3F0994-06, Forwards Rev 1 to FPC Plant Specific Procedure for Seismic Verification of Nuclear Plant Equipment, to Fulfill Commitment in Attachment 1 to FPC Addressing USI A-46,as Required by GL 87-02
| ML20073E547 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/16/1994 |
| From: | Beard P FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20073E550 | List: |
| References | |
| REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR 3F0994-06, 3F994-6, GL-87-02, GL-87-2, NUDOCS 9409290088 | |
| Download: ML20073E547 (1) | |
Text
---
i 9
~lorida Tower r Unit 3 DocLet No. 50-302 September 16, 1994 3F0994-06 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46, Generic Letter 87-02
Reference:
FPC to NRC letter, 3F0894-02, dated August 15, 1994
Dear Sir:
In Attachment 1 to the reference letter, Florida Power Corpo. ation (FPC) committed to submit a revision to the Crystal River 3 Plant Specific Procedure for Seismic Verification of Nuclear Plant Equipment.
The attachment to this letter fulfills that commitment.
The revision incorporates guidance to the seismic capability engineers regarding the examination of relays as previously committed by FPC.
Sincerely, P. M. Beard, Jr.
Senior Vice President Nuclear Operatio, s Attachment PMB:AEF xc: Regional Administrator, Region II Senior Resident Inspector NRR Project Manager
,I g6
?
aso m L
CRYSTAL RIVER ENERGY COMPLEX + 15760 W. Power Line Street
- Crystal River + Florida 34428-6708 + (904) 795-6486