Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML13088A2758 March 2013Final Written Examination with Answer Key (401-5 Format) (Folder 2)
ML13106A19222 February 2013Draft Written Exam (Folder 2)
ML12311A1733 October 2012Final Written Examination with Answer Key (401-5 Format) (Folder 2)
ML12311A19821 September 2012Final Operating Exam (Sections a, B, and C) (Folder 3)
ML12311A14014 September 2012Draft Operating Exam (Sections a, B, and C) (Folder 2)
ML12311A10314 September 2012Draft Written Exam (Folder 2)
ML1102002601 November 2010Final Operating Exam (Sections a, B, and C) (Folder 3)
ML1102002471 November 2010Final Outlines (Folder 3)
ML1102002431 November 2010Final Written Examination with Answer Key (401-5 Format)
ML1101105196 October 2010Draft Written Exam (Folder 2)
ML11011051224 August 2010Draft - Outlines (Facility Letter Dated 8/24/10) Folder 2)
ML09173004111 May 2009Retake - Final Written Examination with Answer Key (401-5 Format)
ML0907902415 February 2009Final Outlines (Folder 3)
ML0907902435 February 2009Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3)
ML0904201198 January 2009Draft - RO & SRO Written Exam (Folder 2)
ML0904201238 January 2009Draft - Operating Exam (Sections a, B, and C) (Folder 2)
ML09042011523 November 2008Draft - Outlines (Folder 2)
ML07141044225 April 2007Final - Section C Operating Exam (Folder 3)
ML07135058312 March 2007Draft - Section C Operating Exam (Folder 2)
ML0504700411 January 2005Final - Section B Operating (Folder 3)
ML05048010523 December 2004Draft - Section B Operating (Folder 2)
ML05048011223 December 2004Draft - Section C Operating (Folder 2)
BVY 04-122, Draft - Outlines (Facility Ltr. Dated 11/16/2004) (Folder 2)16 November 2004Draft - Outlines (Facility Ltr. Dated 11/16/2004) (Folder 2)
ML0331000283 October 2003Draft Section B Operating
ML0331000323 October 2003Draft Section C Operating
ML0331000553 October 2003Final Section C Operating
ML03211003623 July 2003Technical Specification Proposed Change No. 260 Intermediate Range Monitor Surveillance Test Frequencies - Supplemental Information
ML03213056821 July 2003Technical Specification Proposed Change No. 257, Arts/Mella Additional Information in Response to RAI No. 9
ML02154033727 August 2002Issuance of License Amendment Control Rod Block Instrumentation
ML02249010715 August 2002Draft - Section C Operating
ML02249009415 August 2002Draft - SRO Written
ML02246036415 August 2002Final - Section C Operating
ML02246033115 August 2002Final - SRO Written
ML20195J84915 June 1999Application for Amend to License DPR-28,increasing Stis, Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS
IR 05000271/199930228 May 1999NRC Operator Licensing Exam Rept 50-271/99-302(including Completed & Graded Tests) for Tests Administered on 990510-11
ML20217F41522 April 1998Forwards Facility Submittal of Initial/Operating Retake Exam Administered on 980209
IR 05000271/199800113 April 1998Insp Rept 50-271/98-01 on 980125-0314.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support
IR 05000271/199800220 February 1998NRC Operator Licensing Exam Rept 50-271/98-02OL on 980210. Exam Results:Applicant Passed Simulator Retake Exam & Issued SRO License
ML20199J40222 November 1997NRC Operator Licensing Exam Rept 50-271/97-09 for Tests Administered on 970902-04.Two of Four Applicants Passed.One SRO Upgrade Applicant Failed Written & Operating Portion of Exam & One SRO Failed Operating Portion of Exam
IR 05000271/19970047 October 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-271/97-04. Enforcement Discretion Was Exercised in View of Staff Recent Implementation of CA
IR 05000271/199700519 August 1997Insp Rept 50-271/97-05 on 970601-07-19.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support
ML20196J01529 July 1997Responds to NRC Re Violations Noted in Insp Rept 50-271/97-04 on 970420-0531.Corrective Actions:Operators Placed Plant in Stable State Using Appropriate Plant Operating Procedures & Post Trip Review Conducted
ML20141G9217 July 1997Insp Rept 50-271/97-04 on 970420-0531.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support
IR 05000271/19970038 May 1997Insp Rept 50-271/97-03 on 970309-0419.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support
IR 05000271/199601112 February 1997Insp Rept 50-271/96-11 on 961208-970118.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support
Information Notice 1994-80, Inadequate DC Ground Detection in Direct Current Distribution Systems25 November 1994Inadequate DC Ground Detection in Direct Current Distribution Systems
NRC Generic Letter 1991-0927 June 1991NRC Generic Letter 1991-009: Modification of Surveillance Interval for the Electrical Protective Assemblies in Power Supplies for the Reactor Protection System
ML20091B22831 January 1991Simulator Certification Rept,Vermont Yankee Training Dept Jan 1991
IR 05000271/198701625 February 1988Insp Rept 50-271/87-16 on 870801-1030.Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Outage Mgt,Operational Safety Verification,Physical Security Observations,Fitness for Duty Program & LERs
ML20212N9032 March 1987Resident Insp Rept 50-271/87-02 on 870105-0202.No Violations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Physical Security,Plant Operations,Licensee Actions in Response to IE Bulletins 83-08 & 83-07 & LERs