CPSES-200400101, October and November 2003 Correction to Monthly Operating Reports for Comanche Peak, Units 1 and 2

From kanterella
(Redirected from CPSES-200400101)
Jump to navigation Jump to search
October and November 2003 Correction to Monthly Operating Reports for Comanche Peak, Units 1 and 2
ML040210627
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/15/2004
From: Blevins M
TXU Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-200400101, RP-84, TXX-04012
Download: ML040210627 (4)


Text

Ah TXU

'"440 TXU Energy Mike Blevins Comanche Peak Steam Senior Vice President & Principal Nuclear Officer Electric Station P.O. Box 1002 (EO1)

Glen RoseTX 76043 Ref: #10CFR50.36 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins@txu.com CPSES-200400101 Log # TXX-04012 RP-84 January 15, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CORRECTION TO MONTHLY OPERATING REPORT FOR OCTOBER AND NOVEMBER 2003 REF: (1) Letter logged TXX-03188 from TXU Energy dated November 18, 2003 "MONTHLY OPERATING REPORT FOR OCTOBER 2003" (2) Letter logged TXX-03202 from TXU Energy dated December 12, 2003 "MONTHLY OPERATING REPORT FOR NOVEMBER 2003" Gentlemen:

This letter provides a correction to the Monthly Operating Report for October and November 2003, as previously submitted by TXU Generation Company LP (TXU Energy) in the above referenced letters. Please replace page 5 (for CPSES Unit 2) with the attached corrected page to the Monthly Operating Report for October and November 2003. The CPSES Monthly Operating Report is prepared and submitted pursuant to Technical Specification 5.6.4 contained in Appendix A to the CPSES Units 1 and 2 Operating License Nos. NPF-87 and NPF-89, respectively.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

QRG TXU TXX-04012 Page 2 of 2 In the October 2003 report, the information reported on page 5 for Unit 2, line 9 "Gross Thermal Energy Generated (MWH)" was incorrect for all three columns listed, i.e., "This Month", "Yr to Date" and "Cumulative." The correct information is 337,438; 20,180,343; and 262,515,637, respectively.

In the November 2003 report, the information reported on page 5 for Unit 2, line 9 "Gross Thermal Energy Generated (MWH)" was incorrect for the two columns listed "Yr to Date" and "Cumulative." The correct information is 22,562,269 and 264,897,563 respectively.

This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2. Should you have any questions, please contact Douglas W. Snow at (254) 897-8448.

Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC Its General Partner Mike Blevins By: /g ALEX V

40 alker/

Rglatory Affairs Manager DWS/dws Attachment cc - Mr. B.S. Mallett Region IV Mr. W.D. Johnson, Region IV Mr. M. C. Thadani, NRR Resident Inspectors

CPSES-200400101 Attachment to TXX-04012 Page I of 2 Corrected page to TXX-03188 Page 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 10/10/2003 COMPLETED BY: Robert Reible TELEPHONE: 254-897-0449 OPERATING STATUS

1. REPORTING PERIOD: OCTOBER 2003 GROSS HOURS IN REPORTING PERIOD: 745
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3458** MAX. DEPEND. CAPACITY (MWe-Net): 1150*

DESIGN ELECTRICAL RATING (MWe-Net): 1150

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
4. REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 169.5 6,001.1 79,454
6. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 2,366
7. HOURS GENERATOR ON LINE 138.1 5,937.9 78,916
8. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
9. GROSS THERMAL ENERGY GENERATED (MWH) 337,438 20,180,343 262,515,637
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 110,841 6,904,820 89,202,562
11. NET ELECTRICAL ENERGY GENERATED (MWH) 97,540 6,606,839 85,538,751
12. REACTOR SERVICE FACTOR 22.7 82.3 88.5
13. REACTOR AVAILABILITY FACTOR 22.7 82.3 91.1
14. UNIT SERVICE FACTOR 18.5 81.4 87.9
15. UNIT AVAILABILITY FACTOR 18.5 81.4 87.9
16. UNIT CAPACITY FACTOR (USING MDC) 11.4 78.7 82.8
17. UNIT CAPACITY FACTOR (USING DESIGN Mwe) 11.4 78.7 82.8
18. UNIT FORCED OUTAGE RATE 0.0 6.4 3.1
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP: Ref. SECY-99-034
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 930803
  • ESTIMATED **TS Amendment 89 and TRM Revision 38 for the 0.4% uprate for a total 1.4% uprate.

CPSES-200400101 Attachment to TXX-04012 Page 2 of 2 Corrected page to TXX-03202 Page 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 10/10/2003 COMPLETED BY: Robert Reible TELEPHONE: 254-897-0449 OPERATING STATUS

1. REPORTING PERIOD: NOVEMBER 2003 GROSS HOURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3458** MAX. DEPEND. CAPACITY (MWe-Net): 1150*

DESIGN ELECTRICAL RATING (MWe-Net): 1150

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
4. REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,721.1 80,174
6. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 2,366
7. HOURS GENERATOR ON LINE 720.0 6,657.9 79,636
8. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,381,926 22,562,269 264,897,563
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 823,542 7,728,362 90,026,104
11. NET ELECTRICAL ENERGY GENERATED (MWH) 792,991 7,399,830 86,331,742
12. REACTOR SERVICE FACTOR 100.0 83.8 88.6
13. REACTOR AVAILABILITY FACTOR 100.0 83.8 91.2
14. UNIT SERVICE FACTOR 100.0 83.1 88.0
15. UNIT AVAILABILITY FACTOR 100.0 83.1 88.0
16. UNIT CAPACITY FACTOR (USING MDC) 95.8 80.3 82.9
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 95.8 80.3 82.9
18. UNIT FORCED OUTAGE RATE 0.0 5.7 3.0
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Ref. SECY-99-034

20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:

Ref. SECY-99-034

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 930803
  • ESTIMATED **TS Amendment 89 and TRM Revision 38 for the 0.4% uprate for a total 1.4% uprate.