870401-0515.No Unnaceptable Conditions Noted.Major Areas Inspected:Plant Operations, Radiation Protection,Security,Plant Events,Maint, Surveillance,Outage Activities & Repts to NRC
IR 05000322/19860147 October 1986Insp Rept 50-322/86-14 on 860716-0831.No Unacceptable Conditions Noted.Open Items Noted:Safety Sys Actuations from Electrical Assembly Breaker Spurious Trips & 10CFR21 Rept Re Escape Airlock
Information Notice 1986-47, Erratic Behavior of Static O Ring Differential Pressure Switches10 June 1986Erratic Behavior of Static O Ring Differential Pressure Switches
IR 05000322/198504331 January 1986Insp Rept 50-322/85-43 on 851201-31.No Violations or Deviations Noted.Major Areas Inspected:Completion of Neutron Source Outage & Transition Prior to Reactor Water Level Ref Leg Replacement Outage
ML20112H12815 January 1985Testimony of Fg Dawe,Ja Notaro & Ej Youngling Re Suffolk County & State of Ny Contention on Tdi Diesel Generator Qualified Load.Related Correspondence
ML20112H49015 January 1985Testimony of Gf Dawe,Ja Notaro & Ej Youngling Re Diesel Generator Qualified Load.Related Correspondence
SNRC-1116, Forwards Addl Info Re Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. INPO 84-010, Vendor Equipment Technical Info Program Also Encl.Rept Contains Copyrighted Matl4 December 1984Forwards Addl Info Re Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. INPO 84-010, Vendor Equipment Technical Info Program Also Encl.Rept Contains Copyrighted Matl
SNRC-1101, Forwards Addl Info Re FSAR Chapter 13, Conduct of Operations, Submitted as Part of Amend 51 to License Application.Resumes for Watch Engineers Assigned to Shift Crews Encl,Per Reg Guide 1.812 November 1984Forwards Addl Info Re FSAR Chapter 13, Conduct of Operations, Submitted as Part of Amend 51 to License Application.Resumes for Watch Engineers Assigned to Shift Crews Encl,Per Reg Guide 1.8
SNRC-1024, Submits Results of Actions Taken to Comply W/Requirements of IE Bulletin 83-08 Re Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in safety-related Applications Other than Reactor Trip Sys16 April 1984Submits Results of Actions Taken to Comply W/Requirements of IE Bulletin 83-08 Re Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in safety-related Applications Other than Reactor Trip Sys
ML20027C31412 October 1982Testimony of Ja Notaro & Rl Poltrino Re Phase I Emergency Planning Contention 13 on Interim Safety Parameter Display Sys.Prof Qualifications & Supporting Documentation Encl
ML20063J03631 August 1982Control Sys Failures Evaluation Rept
ML20054J73025 June 1982Transcript of 820625 Hearing in Riverhead,Ny.Pp 5,534-5,700
ML20009E42623 July 1981Forwards Responses to SER Open Items 11 & 46 Re ECCS Calculations & IE Bulletin 79-27,respectively & NUREG-0737 Item I.D.1,controlroom Design Review,Item II.B.3,post Accident Sampling & Item II.F.1 Re Accident Monitoring