Response to NRC Request for Additional Information Regarding License Amendment Request 19-01, Proposed Changes to the Intake Strcture Physical Security Classification
ML19266A418
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/19/2019
From: Gerfen P
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML19266A417 List:
References
DCL-19-075
Download: ML19266A418 (2)


Text

Enclosure contains Security-Related Information - Withhold Under 10 CFR 2.390 When separated from Enclosure. this cover letter is decontrolled Pacific Gas and Electric Company*

Paula Gerten Oiablo Canyon Power Plant Site Vice President Mail code 104/5/502 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal: 691.4596 Fax: 805.545.4234 September 19, 2019 PG&E Letter DCL-19-075 U.S. Nuclear Regulatory Commission 10 CFR 50.90 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Request for Additional Information Regarding "License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification"

References:

1. PG&E Letter DCL-19-008, "License Amendment Request 19-01, Prop.osed Changes to the Intake Structure Physical Security Classification," dated February 14, 2019 [ML19045A698]
2. E-mail from NRC Senior Project Manager Balwant K. Singal, "License Amendment Request for Change to the Security Classification of Intake Structure - Request for Additional Information (EPID L-2019-LLA-0029)," dated August 13, 2019

[ML192250313]

Dear Commissioners and Staff:

In Reference 1, Pacific Gas and Electric Company (PG&E) submitted a license amendment request to revise the intake structure security classification in the Security Plan and Emergency Plan for Diablo Canyon Power Plant Units 1 and 2.

In Reference 2, the NRC Staff provided a request for additional information (RAI).

The Enclosure to this letter provides PG&E responses to the RAI.

The Enclosure to this letter contains security-related information and should be withheld from public disclosure in accordance with 10 CFR 2.390. When separated from the Enclosure, this cover letter is decontrolled.

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek Enclosure contains Security-Related Information - Withhold Under 10 CFR 2.390 When separated from Enclosure, this cover letter is decontrolled.

Document Control Desk PG&E Letter DCL-19-075 September 19, 2019 Page 2 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions or require additional information, please contact Mr. Hossein Hamzehee, Regulatory Services Manager, at (805) 545-4720.

I state under penalty of perjury that the foregoing is true and correct.

Executed on September 19, 2019.

Sincefuly

~

Paula Gerfejz)-

Site Vice President rntt/4231/51014860-2 Enclosure cc: Diablo Distribution cc/enc: Scott A. Morris, NRG Region IV Administrator Gonzalo L. Perez, Branch Chief, California Department of Public Health John P. Reynoso, Acting NRG Senior Resident Inspector Balwant K. Singal, NRG Senior Project Manager A member of the STARS Alliance Callaway