Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML17081A533 | 9 March 2017 | 8-Columbia-2017-02 Final Written Exam |
ML17081A534 | 9 March 2017 | 9-Columbia-2017-02 Final Operating Test |
ML17081A537 | 9 March 2017 | 1-COLUMBIA-2017-02 Draft Outlines |
ML17081A539 | 9 March 2017 | 3-COLUMBIA-2017-02 Draft Written Exam |
ML17081A541 | 9 March 2017 | 5-Columbia-2017-02 Draft Operating Test |
ML17081A542 | 9 March 2017 | 6-COLUMBIA-2017-02 Draft Operating Test Comments |
ML17081A543 | 9 March 2017 | 7-COLUMBIA-2017-02 Final Outlines |
IR 05000397/2015004 | 29 January 2016 | NRC Integrated Inspection Report 05000397/2015004 |
GO2-16-001, Independent Spent Fuel Storage Installation, (ISFSI) - Transmittal of the Biennial 50.59/72.48 Report | 20 January 2016 | Independent Spent Fuel Storage Installation, (ISFSI) - Transmittal of the Biennial 50.59/72.48 Report |
ML15167A140 | 5 May 2015 | 2015-04 Draft Op Test |
ML15167A128 | 5 May 2015 | 2015-04 As-given Op Test Files |
ML15167A127 | 5 May 2015 | 2015-04 Final Op Test |
ML15167A123 | 5 May 2015 | 2015-04 Final Written Exams |
ML13317B623 | 31 January 2014 | Redacted - Issuance of Amendment No. 226, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla |
GO2-12-017, License Amendment Request to Change Technical Specification in Support of Prnm/Arts/Mellla Implementation | 31 January 2012 | License Amendment Request to Change Technical Specification in Support of Prnm/Arts/Mellla Implementation |
IR 05000397/2011003 | 27 July 2011 | IR 05000397-11-003, on 03/27/2011 - 06/25/2011, Columbia Generating Station, NRC Integrated Inspection Report |
ML11152A126 | 22 April 2011 | CG-2011-04-Final Written Exam |
ML11152A128 | 22 April 2011 | 2011-04-Draft Written Exam |
ML101390369 | 11 May 2010 | Columbia Generating Station, License Amendment Request to Change Technical Specifications in Support of Prnm/Arts/Mella Implementation |
ML092990433 | 14 October 2009 | 2009-10-Final Written Exam |
ML100910275 | 14 October 2009 | 2009-10-Draft Simulator Scenarios |
ML100910286 | 14 October 2009 | CG-2009-10-Draft Written Exam |
ML100910288 | 14 October 2009 | CG-2009-10-Final Operating Test |
IR 05000397/2008004 | 7 November 2008 | IR 05000397-08-004; on 07/01/2008 - 09/30/2008; Columbia Generating Station; Maintenance Effectiveness, Access Control to Radiological Significant Areas, Event Followup and Other Activities |
IR 05000397/2007007 | 14 September 2007 | IR 05000397-07-007 on 07/09/2007 - 08/03/2007; Columbia Generating Station; NRC Inspection Procedure 71111.21, Component Design Basis Inspection |
ML063540193 | 30 November 2006 | Generation Station - 11-2006 - Final As-Given Written Exam, Exam Key |
ML070740688 | 27 November 2006 | Generation Station - 11-2006 - Draft Written Examination |
ML063540359 | 15 May 2006 | Generation Station - 11-2006 - Operating Exam As-Given |
ML071570274 | 5 May 2006 | Generation Station - 11-2006 - Draft Operating Exam |
ML030370751 | 11 April 2002 | Columbia Generating Station - Init Exam - 10/2002 - Final Outline |
ML030360452 | 11 April 2002 | Columbia Generating Station - Init Exam - 10/2002 - Final Operating Exam |
ML030360299 | 11 April 2002 | Columbia Generating Station - Init Exam - 10/2002 - Draft Exam |
ML030360438 | 11 April 2002 | Columbia Generating Station - Init Exam - 10/2002 - Draft Outlines |
ML17292B427 | 30 July 1998 | Forwards Response to Violations Noted in Insp Rept 50-397/98-09.Corrective Actions:Conducted Briefing with Mechanical Shop Personnel on Event,Stressing Need to Review & Comply W/All Procedural Prerequisites |
ML17292B264 | 4 March 1998 | Performance Self Assessment,WNP-2. |
ML17291A785 | 3 May 1995 | LER 95-005-00:on 950222,inoperable IRM Had Been Relied Upon to Meet TS Requirements During Reactor Startup.Caused by Lack of Neutron Source to Test Instrumentation. Sys Knowledge Gained Will Be incorporated.W/950503 Ltr |
ML17291A569 | 7 December 1994 | Simulator Facility Certification. |
Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems | 25 November 1994 | Inadequate DC Ground Detection in Direct Current Distribution Systems |
ML17291A457 | 21 October 1994 | Primary Reactor Containment 1994 Integrated Leakage Rate Test Final Rept. W/941021 Ltr |
ML17291A348 | 19 August 1994 | Responds to NRC 940722 Ltr Re Violation Noted in Insp Rept 50-397/94-15.Corrective Action:Plant Procedures Manual (PPM) 1.3.12 & PPM 1.3.12A Revised to Improve Implementation of Guidance in GL 91-18 |
ML17291A314 | 5 August 1994 | LER 94-014-00:on 940706,ESF Actuation Occurred Due to Lineup Error.Caused by Noncompliance W/Testing Procedures. Improper Lineup Was corrected.W/940805 Ltr |
ML17291A166 | 24 June 1994 | LER 94-005-01:on 940326,control Rod Failed to Scram Due to Degradation of Pilot Valve Elastomers.Caused by Inservice Aging.Scram Time Tests Performed Weekly of Operable Control Rods & SSPVs replaced.W/940624 Ltr |
ML17290B152 | 4 May 1994 | LER 94-005-00:on 940326,control Rod 06-39 Failed to Scram During Routine Scram Time Testing.Caused by Combination of Degradation of Both SSPV Pressure & Exhaust Diaphragms. Exhaust Diaphragms Were Replaced on SSPVs.W/940504 Ltr |
ML17290A896 | 6 January 1994 | Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements |
ML17290A521 | 15 July 1993 | LER 93-025-00:on 930615,Group 1 Nuclear Steam Supply Shutoff Sys Isolation Occurred During Performance of TS Surveillance Test on Turbine Throttle Valves.Caused by Procedure Deficiency.Procedure changed.W/930715 Ltr |
ML17289A928 | 24 June 1992 | WNP-2 Simulator Certification NRC Form 474 Supporting Documentation. |
ML17289A608 | 2 June 1992 | Forwards Self Checking Self Study Handout,Task 99100, OJT 82-ICT-LHOO-QC,per 920527 Enforcement Conference |
ML17289A376 | 31 December 1991 | Washington Nuclear Power Plant Unit 2 Annual Operating Rept. W/920228 Ltr |
NRC Generic Letter 1991-09 | 27 June 1991 | NRC Generic Letter 1991-009: Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System |
ML17286A785 | 16 May 1991 | Provides Licensed Operator Requalification Training Program Corrective Action Plan,Per Reevaluation of Exams During 910226-0308 & follow-up Operation Evaluation During 910321- 22 Periods |