Response to NRC Request for Additional Information Regarding License Amendment Request 02-04, Revision of TS 5.6.6 - Reactor Coolant System Pressure & Temperature Limits Report
ML032380587
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/15/2003
From: Oatley D
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-03-101, OL-DPR-80, OL-DPR-82
Download: ML032380587 (16)


Text

Pacific Gasand 1& Electric Company David H.Oatley Diablo Canyon Power Plant Vice President and P0. BOx56 General Manager Avila Beach, CA 93424 805.545A350 Fax: 805.545.4234 August 15, 2003 PG&E Letter DCL-03-101 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units I and 2 Response to NRC Request for Additional Information Regarding License Amendment Request 02-04. Revision of Technical Specification 5.6.6 - Reactor Coolant System Pressure and Temperature Limits Report"

Dear Commissioners and Staff:

In Pacific Gas & Electric (PG&E) letter DCL-02-079, 'License Amendment Request (LAR) 02-04, Revision to Technical Specification (TS) 5.6.6 - Reactor Coolant System Pressure and Temperature Limits Report (PTLR)," dated July 31, 2002, PG&E requested NRC approval of the methodology to be used to make changes to the Diablo Canyon Power Plant PTLR without prior NRC approval.

In a telephone call on July 3, 2003, PG&E provided responses to NRC requests for additional information concerning LAR 02-04. Additional questions were transmitted by the NRC staff on July 17, 2003.

A summary of the responses PG&E provided in the July 3, 2003 phone call, and the PG&E responses to the questions transmitted by the NRC on July 17, 2003, are contained in Enclosure 1. Revised marked-up and retyped TS pages are provided in Enclosures 2 and 3, respectively.

This additional information does not affect the results of the technical evaluation and no significant hazards consideration determination previously transmitted in PG&E letter DCL-02-079.

AcO(,

PG&E Letter DCL-03-101 K'Document Control Desk August 15, 2003 Page 2 If you have any questions or require additional information, please contact Stan Ketelsen at (805) 545-4720 or Tom Grozan at (805) 545-4231.

Sincerely f O7 ( ::

David H. Oatley Vice President and General Manager -Diablo Canyon jer13664 Enclosures cc: Edgar Bailey, DHS Thomas P. Gwynn David L. ProuIx Diablo Distribution ccienc: Girija S. Shukla

PG&E Letter DCL-03-101 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

) Docket No. 50-275 In the Matter of ) Facility Operating License PACIFIC GAS AND ELECTRIC COMPANY) No. DPR-80

)

Diablo Canyon Power Plant ) Docket No. 50-323 Units I and 2 ) Facility Operating License No. DPR-82 AFFIDAVIT David H. Oatley, of lawful age, first being duly sworn upon oath states that he is Vice President and General Manager - Diablo Canyon of Pacific Gas and Electric Company; that he has executed this response to the NRC request for additional information on License Amendment Request 02-04 on behalf of said company with full power and authority to do so; that he is familiar with the content thereof; and that the facts stated therein are true and correct to the best of his knowledge, information, and belief.

David H. Oatley Vice President and General Manager - Diablo Canyon Subscribed and sworn to before me this 15th day of August, 2003.

Notary Public C/= ;AC _

SCtauteyof CaSia bis -n ycufsoi 139754

Enclosure 1 PG&E Letter DCL-03-101 Responses to Requests for Additional Information Concerning License Amendment Request 02-04 "Revision of Technical Specification 5.6.6 - Reactor Coolant System Pressure and Temperature Limits Report" Requests for additional information Nos. I through 5 were discussed in a telephone call between the NRC staff and PG&E on July 3, 2003.

NRC Reauest No. 1 Referring to section 4.3 of the submittal f is calculated using the fcbm values where fs and fbim are the inside wetted surface and the clad base interface values respectively. Regulatory Guide (RG) 1.99, Revision 2, uses the term "inner wetted surface of the vessel at the location of the postulated defect" which is commonly understood to mean the clad-base metal interface. The metal flaw is on the base metal surface. The clad is not credited as part of the vessel structure. It is not clear from the submittal whether the 1/4t and 3/4t values accounted for the thickness of the cladding. In this context please explain how the fluence temperatures and stresses were calculated. If indeed the cladding is part of the vessel thickness demonstrate that the values are conservative or make the necessary adjustments.

PG&E Response:

The metal flaw is evaluated to extend from the clad/base metal interface. The clad is not credited as part of the vessel structure for calculating the 1/4t and 3/4t temperature and stress. The cladding fluence attenuation is accounted for in estimating the fluence at each flaw.

NRC Request No. 2 Referring to enclosure 4 (the PTLR report) page 20, the projected RTprs = 259 degrees F at 32 effective full power years (EFPYs) of operation. (1) The references (WCAP-13771 and WCAP-14364) are dated from 1993 and 1995 respectively. The PTLR references do not include either one of these WCAPs. Has the projected value of the fluence been adjusted using the PTLR references? (2) The fluence values are stated in terms of EFPYs. Have there been any power uprates; are any power uprates planned, and is the projected load factor to remain at 80 percent for the life of the plant?

PG&E Response The projected fluence value is reflective of the PTLR references. PG&E recognizes that fluence projections are subject to change due to uprates, loading pattems and load factors. PG&E intends to update the pressurized thermal shock evaluation in the PTLR when the capsule V data are incorporated to include any changes in 1

Enclosure 1 PG&E Letter DCL-03-101 power rating, loading patterns or load factor. It is expected that the projected load factor will increase for the remaining life of the plant. Capsule V incorporation will be done as stated on page 10 of Enclosure I to PG&E Letter DCL-02-079, dated July 31, 2002 (LAR 02-04).

NRC Reauest No. 3 An annotated copy of requirements from Generic Letter 96-03 provided by the NRC for a telephone conference call on July 3, 2003, states that the DCPP PTLR should be updated to incorporate any impacts from the Unit 1 Capsule V and Unit 2 Capsule V data results (WCAP-1 5948 and WCAP-15423).

PG&E Response Page 10 of Enclosure I to PG&E Letter DCL-02-079, dated July 31, 2002 (LAR 02-04), states:

PG&E letter DCL-01-004, Reactor Vessel Material Surveillance Program Capsule V Technical Report, dated January 12, 2001, transmitted Westinghouse technical report, WCAP-15423, Revision 0, Analysis of Capsule V from Pacific Gas and Electric Company Diablo Canyon Unit 2 Reactor Vessel Radiation Surveillance Program," dated September2000.

PG&E stated in DCL-01-004 that: (1) the results of the Capsule V specimen testing show that the limiting vessel belt/ine plate and weld material are behaving in accordance with previous predictions; (2) the results do not indicate any changes needed to the LTOP setpoints or PIT curves currently approved to 16 EFPY; and (3) that the PTLR will be updated with the Capsule V data upon approval of the PTLR methodology.

WCAP-15948, which was issued in January 2003, reported the same conclusions for Unit 1 Capsule V data.

A followup recommendation provided by the NRC on July 23, 2003, requests that the next revision of the PTLR (to be submitted to the NRC for information only) reflect the latest data from the Unit I Capsule V and Unit 2 Capsule V data results (WCAP-1 5948 and WCAP-1 5423). It is PG&E's intention to do so.

NRC Request No. 4 An annotated copy of requirements from Generic Letter 96-03 provided by the NRC for a telephone conference call on July 3, 2003, states the staff would like clarification as to which addition of ASME Section Xl, Appendix A, is being used for the Mm and Mb factor determinations.

2

Enclosure 1 PG&E Letter DCL-03-101 PG&E Response The 1983 Edition, S84 Addenda was used.

NRC Request No. 5 An annotated copy of requirements from Generic Letter 96-03 provided by the NRC for a telephone conference call on July 3, 2003, states the staff requests that the licensee provide the Kt values and delta-temperature values for the 14t and 3/4t locations of the vessel for each P-T point provided in the Tables for the PTLR.

PG&E Response These values were provided in calculation NCM-97010 previously submitted to the NRC by PG&E Letter DCL-99-017, dated February 15, 1999.

Requests for additional information Nos. 6 through 9 were sent to PG&E by the NRC staff on July 17, 2003.

NRC Reauest No. 6 In license amendment request for the PTLR, dated July, 31, 2002, Pacific Gas and Electric Company's (PG&E's) proposed changes to Technical Specification (TS)

Section 5.5.6 lists WCAP-14040-NP-A, Revision 2, as the approved methodology for generating the pressure-temperature (P-T) limits and low pressure overpressure protection system (LTOP) setpoint limits for Diablo Canyon Power Plant (DCPP)

Units 1 and 2. The list of methodologies on TS page does not appear to be inclusive of all the approved methodologies that will be used as part of the PTLR process for generating the P-T limits and LTOP limits for the DCPP, Units I and 2.

The staff requests that proposed TS 5.5.6 (TS page 5.0-28) be revised to include the following methodologies within the scope of the methodologies being credited for generation of the DCPP P-T limits and LTOP setpoint limits:

A. WCAP-14040-NP-A, Methodology Used to Develop Cold Overpressure, Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves.

B. Chapter 6.0 of WCAP-15958, Revision 0, Analysis of Capsule V from Pacific Gas and Electric Company Diablo Canyon Unit I Reactor Vessel Radiation Surveillance Program (January 2003).

3

'.i -fiW Enclosure 1 PG&E Letter DCL-03-101 PG&E Response PG&E concurs with the addition of Chapter 6.0 of WCAP-1 5958 to the scope of methodologies being credited for generation of the DCPP P-T limits and LTOP setpoint limits. The Capsule V report concludes that the current adjusted reference temperature (ART) that forms the basis of the current PTLR bounds the ART based on the fluences determined within that report.

To maintain consistency with NRC approved Industry/TSTF Standard Technical Specification Change Traveler No. 419, PG&E has referenced the Topical Report (WCAP-1 5958) in TS 5.6.6 by number and title. As required by TSTF-419, the complete citation for each Topical Report cited in the PTLR will include the report number, title, revision, date, and any supplements.

Revised marked-up and retyped TS pages are provided in Enclosures 2 and 3, respectively.

NRC Request No. 7 The PTLR's (Enclosure 4 to the letter) evaluation of reactor vessel (RV) beitline materials that are represented in the DCPP RV material surveillance programs for Units I and 2 are based on the evaluation of surveillance data from Capsules S and Y for DCPP Unit and Capsules U, X, and Y for DCPP Unit 2. Provide the following confirmatory responses with respect to the surveillance capsule data currently available from the RV materials surveillance programs for DCPP Units 1 and 2.

A. Confirm that the following WCAPs provide the most current surveillance capsule reports and updated surveillance data for DCPP Units I and 2:

- Unit 1: WCAP-1 5958, Revision 0, Analysis of Capsule V from Pacific Gas and Electric Company Diablo Canyon Unit 1 Reactor Vessel Radiation Surveillance Program (January 2003).

- Unit 2: WCAP-15423, Revision 0, Analysis of Capsule V from Pacific Gas and Electric Company Diablo Canyon Unit 2 Reactor Vessel Radiation Surveillance Program (September 2000).

B. Confirm that the updated surveillance data in WCAP-1 5958, Revision 0, for DCPP Unit I Capsules S, Y, and V and in WCAP-1 5423, Revision 0, for DCPP Unit 2 Capsules U, X, Y, and V will not affect the adjusted reference temperatures used to generate the P-T limits in DCPP Report No. PTLR-1, Revision 2 (i.e., the RTNDT values for the limiting 1/4t and 3/4t beltline materials in the DCPP Units I and 2 reactor vessels) because the chemistry factors for the limiting materials are 4

Enclosure 1 PG&E Letter DCL-03-101 conservatively being generated using the chemistry factor tables in Regulatory Guide 1.99, Revision 2 (May 1988).

PG&E Response A. WCAP-1 5958, Revision 0, and WCAP-1 5423, Revision 0, provide the most current surveillance capsule reports and updated surveillance data for DCPP Units 1 and 2.

B. The updated surveillance data in WCAP-15958, Revision 0, for DCPP Unit 1 Capsules S, Y, and V and in WCAP-15423, Revision 0, for DCPP Unit 2 Capsules U, X, Y, and V do not affect the adjusted reference temperatures used to generate the P-T limits in DCPP Report No. PTLR-1, Revision 2.

NRC Request No. 8 Confirm that the 16 EFPY P-T limit curves incorporated in PG&E Report No.

PTLR-1, Revision 2, are identical to those P-T limit curves that were approved in license amendment No. 133 to Facility Operating License No. DPR-80 for DCPP Unit 1 and license amendment No. 131 to Facility Operating License No. DPR-82 for DCPP Unit 2 (both dated May 3, 1999).

PG&E Response The 16 EFPY P-T limit curves incorporated in PG&E Report No. PTLR-1, Revision 2, are identical to those that were approved in License Amendments 133 and 131 for Units 1 and 2, respectively, with the exception of bolt up temperature.

The bolt up temperature value is discussed PG&E Letter DCL-02-079, dated July 31, 2002, Enclosure 1, page 6, item 3:

The bolt up temperature, based on ASME Appendix G and 10 CFR 50 Appendix G, Table 1, is required to be the initial nil-ductility temperature (RTNDT) of the flange plus any irradiation effects. The highest initial RTNDT of the vessel and closure head flange materials is 53 F. The flange area is sufficiently distant from the fuel region, that the fluence has negligible affect on the RTNDT of the materials in this area. Currently, the boft up temperature of 70 OF is based on the value given in the original Combustion Engineering (CE) nstnction manual for the RV. The proposed curves set the temperature at 60'F based on the Westinghouse WCAP-14040-NP-A position of Section 2.7 and correspondence from CE that upgraded the original instruction manual in conformance with ASME Code requirements.

5

I I Enclosure I PG&E Letter DCL-03-101 NRC Request No. 9 Position 1.1 and the chemistry factor tables of Regulatory Guide (RG) 1.99, Revision 2, are currently being used to determine the limiting 1/4t and 3/4t RTNDT values used in the P-T limits for DCPP. Additional RV surveillance capsules will be removed from the DCPP RVs in accordance with the RV material surveillance programs for DCPP Units 1 and 2. Describe the controls in the PTLR process that would administratively mandate PG&E to change the basis for calculating the chemistry factors and RTNDT values for the limiting 1/4t and 314t materials to Position 2.1 of RG 1.99, Revision 2 (i.e., use of surveillance data for calculating the chemistry factors and RTNDT values).

PG&E Response Section 5 of PTLR-1 (included as Enclosure 4 to PG&E Letter DCL-02-079, dated July 31, 2002) describes the five criteria from RG 199 utilized to determine the credibility of the surveillance capsule data. The discussion under Criterion 3 (page 16 of PTLR-1) states "Should the credibility criteria be met upon future surveillance capsule withdrawal and evaluation, then Reg. Guide 1.22, Rev. 2, Position C.2 may be utilized." (Note RG 1.99 Position 2.1 is included in Regulatory Position C.2, Surveillance Data Available.") In the next revision of the PTLR, PG&E will replace the word "may" in the above quoted sentence with "shall." Thus, should capsule credibility be restored in the future, PG&E will use RG 1.99 Position 2.1.

6

Enclosure 2 PG&E Letter DCL-03-101 Proposed Technical Specification Changes Remove Insert Page 1.1-5 Page 1.1-5 Page 5.0-28 Page 5.0-28

Definitions 1.1 1.1 Definitions (continued)

PRESSURE AND The PTLR is the unit specific document that provides the TEMPERATURE LIMITS reactor vessel pressure and temperature limits, including REPORT (PTLR) heatup and cooldown rates, and the power operated relief valve (PORV) lift settings and arming temperature associated with the Low Temperature Overpressurization Protection (LTOP) System, for the current reactor vessel fluence period. These pressure and temperature limits shall be determined for each fluencejperiod in accordance with delete Secification 5.6.6. Kiant iperation within thesertin shaded m s is airesdin LCO 3.4.3, MRCS Pressure and text mernperature (P/T) Limits," and LCO 3.4.12, Low emperate resre Protection_(LTOP) Systemn."

QUADRANT POWER TILT QPTR shall be the ratio of the maximum upper excore RATIO (QPTR) detector calibrated output to the average of the upper excore detector calibrated outputs, or the ratio of the maximum lower excore detector calibrated output to the average of the lower excore detector calibrated outputs, whichever is greater.

RATED THERMAL POWER RTP shall be a total reactor core heat transfer rate to the (RTP) reactor coolant of 3411 MWt for each unit.

REACTOR TRIP SYSTEM The RTS RESPONSE TIME shall be that time interval from (RTS) RESPONSE TIME when the monitored parameter exceeds its RTS trip setpoint at the channel sensor until loss of stationary gripper coil voltage. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC.

SHUTDOWN MARGIN (SDI M) SDM shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming:

a. All rod cluster control assemblies (RCCAs) are fully inserted except for the single RCCA of highest reactivity worth, which is assumed to be fully withdrawn. With any RCCA not capable of being fully inserted, the reactivity worth of the RCCA must be accounted for in the determination of SDM; and
b. In MODES I and 2, the fuel and moderator 135 temperatures are changed to the hot zero power temperatures.

DIABLO CANYON - UNITS I & 2 1.1-5 Unit I - Amendment No.

TAB5.0-RX 5 Unit 2 - Amendment No.

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.6 Reactor Coolant System (RCS) PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR) (continued)

b. The analytical methods used to determine the RCS pressure and temperatures limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:

_______ ______ ~~and NRC'Letterfrom NRC toGreoryM. Rueger dated May281999-gLTOP The analytical methodsused to determine the RCS pressure and

_I-_temperature limits were developed in accordance with:

/ ,0CR0, Appendix Ga-nd-

/ l~cxnillfor dA 1l an 4li~ n~c^ t-: tXa

_4UI LV y uLIUU I. , VvIJ II . -

_ UREG-0800, Standard Review Plan Section 5.3.2 -

ranch Technical Position MTEB 5-2 SME B&PV Code Section I, Appendix G SME B&PV Code, Section Xi, Appendix A

_A1CAP4040-NPA,ection 2.2 setOP IIts Pelperat le) Valves pre rlie L ;stpontand

- LTOP enable temperature) were developed fin accordance UREG-0800, Standard ReviewPlanSedion 52.2' ranch Technical Position RSB 5-2 0CFR 50, Appendix G'and H gu-atory Guide 1.99, Revision 2'.

ranch Technical Positionr MTEB 5-2 CAP-1 404-NP-, Section 2.2:

c. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluence period and for any revision or supplement thereto.

5.6.7 Not Used 5.6.8 PAM Report When a report is required by Condition B or G of LCO 3.3.3, "Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the i on channels of the Function to OPERABLE status. i 5.6.9 Not Used DIABLO CANYON - UNITS 1 & 2 5.0-28 Unit 1 - Amendment No TAB5.0 - RX 31 Unit 2 - Amendment No.1

Insert I for TS 5.6.6

1. WCAP-14040-NP-A, "Methodology Used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves.'
2. Chapter 6.0 of WCAP-1 5958, "Analysis of Capsule V from Pacific Gas and Electric Company Diablo Canyon Unit 1 Reactor Vessel Radiation Surveillance Program."

Enclosure 3 PG&E Letter DCL-03-101 Revised Technical Specification Pages Enclosure

i - .1.

Definitions 1.1 1.1 Definitions (continued)

PRESSURE AND The PTLR is the unit specific document that provides the TEMPERATURE LIMITS reactor vessel pressure and temperature limits, including REPORT (PTLR) heatup and cooldown rates, and the power operated relief valve (PORV) lift settings and arming temperature associated with the Low Temperature Overpressurization Protection (LTOP) System, for the current reactor vessel fluence period. These pressure and temperature limits shall be determined for each fluence period in accordance with QUADRANT POWER TILT Specification 5.6.6.

QPTR shall be the ratio of the maximum upper excore

-I RATIO (QPTR) detector calibrated output to the average of the upper excore detector calibrated outputs, or the ratio of the maximum lower excore detector calibrated output to the average of the lower excore detector calibrated outputs, whichever is greater.

RATED THERMAL POWER RTP shall be a total reactor core heat transfer rate to the (RTP) reactor coolant of 3411 MWt for each unit.

REACTOR TRIP SYSTEM The RTS RESPONSE TIME shall be that time interval from (RTS) RESPONSE TIME when the monitored parameter exceeds its RTS trip setpoint at the channel sensor until loss of stationary gripper coil voltage. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC.

SHUTDOWN MARGIN (SDM) SDM shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming:

a. All rod cluster control assemblies (RCCAs) are fully inserted except for the single RCCA of highest reactivity worth, which is assumed to be fully withdrawn. With any RCCA not capable of being fully inserted, the reactivity worth of the RCCA must be accounted for in the determination of SDM; and
b. In MODES 1 and 2, the fuel and moderator temperatures are changed to the hot zero power temperatures.

(continued)

Diablo Canyon - Units 1 & 2 1.1-5 Unit 1 - Amendment No. 43, 443 TAB 5.0- RX 5 Unit 2 - Amendment No. 435

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.6 Reactor Coolant System (RCS) PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR) (continued)

b. The analytical methods used to determine the RCS pressure and temperature and LTOP limits shall be those previously reviewed and approved by the NRC, I specifically those described in the following documents:
1. WCAP 14040-NP-A, "Methodology Used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves."
2. Chapter 6.0 of WCAP-15958, "Analysis of Capsule V from Pacific Gas and Electric Company Diablo Canyon Unit 1 Reactor Vessel Radiation Surveillance Program.'
c. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluence period and for any revision or supplement thereto.

5.6.7 Not Used 5.6.8 PAM ReDort When a report is required by Condition B or G of LCO 3.3.3, Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.

5.6.9 Not Used (continued)

Diablo Canyon - Units 1 & 2 - - 5.0-28 Unit I - Amendment No. 435 TAB 5.0 - RX 31 Unit 2 - Amendment No. 435