Massachusetts Institute of Technology 2025 Request for Financial Self-Guarantee Acceptance Letter
ML26037A221
Person / Time
Site: 07000938
Issue date: 02/12/2026
From: Stephen Poy
NRC/NMSS/DFM/FFLB
To: Shor G
Massachusetts Institute of Technology (MIT)
References
EPID L-2025-NFA-0013
Download: ML26037A221 (0)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Glen Shor, Executive Vice-President and Treasurer Massachusetts Institute of Technology Building 4-204 77 Massachusetts Avenue Cambridge, MA 02139

SUBJECT:

ACCEPTANCE FOR REVIEW OF MASSACHUSETTS INSTITUTE OF TECHNOLOGYS SELF-GUARANTEE - ENTERPRISE PROJECT IDENTIFIER NUMBER L-2025-NFA-0013

Dear Glen Shor:

The U.S. Nuclear Regulatory Commission (NRC) staff has received your submittal dated September 29, 2025 (Agencywide Documents Access and Management System [ADAMS]

Accession No. ML25337A144, non-public), transmitting the instrument for financial assurance in a Self-Guarantee.

We have completed our acceptance review of your submittal. The NRC staff have determined that the application contains sufficient information to proceed with its detailed technical review.

Your submittal has been assigned Enterprise Project Identification Number (EPID)

L-2025-NFA-0013. Please reference this EPID No. and Docket No. 70-0938 in any future correspondence associated with this request.

Based on our preliminary evaluation and projection of current review schedules, we anticipate completing our formal review by May 2, 2026. This schedule includes the issuance, if needed, of any requests for additional information by end of March 2026 and receiving your responses within 30 days after issuance. Please note that these dates could change depending on the findings of our technical review, urgent assignments, or other factors. The NRC staff estimates that the review of your submittal will take approximately 77 staff hours to complete (annual assurance review only). We will be communicating during the routine interactions.

These estimates are based on the initial review of the application from staff within the NRCs Financial Assessment Branch, and these estimates could change, due to several factors including, among other things, delays in responses to requests for additional information, and unanticipated addition of scope to the review. We will promptly communicate any significant changes to this schedule and/or cost changes should these occur.

In accordance with Title 10 of the Code of Federal Regulations Section 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records component of the NRCs ADAMS. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The PDR is open by appointment.

To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or February 12, 2026

G. Shor 2

call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time, Monday through Friday, except Federal holidays.

If you have any questions regarding this communication, please contact me at 301-415-7135 or via email to stephen.poy@nrc.gov.

Sincerely, Stephen Poy, Project Manager Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 70-0938 License No.: SNM-986 cc: MIT Listserv Signed by Poy, Stephen on 02/12/26