Text
'
Northeast siauione omce.. nor erry na., W iertora, er r
p Utilities Syskm to. u 12a Waterford, CT 0638.50128 (203) 447-1791 November 15, 1995 Docket Nos. 50-245 50-336 50-423 B16006 Re:
U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit Nos.
1, 2, and 3 Facility Operating License Nos. DPR-21, DPR-65, and NPF-49 Monthly Operating Reports In accordance with the reporting requirements of Technical Specification Sections 6.9.1.6, 6.9.1.7, and 6.9.1.5 for Millstone Unit Nos.
1, 2,
and 3,
respectively, enclosed are the monthly-1 operating reports for the month of October 1996.
Each Millstone Unit has recently chosen to. redefine.the nature of their continued shutdowns, due to the fact that the Units are 1
classified as Category III facilities which require NRC approval to restart.
- Also, the NRC has issued a Confirmatory Order requiring implementation of an Independent Corrective Action Verification Program, and has issued an Order requiring a third-I party review of the Employee Concerns Program at Millstone Station.
This redefinition will affect some of the cumulative totals for forced shutdown rates in this report, and several other I
reports dating back to January 1996.
Previous reports may need to f}
be revised to reflect this change in definition of the continued i
shutdowns.
Any revised reports will be forwarded to the Staff in g
the.next monthly operating report, to be submitted no later than /g f v December 15, 1996.
V i
9611210015 961115 PDR ADOCK 05000245 R
PDR Ofi3422 9 REV.195 l
.,s
,i.,'
'U.
S. Nuclear Regulatory Commission B1600'6/Page 2 Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY' f h ffd h C.-Fei[nbaum T.
Executive Vice President-and Chief Nuclear Officer
-Enclosure cc: - Dr. W. D. Travers, Director, Special Projects H. J. Miller, Region I Administrator J. W. Andersen, NRC Project Manager, Millstone Unit No. 1 T. A. Easlick, Senior Resident Inspector, Millstone Unit No. 1 D. G. Mcdonald, NRC Project Manager, Millstone Unit No. 2 Senior Resident Inspector, Millstone Unit No. 2 V.
L. Rooney, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident Inspector, Millstone Unit No. 3 a
-t w
-r4mw c
w.
-,x
-v
-- w y--
+,,
7m 9,. -
--w+