Letter Sequence Draft Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: BVY 06-014, E-mail, Meyer, Entergy, to Ennis, NRR, VY EPU, BVY 06-019, Extended Power Uprate - Regulatory Commitment Information Regarding Steam Dryer Monitoring and FIV Effects, BVY 06-031, To Steam Dryer Monitoring Plan, BVY 06-039, Revision 2 to Steam Dryer Monitoring Plan, BVY 06-051, Summary of Reactor Feedwater Pump Trip Analysis, BVY 06-056, Submittal of Vermont Yankee Report on the Results of Steam Dryer Monitoring, BVY 06-080, Extended Power Uprate - License Amendment No. 229 Clarifications to NRCs Final Safety Evaluation, BVY 06-087, Update to Information Related to 10CFR50.63 Licensing Basis, BVY-06-056, Attachment 1, Vermont Yankee - Steam Dryer Monitoring Plan Rev. 4, ML033140025, ML033160187, ML040080573, ML040090411, ML041810022, ML041810433, ML042180463, ML042650265, ML042680087, ML043020494, ML043150224, ML050060086, ML050280310, ML050450423, ML050940230, ML050940242, ML052080154, ML052630053, ML053490030, ML053530148, ML060330490, ML060390107, ML061290566
|
MONTHYEARML0323403792003-08-31031 August 2003 Technical Assessment of Quad Cities Unit 2, Steam Dryer Failure - Determination of Root Cause & Extent of Condition Project stage: Request ML0325800892003-09-10010 September 2003 Technical Specification Proposed Change No. 263 Extended Power Uprate Project stage: Request ML0328104472003-10-0101 October 2003 Technical Specification Proposed Change No. 263, Supplemental No. 1 Regarding Extended Power Uprate, Technical Review Guidance Project stage: Request ML0331000472003-10-30030 October 2003 Sign-in Sheet for 10/30/2003 Meeting with ENVY and ENO Re to Discuss Arts/Mellla, Alternate Source Term, and Extended Power Uprate Aplications Project stage: Meeting ML0330403972003-10-30030 October 2003 Meeting Handouts for Meeting with Entergy Re Issues for Alternate Source Term, Power Uprate & Acts/Mellla Application Project stage: Meeting ML0331000232003-11-19019 November 2003 Meeting with Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc Regarding Arts/Mellla, Alternate Source Term, and Extended Power Uprate Applications Project stage: Meeting ML0331800882003-12-15015 December 2003 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0331601872003-12-16016 December 2003 Withholding from Public Disclosure, NEDC-33090P, Revision 0, Project stage: Other ML0430204942003-12-24024 December 2003 NRR Work Request to IEPB-A Project stage: Other ML0336401382003-12-30030 December 2003 Draft Request for Additional Information Project stage: Draft RAI ML0400805732004-01-0707 January 2004 NPSH for BWR Extended Power Upgrades (EPU) Project stage: Other ML0400904112004-01-0909 January 2004 NPSH for BWR Extended Power Upgrades (EPU) Project stage: Other BVY 04-009, Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review2004-01-31031 January 2004 Technical Specification Proposed Change No. 263, Supplement No. 4 Regarding Extended Power Uprate, NRC Acceptance Review Project stage: Supplement ML0404001612004-02-19019 February 2004 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0405003022004-02-20020 February 2004 Extended Power Uprate Acceptance Review Project stage: Acceptance Review ML0406306032004-02-27027 February 2004 G20040138/LTR-04-0107 - Sen. James Jeffords & Patrick Leahy Ltr Proposed Power Uprate at Vermont Yankee Project stage: Request ML0408500762004-03-15015 March 2004 G20040206/LTR-04-0168 - Ltr. Rep. Michael Dworkin Independent Safety Asessment of Vermont Yankee Project stage: Request ML0404100222004-03-19019 March 2004 Withholding from Public Disclosure, Responses to Request for Additional Information (Attachment 1 to Letter Bvy 04-008) Project stage: RAI ML0411203582004-03-31031 March 2004 Transcription Meeting Summary, 03/31/2004 Category 3 Meeting with Public to Discuss Proposed Power Uprate, Pages 1-124 Project stage: Meeting ML0411007042004-03-31031 March 2004 Enclosure 1, March 31, 2004, Vermont Yankee Annual Assessment Meeting Power Up-Rate Public Meeting Attendance List Project stage: Meeting ML0411201272004-05-17017 May 2004 Category 3 Public Meeting Summary with Entergy Nuclear Operations Inc. to Discuss Proposed Power Uprate for Vermont Yankee Nuclear Power Station Project stage: Meeting ML0411203682004-05-17017 May 2004 Enclosure 14, 03/31/2004 Meeting Summary for Vermont Yankee. Slides Presentation Proposed Power Uprate Project stage: Meeting ML0410603312004-05-17017 May 2004 Enclosures 3 - 13, 03/31/2004 Meeting Summary for Vermont Yankee Project stage: Meeting ML0414500202004-05-28028 May 2004 Request for Additional Information - Extended Power Uprate Project stage: RAI ML0331400252004-06-25025 June 2004 Vermont, Notice of Consideration of Issuance of Amendment to Facility Operating License for Extended Power Uprate and Opportunity for Hearing Project stage: Other ML0418100222004-06-25025 June 2004 Compliance with NRC Regulatory Compliance Project stage: Other ML0418104332004-06-29029 June 2004 06/29/04 E-mail - Compliance with NRC Regulatory Compliance Project stage: Other ML0420804642004-07-0202 July 2004 Letter Transmitting Vermont Yankee Nuclear Power Station, Technical Specification Proposed Change No. 263 - Supplement No. 8, Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement ML0417400392004-07-0606 July 2004 Vermont Nuclear Power Station, Request for Additional Information, Extended Power Uprate. TAC No. MC0761 Project stage: RAI ML0422501402004-07-27027 July 2004 Technical Specification Proposed Change No. 263 - Supplement No. 9, Extended Power Uprate - Revised Containment Overpressure Envelope Project stage: Supplement BVY 04-074, Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2,2004-07-30030 July 2004 Technical Specification Proposed Change No. 263, Supplement No. 10 Extended Power Uprate, Response to Request for Additional Information, Attachment 2, Project stage: Supplement BVY 04-081, Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information2004-08-12012 August 2004 Technical Specification Proposed Change No. 263 - Supplement No. 11 Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement ML0424305662004-08-25025 August 2004 Technical Specification Proposed Change No. 263 - Supplement No. 12, Extended Power Uprate - Revised Grid Impact Study Project stage: Supplement ML0421804632004-08-31031 August 2004 Withholding from Public Disclosure, Project stage: Other ML0424405372004-09-0101 September 2004 Request for Additional Information - Extended Power Uprate Project stage: RAI ML0422200222004-09-0202 September 2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis Project stage: Meeting ML0425103952004-09-0202 September 2004 Attachments 1 Through 4 of 07/21/2004 & 07/22/2004 Summary of Meeting with Entergy Nuclear Operations, Inc., on Steam Dryer Analysis Project stage: Meeting BVY 04-097, Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items2004-09-14014 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 13 Extended Power Uprate - Response to Steam Dryer Action Items Project stage: Supplement BVY 04-098, Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information2004-09-15015 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information Project stage: Supplement BVY 04-100, Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 22004-09-23023 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 15 Extended Power Uprate - Response to Steam Dryer Action Item No. 2 Project stage: Supplement ML0505901452004-09-29029 September 2004 Attendance List for Sept. 29, 2004 Meeting Steam Dryer Analysis Project stage: Meeting BVY 04-113, Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides2004-09-29029 September 2004 Proposed Technical Specification Change No. 263 - Supplement No. 20 Extended Power Uprate - Meeting on Steam Dryer Analysis Meeting Presentation Slides Project stage: Supplement BVY 04-107, Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline2004-09-30030 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 17 Extended Power Uprate - Response to Request for Additional Information Related to the 10 CFR 50 Appendix R Timeline Project stage: Supplement BVY 04-101, Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-52004-09-30030 September 2004 Technical Specification Proposed Change No. 263 - Supplement No. 16 Extended Power Uprate - Additional Information Related to Request for Additional Information EMEB-B-5 Project stage: Supplement BVY 04-106, Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin2004-10-0505 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin Project stage: Supplement ML0428904102004-10-0707 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 20, Extended Power Uprate - Meeting on Steam Driver Analysis Project stage: Supplement BVY 04-109, Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program2004-10-0707 October 2004 Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program Project stage: Supplement ML0426800872004-10-13013 October 2004 Technical Audit of Steam Dryer Analysis in Support of Extended Power Uprate Request Project stage: Other ML0426502652004-10-15015 October 2004 Extended Power Uprate Review Schedule Project stage: Other ML0431502242004-11-10010 November 2004 EPU SE Input Section 2.10 Project stage: Other 2004-03-15
[Table View] |
Text
I1--..
- 1 1111-
[DorisMend ioa - Comments on DRAFT EA Page 1 From:
"Daflucas, Ronda" <rdafluc@entergy.com>
To:
"Rick Ennis" <RXE@nrc.gov>
Date:
12/8/05 4:20PM
Subject:
Comments on DRAFT EA Attached is Entergy's letter providing comments on the Draft Environmental Assessment.
<<BVY 05-108 final.pdf>>
Ronda Daflucas Vermont Yankee Project Manager, NRR Entergy Nuclear Operations, Inc.
802-258-4232
///
O/ M 5
775wceGwb<,
CC:
"Gucwa, Len" <LGUCW90@prod.entergy.com>, "Nichols, Craig"
<cnichol @prod.entergy.com>, "Hobbs, Brian" <bhobbs~prod.entergy.com>, "Devincentis, Jim"
<jdevinc@ prod.entergy.com>, "Faison, Charlene" <CFaison @entergy.com>, "McCann, John'
<jmccanl @entergy.com>
21
)
'-f i-f J
1a C-)
r -.>
cz rn I - 2~ C-)
C)
-0 I
(ni
..C/)--
~'
1
-51
-e
-3 (6'% -)
I~ c:\\em \\-G-W-I6-01.T-M-P p5ra..eS.R-fl I c:\\temD\\GWIOQOO1.TMP Paae 1 I Mail Envelope Properties (4398A375.44A: 17: 62538)
Subject:
Creation Date:
From:
Comments on DRAFT EA 12/8/05 4:19PM "Daflucas, Ronda" <rdafluc@enterg.com>
Created By:
rdafluc entergv.com Recipients nrc.gov owf4_po.0WFN_DO RXE (Rick Ennis) entergy.com jmccanl CC (John McCann)
CFaison CC (Charlene Faison) prod.entergy.com jdevinc CC (Jim Devincentis) bhobbs CC (Brian Hobbs) cnichol CC (Craig Nichols)
LGUCW90 CC (Len Gucwa)
Post Office owf4_po.0WFN_DO Files MESSAGE TEXT.htm BVY 05-108 final.pdf Mime.822 Options Expiration Date:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
Route nrc.gov entergy.com prod.entergy.com Size 218 1834 159877 223486 Date & Time 12/08/05 04:19PM None Standard No None No Standard
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Vermont Yankee P.O. BOX 0500 185 Old Ferry Road I rD a Brattleboro, VT 05302-0500 En_
Tel 802 257 5271 December 8,2005 Docket No. 50-271 BVY 05-1 08 TAC No. MC0761 Chief, Rules and Directives Branch Office of Administration U.S. Nuclear Regulatory Commission Mail Stop T-6D59 Washington, DC 20555-0001
Subject:
Vermont Yankee Nuclear Power Station Comments on the Draft Environmental Assessment and Finding of No Significant Impact Related to Proposed Extended Power Uprate
References:
- 1) Federal Register: "Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed License Amendment to Increase the Maximum Reactor Power Level," (Volume 70, Number 216), Pages 68106-68114, November 9,2005
- 2) Entergy letter to U.S. Nuclear Regulatory Commission, "Vermont Yankee Nuclear Power Station, License No. DPR-28 (Docket No. 50-271), Technical Specification Proposed Change No. 263, Extended Power Uprate," BVY 03-80, September 10, 2003
- 3) U.S. Atomic Energy Commission, "Final Environmental Statement Related to the Operation of the Vermont Yankee Nuclear Power Station, Docket No. 50-271," July 1972 In Reference 1, the NRC staff published the Draft Environmental Assessment and Finding of No Significant Impact (Draft EA) related to Entergy's request for a license amendment (Reference 2, as supplemented) to increase the maximum reactor power level of the Vermont Yankee Nuclear Power Station (VYNPS) from 1593 megawatts thermal (MWt) to 1912 MWt.
Entergy has completed its review of the Draft EA and has comments related to its content.
Those comments are provided as Attachment 1 to this letter.
An assessment of the environmental impacts of the proposed extended power uprate (EPU) was performed by Entergy as part of the license application. The assessment confirmed that the environmental effects of the proposed EPU are consistent with those determined in 1972 and documented in the original Final Environmental Statement (Reference 3). Entergy agrees with the NRC staff's analysis and conclusion documented in the Draft EA. That is, the proposed action will not have a significant effect on the quality of the human environment.
I~
BVY 05-108 Docket No. 50-271 Page 2 of 2 This.submittal does not include any new commitments. If you have any questions or require additional information, please contact me at (802) 258-4236.
Sincerely, James M. DeVincentis Manager, Ucensing Vermont Yankee 'Nuclear Power Station "Attachment (1) cc Mr. Samuel J. Collins 13eglonal FAdrinistrator, Region. 1'.
U.S. Nuclear Regulatory Commission 475 Allendale Road..
I King of Prussia, PA 19406-1415
- Mr. Richard. B: Ennis, Project Manager Project Directorate I Division of Ucensing Project Management
. Office of Nuclear Reactor Regulation U.S Nuclear Regulatory Comrmissiton
.MailStopO8B1 Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC
-P.O Box 157 Vernon, Vermont 05354 Mr' David O'Brien, Cornmissioher VT Department of Public Service 1 12 State Street - Drawer 20
' Montpelier, Vermont 05620-2601
o
BVY 05-108 Docket No. 50-271 Vermont Yankee Nuclear Power Station Comments on the Draft Environmental Assessment and Finding of No Significant Impact Related to Proposed Extended Power Uprate Total number of pages in Attachment I (excluding this cover sheet) Is 1.
to BVY 05-108 Docket No. 271 Page 1 of 1 ENTERGY COMMENTS ON THE DRAFT ENVIRONMENTAL ASSESSMENT FOR VERMONT YANKEE NUCLEAR POWER STATION RELATED TO EXTENDED POWER UPRATE No.
Location (Federal Register page) I Text Entergy Comment 1
(68108)
The "helper-cycle" mode of operation of the circulating "In the helper-cycle mode lof the water system is available; however, because of the circulating water system], only a portion provisions of the National Pollutant Discharge of the cooling water discharge flow is Elimination System (NPDES) Permit, the system is cycled through the cooling towers before operated in a 'hybrid" cycle as described in the being discharged to the Connecticut Vermont Yankee Nuclear Power Station (VYNPS)
River."
Updated Final Safety Analysis Report (UFSAR) sections 11.6 and 11.9.
The circulating water system is designed to operate in any one of three modes of operation: open, closed, or hybrid cycle. In the hybrid cycle, all of the circulating water flow is cycled through the cooling towers, but only a portion is discharged to the river while the remainder is recycled.
The mode in which the circulating water system operates is a function of river temperature and flow.
2 (68108)
Entergy does not own or maintain the transmission gEntergy's transmission line right-of-way lines. The lines are owned and operated by different maintenance praptices, including the transmission operators who ensure that proper ground management of vegetation growth, would clearances are met.
I not change.d 3
(68108)
It should be noted that Entergy's original environmental In the description of "Cooling Tower assessment for Extended Power Uprate (EPU) was Impacts."
based on the use of 125 horsepower cooling tower fan motors. In fact, twenty-one of the twenty-two cooling tower fan motors were increased in size from 125 horsepower to 200 horsepower. This upgrade will improve cooling tower performance, and lessen aesthetic impacts due to plume size associated with increased cooling tower operation at EPU. The conclusions in the'Draft Environmrental Assessment regarding cooling tower operation (including noise) are correctly stated.