CPSES-200203777, October 2002 Monthly Operating Report for Comanche Peak

From kanterella
Jump to navigation Jump to search
October 2002 Monthly Operating Report for Comanche Peak
ML023330376
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/18/2002
From: Walker R
TXU Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
10010.2 (RP-84), CPSES-200203777, TXX-02197
Download: ML023330376 (3)


Text

STXU TXU Energy Comanche Peak Steam Electric Station P.O. Box 1002 (E01)

Glen Rose, TX 76043 Tel: 254 897 8920 Fax: 254 897 6652 lance.terry@txu.com C. Lance Terry Senior Vice President &

Principal Nuclear Officer Ref: #10CFR50.36 CPSES-200203777 Log # TXX-02197 File # 10010.2 (RP-84)

November 18, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

REF:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CORRECTION TO MONTHLY OPERATING REPORT FOR SEPTEMBER 2002 Letter logged TXX-02179 from TXU Energy dated October 10, 2002 "MONTHLY OPERATING REPORT FOR SEPTEMBER 2002" Gentlemen:

During review a typographic error was found in the previous monthly report. Please replace the attached corrected page 5 to the Monthly Operating Report for September 2002, prepared and submitted pursuant to Technical Specification 5.6.4 contained in Appendix A to the CPSES Units 1 and 2 Operating License, Nos. NPF-87 and NPF 89, respectively.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak Diablo Canyon e Palo Verde a South Texas Project Wolf Creek

oft, TXU TXX-02197 Page 2 of 2 In September the number of hours reported for line 10 "Cumulative" Gross Electrical Energy Generated (MWH)" was incorrect. The correct number was 79,679,774. The "This Month" and "YR to DATE" numbers were correct.

This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2. Should you have any questions, please contact Douglas W. Snow at (254) 897-8448.

Sincerely, TXU Generation Company LP By:

TXU Generation Management Company LLC Its General Partner C. L. Terry Senior Vice President and Principal Nuclear Officer By:AA Rodr D. Walker Regulatory Affairs Manager DWS/dws Attachment cc -

Mr. E.W. Merschoff, Region IV Mr. W.D. Johnson, Region IV Mr. D.H. Jaffe, NRR Resident Inspectors

CPSES-200203515 Attachment to TXX-02197 Page 1 of 1 7Drteczted page 1 to TXX-02179 Page 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-446 CPSES 2 10/10/2002 Robert Reible 254-897-6382 OPERATING STATUS

1. REPORTING PERIOD: SEPTEMBER 2002 GROSS HOURS IN REPORTING PERIOD:

720

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):

3458**

MAX. DEPEND. CAPACITY (MWe-Net): 1150*

DESIGN ELECTRICAL RATING (MWe-Net):

1150

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
4. REASON FOR RESTRICTION (IF ANY):
5.

NUMBER OF HOURS REACTOR WAS CRITICAL

6.

REACTOR RESERVE SHUTDOWN HOURS

7.

HOURS GENERATOR ON LINE

8.

UNIT RESERVE SHUTDOWN HOURS

9.

GROSS THERMAL ENERGY GENERATED (MWH)

10.

GROSS ELECTRICAL ENERGY GENERATED (MWH)

11.

NET ELECTRICAL ENERGY GENERATED (MWH)

12.

REACTOR SERVICE FACTOR

13.

REACTOR AVAILABILITY FACTOR

14.

UNIT SERVICE FACTOR

15.

UNIT AVAILABILITY FACTOR

16.

UNIT CAPACITY FACTOR (USING MDC)

17.

UNIT CAPACITY FACTOR (USING DESIGN MWe)

18.

UNIT FORCED OUTAGE RATE THIS MONTH 720.0 0

720.0 0

2,468,448 840,784 808,586 100.0 100.0 100.0 YR TO DATE 5,740.8 0

5,680.4 0

19,154,016 6,530,915 6,275,911 87.6 87.6 86.7 100.0 97.7 97.7 0.0 86.7 83.3 83.3 0.5 CUMULATIVE 71,244 2,366 70,769 0

234,744,781 79,679,774 76,414,004 88.7 91.7 88.1 88.1 82.8 82.8 2.9

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP: Ref. SECY-99-034
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

ACHIEVED COMMERCIAL OPERATION 930803

  • ESTIMATED
    • Tech Spec Amendment 89 and TRM revision 38 for the 0.4% uprate for a total 1.4% uprate.