ML26055A133

From kanterella
Jump to navigation Jump to search

Quality Assurance Program Manual Acceptance Letter
ML26055A133
Person / Time
Site: Vallecitos Nuclear Center, 07000754, Vallecitos  File:GEH Hitachi icon.png
(DR-10, TR-1, R-33, SNM-960)
Issue date: 02/26/2026
From: William Allen
Reactor Decommissioning Branch
To: Self L
NorthStar Vallecitos
References
EPID L-2026-LLN-0001
Download: ML26055A133 (0)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Luke M. Self Vice President NorthStar Vallecitos, LLC 6705 Vallecitos Rd.

Sunol, CA 94586

SUBJECT:

QUALITY ASSURANCE PROGRAM MANUAL ACCEPTANCE LETTER

Dear Luke M. Self:

The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed your application dated October 31, 2025 (Agencywide Documents Access and Management System Accession No. ML25308A252). In your application, you requested that a facility specific Form 311 be issued for the Vallecitos Nuclear Center (VNC). In support of your application, you submitted Revision 0 to the NorthStar VNC Quality Assurance Program Manual (QAPM).

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the QAPM. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review.

You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> to complete. The NRC staff expects to complete this review by July 24, 2026, which is approximately five months. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application, and they could change due to several factors including requests for additional information or unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications. Your submittal has been assigned Enterprise Project Identification Number (EPID) L-2026-LLN-0001.

Please reference this EPID number and Docket Nos. 50-70, 50-73, 50-183 and 70-754 in any future correspondence associated with this request.

February 26, 2026

L. Self 2

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2, Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records component of the NRCs ADAMS. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. If you have any questions regarding this matter, please contact me by telephone at (301) 415-6877 or via e-mail at william.allen@nrc.gov.

Sincerely, Chris Allen, Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards Docket Nos. 50-70, 50-73, 50-183 and 70-754 License Nos. TR-1, R-33, DR-10 and SNM-960 EPID No. L-2026-LLN-0001 cc: GEVallecitos GovDelivery Subscribers Signed by Allen, William on 02/26/26

Ltr ML26055A133 OFFICE NRR/DRO/IQVB NMSS/DUWP/RDB NMSS/DUWP/RDB NRR/DRO/IRIB NAME TLee WAllen MSutherland RFedors for DBollock DATE Feb 25, 2026 Feb 24, 2026 Feb 26, 2026 Feb 26, 2026 OFFICE NMSS/DUWP/RDB NAME WAllen DATE Feb 26, 2026