Category:Letter type:
MONTHYEAR3F0623-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-06-0101 June 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0423-03, 2022 Annual Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Annual Radiological Environmental Operating Report 3F0423-02, 2022 Annual Radioactive Effluent Release Report2023-04-18018 April 2023 2022 Annual Radioactive Effluent Release Report 3F0423-01, 2022 Individual Monitoring NRC Form 5 Report2023-04-0404 April 2023 2022 Individual Monitoring NRC Form 5 Report 3F0323-03, Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2023-03-31031 March 2023 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation 3F0323-02, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20222023-03-29029 March 2023 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2022 3F0323-01, Onsite Property Insurance Coverage2023-03-0202 March 2023 Onsite Property Insurance Coverage 3F0123-01, Proof of Financial Protection2023-01-26026 January 2023 Proof of Financial Protection 3F1222-01, Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan2022-12-12012 December 2022 Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan 3F0522-03, Notification of Revised Decommissioning Cost Estimate2022-05-26026 May 2022 Notification of Revised Decommissioning Cost Estimate 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0422-02, 2021 Annual Radiological Environmental Operating Report2022-04-0606 April 2022 2021 Annual Radiological Environmental Operating Report 3F0322-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20212022-03-30030 March 2022 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2021 3F0322-03, Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1)2022-03-10010 March 2022 Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1) 3F0322-02, 2021 Individual Monitoring NRC Form 5 Report2022-03-0707 March 2022 2021 Individual Monitoring NRC Form 5 Report 3F0222-01, ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)2022-02-0909 February 2022 ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) 3F0222-02, Onsite Property Insurance Coverage2022-02-0909 February 2022 Onsite Property Insurance Coverage 3F0122-01, License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications2022-01-26026 January 2022 License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications 3F0122-02, Proof of Financial Protection2022-01-17017 January 2022 Proof of Financial Protection 3F0122-03, Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report2022-01-17017 January 2022 Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report 3F1021-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-10-21021 October 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0921-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C)2021-09-29029 September 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C) 3F0921-01, to License Amendment Request, Revision 0, ISFSI Security Plan, Revision a2021-09-14014 September 2021 to License Amendment Request, Revision 0, ISFSI Security Plan, Revision a 3F0721-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-07-13013 July 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0621-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S2021-06-16016 June 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S 3F0421-05, 2020 Individual Monitoring NRC Form 5 Report2021-04-27027 April 2021 2020 Individual Monitoring NRC Form 5 Report 3F0421-04, ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2021-04-13013 April 2021 ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0421-03, Proof of Financial Protection2021-04-0707 April 2021 Proof of Financial Protection 3F0421-01, 2020 Annual Radioactive Effluent Release Report2021-04-0606 April 2021 2020 Annual Radioactive Effluent Release Report 3F0421-02, 2020 Annual Radiological Environmental Operating Report2021-04-0606 April 2021 2020 Annual Radiological Environmental Operating Report 3F0321-07, (XEG)-DOE/NRC Forms 741 742 and 743C2021-03-30030 March 2021 (XEG)-DOE/NRC Forms 741 742 and 743C 3F0321-06, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20202021-03-29029 March 2021 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2020 3F0321-01, License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual2021-03-17017 March 2021 License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual 3F0321-02, License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a2021-03-17017 March 2021 License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a 3F0321-05, Onsite Property Insurance Coverage2021-03-15015 March 2021 Onsite Property Insurance Coverage 3F0321-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-03-0909 March 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0221-02, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-02-17017 February 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0221-01, ADP CR3, Llc., Crystal River Energy Complex - Environmental Protection Plan Report: 2020 Sea Turtle Rescue and Recovery Summary Report2021-02-0202 February 2021 ADP CR3, Llc., Crystal River Energy Complex - Environmental Protection Plan Report: 2020 Sea Turtle Rescue and Recovery Summary Report 3F0121-02, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2021-01-19019 January 2021 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E 3F0121-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-01-19019 January 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F1120-02, and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2020-11-19019 November 2020 and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0920-02, Request to Transfer the Quality Assurance Program Approval Form for Radioactive Material Packages2020-09-15015 September 2020 Request to Transfer the Quality Assurance Program Approval Form for Radioactive Material Packages 3F0920-01, License Transfer - Notification of Transfer Date2020-09-15015 September 2020 License Transfer - Notification of Transfer Date 3F0720-03, ISFSI Only Emergency Plan and Implementing Procedure2020-07-21021 July 2020 ISFSI Only Emergency Plan and Implementing Procedure 3F0720-02, License Transfer - Insurance Required of a Licensee Under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w)2020-07-15015 July 2020 License Transfer - Insurance Required of a Licensee Under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w) 3F0520-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20202020-05-18018 May 2020 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2020 3F0420-03, Supplemental Information in Support of Crystal River Unit 3 License Transfer Application - Amended License Conditions2020-04-22022 April 2020 Supplemental Information in Support of Crystal River Unit 3 License Transfer Application - Amended License Conditions 3F0420-01, 2019 Annual Radioactive Effluent Release Report2020-04-0707 April 2020 2019 Annual Radioactive Effluent Release Report 3F0420-02, 2019 Radiological Environmental Operating Report2020-04-0707 April 2020 2019 Radiological Environmental Operating Report 3F0320-04, Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2020-03-19019 March 2020 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation 2023-06-01
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEAR3F0623-02, Maintenance Support Building2023-06-0909 June 2023 Maintenance Support Building ML23160A2982023-06-0909 June 2023 Site Characterization Surveys ML23160A2972023-06-0909 June 2023 CR3 Site Characterization Survey Report (CHAR-01) Impacted Open Land Survey Areas ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan 3F1222-01, Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan2022-12-12012 December 2022 Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan 3F0122-01, License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications2022-01-26026 January 2022 License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications 3F0321-02, License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a2021-03-17017 March 2021 License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a 3F1120-02, and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2020-11-19019 November 2020 and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0619-01, Application for Order Consenting to Direct Transfer of Control of Licenses and Approving Conforming License Amendment2019-06-14014 June 2019 Application for Order Consenting to Direct Transfer of Control of Licenses and Approving Conforming License Amendment ML19130A1952019-05-0808 May 2019 Letter - FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 3F0119-02, License Amendment Request 326, Revision 0, ISFSI Only Emergency Plan, Revision 12019-01-16016 January 2019 License Amendment Request #326, Revision 0, ISFSI Only Emergency Plan, Revision 1 3F0717-01, Submittal of Crystal River Unit 3 - License Amendment Request 321, Revision 1, ISFSI Only Physical Security Plan2017-07-0505 July 2017 Submittal of Crystal River Unit 3 - License Amendment Request #321, Revision 1, ISFSI Only Physical Security Plan 3F1216-01, License Amendment Request 324, Revision 0, Cyber Security Plan License Condition Removal2016-12-0909 December 2016 License Amendment Request #324, Revision 0, Cyber Security Plan License Condition Removal 3F0816-01, License Amendment Request 323, Revision 0, Permanently Defueled Technical Specifications for the Independent Spent Fuel Storage Installation to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pools2016-08-31031 August 2016 License Amendment Request #323, Revision 0, Permanently Defueled Technical Specifications for the Independent Spent Fuel Storage Installation to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pools 3F0316-01, License Amendment Request No. 320, Revision 0, Cyber Security Plan Implementation Schedule Milestone 82016-03-31031 March 2016 License Amendment Request No. 320, Revision 0, Cyber Security Plan Implementation Schedule Milestone 8 3F0915-01, Supplement to Application for Order Approving Transfer of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.902015-09-22022 September 2015 Supplement to Application for Order Approving Transfer of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 3F0815-01, License Amendment Request No. 318, Revision 0, Permanently Defueled Emergency Plan, Revision 2, and Permanently Defueled Emergency Action Level Bases Manual, Revision 1, for the Independent Spent Fuel Storage Installation2015-08-27027 August 2015 License Amendment Request No. 318, Revision 0, Permanently Defueled Emergency Plan, Revision 2, and Permanently Defueled Emergency Action Level Bases Manual, Revision 1, for the Independent Spent Fuel Storage Installation 3F0715-03, Application for Order Approving Transfer of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.902015-07-28028 July 2015 Application for Order Approving Transfer of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 3F1114-01, Application for Order Approving Transfer of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.902014-11-0707 November 2014 Application for Order Approving Transfer of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 RA-13-1001, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 82013-12-19019 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 3F0913-04, License Amendment Request 315, Revision 0, Permanently Defueled Emergency Plan and Emergency Action Level Scheme, and Request for Exemption to Certain Radiological Emergency Response Plan Requirements Defined by 10 CFR 502013-09-26026 September 2013 License Amendment Request #315, Revision 0, Permanently Defueled Emergency Plan and Emergency Action Level Scheme, and Request for Exemption to Certain Radiological Emergency Response Plan Requirements Defined by 10 CFR 50 3F0913-02, License Amendment Request 313, Revision 1, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions and Response to Requests for Additional Information2013-09-0404 September 2013 License Amendment Request #313, Revision 1, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions and Response to Requests for Additional Information 3F0413-01, License Amendment Request 313, Revision 0, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions2013-04-25025 April 2013 License Amendment Request #313, Revision 0, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions 3F0313-03, Renewal of the Crystal River Units 1, 2 and 3 Industrial Wastewater Permit FL00001592013-03-0606 March 2013 Renewal of the Crystal River Units 1, 2 and 3 Industrial Wastewater Permit FL0000159 RA-12-031, Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones2012-09-12012 September 2012 Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones 3F0112-10, License Amendment Request 311, Revision 1, Emergency Feedwater Pump Fuel Oil Volume2012-01-19019 January 2012 License Amendment Request #311, Revision 1, Emergency Feedwater Pump Fuel Oil Volume 3F0611-02, Attachments 1, 2 & 3, 4 & 6 Crystal River Unit 3, License Amendment Request 309, Revision 0 Attachment 1, Description of Proposed Change, Background, Justification for the Request, Determination of No Significant Hazards Considerations2011-06-15015 June 2011 Attachments 1, 2 & 3, 4 & 6 Crystal River Unit 3, License Amendment Request #309, Revision 0 Attachment 1, Description of Proposed Change, Background, Justification for the Request, Determination of No Significant Hazards Considerations RA-11-010, Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.502011-03-30030 March 2011 Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.50 3F0311-04, License Amendment Request 313, Revision 0 Revise Shutdown Margin Definition for Stuck Rod Exception2011-03-24024 March 2011 License Amendment Request #313, Revision 0 Revise Shutdown Margin Definition for Stuck Rod Exception 3F0211-01, License Amendment Request 311, Revision 0, Emergency Feedwater Pump Fuel Oil Volume2011-02-25025 February 2011 License Amendment Request #311, Revision 0, Emergency Feedwater Pump Fuel Oil Volume 3F1210-05, License Amendment Request 310, Revision 0, Departure from a Method of Evaluation for Auxiliary Building Overhead Crane and Revisions to Associated Commitments2010-12-20020 December 2010 License Amendment Request #310, Revision 0, Departure from a Method of Evaluation for Auxiliary Building Overhead Crane and Revisions to Associated Commitments RA-10-011, Request for Approval of the Carolina Power & Light Company and Florida Power Corporation Cyber Security Plan2010-07-0808 July 2010 Request for Approval of the Carolina Power & Light Company and Florida Power Corporation Cyber Security Plan 3F0209-05, License Amendment Request 307, Revision 0, Methodology for Rod Ejection Accident Analysis Under Extended Power Uprate Conditions2009-02-26026 February 2009 License Amendment Request #307, Revision 0, Methodology for Rod Ejection Accident Analysis Under Extended Power Uprate Conditions 3F0209-06, License Amendment Request 310, Revision 0: Application to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Technical Specification2009-02-26026 February 2009 License Amendment Request #310, Revision 0: Application to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Technical Specification 3F1208-06, License Amendment Request 300, Revision 0 Addition of TSTF 479, Revision 0 and TSTF 497, Revision 0 to the Inservice Testing (IST) Program2008-12-17017 December 2008 License Amendment Request #300, Revision 0 Addition of TSTF 479, Revision 0 and TSTF 497, Revision 0 to the Inservice Testing (IST) Program ML0900502532008-12-16016 December 2008 Systems Drawings Supporting License Renewal ML0900800552008-12-16016 December 2008 License Renewal Application. Cover Page to Section 3.2 ML0900800562008-12-16016 December 2008 License Renewal Application. Section 3.3 ML0900807292008-12-16016 December 2008 License Renewal Application. Section 3.5 to End ML0900807312008-11-30030 November 2008 License Renewal Application, Consisting of Applicant'S Environmental Report 3F1108-01, License Amendment Request 304, Revision 0, Emergency Diesel Generator Voltage and Frequency Limits Revision2008-11-0606 November 2008 License Amendment Request #304, Revision 0, Emergency Diesel Generator Voltage and Frequency Limits Revision ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 3F0808-01, License Amendment Request 301, Revision 0, Application to Modify Improved Technical Specifications for Replacement Steam Generators2008-08-28028 August 2008 License Amendment Request #301, Revision 0, Application to Modify Improved Technical Specifications for Replacement Steam Generators 3F0708-09, License Amendment Request 299, Revision 1, Supplement 1, Application to Revise Technical Specifications Control Room Envelope Habitability in Accordance with TSTF 448, Revision 3, Using the Consolidated Line Item..2008-07-29029 July 2008 License Amendment Request #299, Revision 1, Supplement 1, Application to Revise Technical Specifications Control Room Envelope Habitability in Accordance with TSTF 448, Revision 3, Using the Consolidated Line Item.. 3F0608-08, License Amendment Request 299, Revision 1: Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process..2008-06-19019 June 2008 License Amendment Request #299, Revision 1: Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process.. 3F0108-14, License Amendment Request 298, Revision 0: Application to Modify Improved Technical Specifications for Replacement Steam Generators2008-01-22022 January 2008 License Amendment Request #298, Revision 0: Application to Modify Improved Technical Specifications for Replacement Steam Generators 3F0108-03, License Amendment Request 302, Revision 0, Surveillance Requirement (SR) 3.7.5.2: Emergency Feedwater System2008-01-17017 January 2008 License Amendment Request #302, Revision 0, Surveillance Requirement (SR) 3.7.5.2: Emergency Feedwater System 3F1007-01, License Amendment Request No. 275, Revision 0, Application for Technical Specification Change TSTF-374, Revision to ITS 5.6.2.14 and Associated Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process2007-10-25025 October 2007 License Amendment Request No. 275, Revision 0, Application for Technical Specification Change TSTF-374, Revision to ITS 5.6.2.14 and Associated Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process 3F0807-05, License Amendment Request (LAR) 296, Revision 1, Supplement 1: Measurement Uncertainty Recapture, Submittal of the Cameron Bounding Uncertainty Analysis Report2007-08-30030 August 2007 License Amendment Request (LAR) #296, Revision 1, Supplement 1: Measurement Uncertainty Recapture, Submittal of the Cameron Bounding Uncertainty Analysis Report 3F0807-03, License Amendment Request 294, Revision 0, Elimination of Spent Fuel Pool Missile Shields, Supplement 12007-08-23023 August 2007 License Amendment Request #294, Revision 0, Elimination of Spent Fuel Pool Missile Shields, Supplement #1 2023-06-09
[Table view] Category:Technical Specification
MONTHYEARML17027A1642017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254, Section 4.0 ML17027A1652017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254 Section 5.0 ML17027A1632017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254, Table of Contents 3F0515-05, Technical Specifications Bases Control Program2015-05-27027 May 2015 Technical Specifications Bases Control Program 3F0515-01, License Amendment Request 317, Revision 0, Revision to Improved Technical Specifications Administrative Controls Section to Establish Permanently Defueled Technical Specifications2015-05-0707 May 2015 License Amendment Request #317, Revision 0, Revision to Improved Technical Specifications Administrative Controls Section to Establish Permanently Defueled Technical Specifications 3F0611-02, Attachments 1, 2 & 3, 4 & 6 Crystal River Unit 3, License Amendment Request 309, Revision 0 Attachment 1, Description of Proposed Change, Background, Justification for the Request, Determination of No Significant Hazards Considerations2011-06-15015 June 2011 Attachments 1, 2 & 3, 4 & 6 Crystal River Unit 3, License Amendment Request #309, Revision 0 Attachment 1, Description of Proposed Change, Background, Justification for the Request, Determination of No Significant Hazards Considerations ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 3F0108-14, License Amendment Request 298, Revision 0: Application to Modify Improved Technical Specifications for Replacement Steam Generators2008-01-22022 January 2008 License Amendment Request #298, Revision 0: Application to Modify Improved Technical Specifications for Replacement Steam Generators 3F1007-01, License Amendment Request No. 275, Revision 0, Application for Technical Specification Change TSTF-374, Revision to ITS 5.6.2.14 and Associated Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process2007-10-25025 October 2007 License Amendment Request No. 275, Revision 0, Application for Technical Specification Change TSTF-374, Revision to ITS 5.6.2.14 and Associated Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process 3F0407-06, 2006 Technical Specifications Bases Control Program2007-04-30030 April 2007 2006 Technical Specifications Bases Control Program 3F0307-08, License Amendment Request No. 291, Revision 1, Application for Improved Technical Specification Change to Add LCO 3.0.8 on the Operability of Snubbers Using the Consolidated Line Item Improvement Process2007-03-14014 March 2007 License Amendment Request No. 291, Revision 1, Application for Improved Technical Specification Change to Add LCO 3.0.8 on the Operability of Snubbers Using the Consolidated Line Item Improvement Process 3F1006-02, License Amendment Request 293, Revision 0 Revised Improved Technical Specification (ITS) 3.7.7, Nuclear Services Closed Cycle Cooling Water (SW) System2006-10-11011 October 2006 License Amendment Request #293, Revision 0 Revised Improved Technical Specification (ITS) 3.7.7, Nuclear Services Closed Cycle Cooling Water (SW) System 3F0506-05, 2005 Technical Specifications Bases Control Program2006-05-0202 May 2006 2005 Technical Specifications Bases Control Program ML0525902332005-09-15015 September 2005 T. S. for License Amendment, Temporary Extension of the Nuclear Services Seawater System Train Completion Time ML0509604192005-04-0505 April 2005 Tech Spec Pages for Amendment 216 Eliminating of Requirements for Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0429506192004-10-15015 October 2004 Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process 3F0904-02, License Amendment Request No. 284, Revision 0, Application for Technical Specification Improvement to Relax Requirement for Hydrogen Monitors Using the Consolidated Line Item Improvement Process2004-09-21021 September 2004 License Amendment Request No. 284, Revision 0, Application for Technical Specification Improvement to Relax Requirement for Hydrogen Monitors Using the Consolidated Line Item Improvement Process 3F0704-03, License Amendment Request 285, Revision 0, Deletion of One-Time Use Footnotes2004-07-0808 July 2004 License Amendment Request #285, Revision 0, Deletion of One-Time Use Footnotes 3F0404-03, Technical Specifications Bases Control Program2004-04-15015 April 2004 Technical Specifications Bases Control Program 3F0204-05, License Amendment Request No. 279, Revision 0, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Sampling System for Babcock & Wilcox Reactors Using the Consolidated Line Item.2004-02-27027 February 2004 License Amendment Request No. 279, Revision 0, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Sampling System for Babcock & Wilcox Reactors Using the Consolidated Line Item. 3F0703-04, License Amendment Request 280, Rev. 0 Revised Improved Technical Specification (ITS) 3.7.9, Nuclear Services Seawater System2003-07-14014 July 2003 License Amendment Request 280, Rev. 0 Revised Improved Technical Specification (ITS) 3.7.9, Nuclear Services Seawater System 3F0502-06, Technical Specifications Bases Control Program2002-05-31031 May 2002 Technical Specifications Bases Control Program 2017-06-27
[Table view] Category:Amendment
MONTHYEARML17027A1632017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254, Table of Contents ML17027A1642017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254, Section 4.0 ML17027A1652017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254 Section 5.0 3F0515-01, License Amendment Request 317, Revision 0, Revision to Improved Technical Specifications Administrative Controls Section to Establish Permanently Defueled Technical Specifications2015-05-0707 May 2015 License Amendment Request #317, Revision 0, Revision to Improved Technical Specifications Administrative Controls Section to Establish Permanently Defueled Technical Specifications ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 3F0108-14, License Amendment Request 298, Revision 0: Application to Modify Improved Technical Specifications for Replacement Steam Generators2008-01-22022 January 2008 License Amendment Request #298, Revision 0: Application to Modify Improved Technical Specifications for Replacement Steam Generators 3F1007-01, License Amendment Request No. 275, Revision 0, Application for Technical Specification Change TSTF-374, Revision to ITS 5.6.2.14 and Associated Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process2007-10-25025 October 2007 License Amendment Request No. 275, Revision 0, Application for Technical Specification Change TSTF-374, Revision to ITS 5.6.2.14 and Associated Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process 3F0307-08, License Amendment Request No. 291, Revision 1, Application for Improved Technical Specification Change to Add LCO 3.0.8 on the Operability of Snubbers Using the Consolidated Line Item Improvement Process2007-03-14014 March 2007 License Amendment Request No. 291, Revision 1, Application for Improved Technical Specification Change to Add LCO 3.0.8 on the Operability of Snubbers Using the Consolidated Line Item Improvement Process 3F1006-02, License Amendment Request 293, Revision 0 Revised Improved Technical Specification (ITS) 3.7.7, Nuclear Services Closed Cycle Cooling Water (SW) System2006-10-11011 October 2006 License Amendment Request #293, Revision 0 Revised Improved Technical Specification (ITS) 3.7.7, Nuclear Services Closed Cycle Cooling Water (SW) System ML0525902332005-09-15015 September 2005 T. S. for License Amendment, Temporary Extension of the Nuclear Services Seawater System Train Completion Time ML0509604192005-04-0505 April 2005 Tech Spec Pages for Amendment 216 Eliminating of Requirements for Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0429506192004-10-15015 October 2004 Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process 3F0904-02, License Amendment Request No. 284, Revision 0, Application for Technical Specification Improvement to Relax Requirement for Hydrogen Monitors Using the Consolidated Line Item Improvement Process2004-09-21021 September 2004 License Amendment Request No. 284, Revision 0, Application for Technical Specification Improvement to Relax Requirement for Hydrogen Monitors Using the Consolidated Line Item Improvement Process 3F0704-03, License Amendment Request 285, Revision 0, Deletion of One-Time Use Footnotes2004-07-0808 July 2004 License Amendment Request #285, Revision 0, Deletion of One-Time Use Footnotes 3F0204-05, License Amendment Request No. 279, Revision 0, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Sampling System for Babcock & Wilcox Reactors Using the Consolidated Line Item.2004-02-27027 February 2004 License Amendment Request No. 279, Revision 0, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Sampling System for Babcock & Wilcox Reactors Using the Consolidated Line Item. 3F0703-04, License Amendment Request 280, Rev. 0 Revised Improved Technical Specification (ITS) 3.7.9, Nuclear Services Seawater System2003-07-14014 July 2003 License Amendment Request 280, Rev. 0 Revised Improved Technical Specification (ITS) 3.7.9, Nuclear Services Seawater System 2017-06-27
[Table view] |
Text
Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 50.90 September 21, 2004 3F0904-02 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - License Amendment Request No. 284, Revision 0, Application For Technical Specification Improvement To Relax Requirement For Hydrogen Monitors Using The Consolidated Line Item Improvement Process Gentlemen:
Pursuant to 10 CFR 50.90, Florida Power Corporation, doing business as Progress Energy Florida, Inc. (PEF), hereby requests an amendment to the Improved Technical Specifications (ITS) for Crystal River - Unit 3 (CR-3).
The proposed amendment will delete the CR-3 ITS requirement related to containment hydrogen monitors. The proposed ITS changes support implementation of the revisions to 10 CFR 50.44, "Standards for Combustible Gas Control System in Light-Water-Cooled Power Reactors," that became effective on October 16, 2003. The changes are consistent with Revision 1 of NRC-approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-447, "Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors." The availability of this TS improvement was announced in the Federal Register on September 25, 2003, (68 FR 55416), as part of the consolidated line item improvement process (CLIIP).
Attachment 1 provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications and commitments. Attachment 2 provides the existing TS pages marked-up to show the proposed change. Attachment 3 provides revised, clean TS pages. Implementation of TSTF-447 also involves various changes to the TS Bases. The TS Bases changes will be submitted with a future update in accordance with ITS 5.6.2.17, "Technical Specifications (TS) Bases Control Program."
PEF requests approval of the proposed License Amendment by February 28, 2005, with the amendment being implemented within 60 days.
The CR-3 Plant Nuclear Safety Committee has reviewed this request and recommended it for approval.
Progress Energy Florida, Inc.
Crystal River Nuclear Plant 15760 %V. Powerline Street D O Crystal River, FL 34428
U.S. Nuclear Regulatory Commission Page 2 of 3 3F0904-02 In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Florida State Official.
If you should have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing & Regulatory Programs, at (352) 5634883.
Sincerely, Dale E. Young Vice President Crystal River Nuclear Plant Attachments: 1. Description and Assessment
- 2. Proposed Technical Specification Changes
- 3. Revised Technical Specification Pages
- 4. Regulatory Commitments cc: NRR Project Manager Regional Office Resident Inspector State Contact
U.S. Nuclear Regulatory Commission Page 3 of 3 3F0904-02 STATE OF FLORIDA COUNTY OF CITRUS Dale E. Young states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation, doing business as Progress Energy Florida, Inc.; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.
At& Z6:4&-,
Dale E. Young Vice President v 6)-
Crystal River Nuclear Plant The foregoing document was acknowledged before me this a1I day of SrfpCMbe' 2004, by Dale E. Young M' - /
Signature of Notar/y Public State of Florida LISA A. MORRIS 17tl - We of Pkm
. ,<7t Cwwnsm i DD2491569
_ V eWN*yN LISA A MO RL .
(Print, type, or stamp Commissioned Name of Notary Public)
Personally Produced Known Y -OR- Identification
PROGRESS ENERGY FLORIDA, INC.
CRYSTAL RIVER - UNIT 3 DOCKET NUMBER 50-302/ LICENSE NUMBER DPR -72 License Amendment Request No. 284, Revision 0, Application For Technical Specification Improvement To Relax Requirements For Hydrogen Monitors '
Using The Consolidated Line Item Improvement Process ATTACHMENT 1 Description and Assessment
U.S. Nuclear Regulatory Commission Attachment 1 3F0904-02 Page 1 of 3 DESCRIPTION AND ASSESSMENT
1.0 INTRODUCTION
The proposed License amendment deletes references to the hydrogen monitors in the Crystal River - Unit 3 (CR-3) Improved Technical Specifications (ITS) 3.3.17, "Post Accident Monitoring (PAM) Instrumentation." The proposed ITS changes support implementation of the revisions to 10 CFR 50.44, "Standards for Combustible Gas Control System in Light-Water-Cooled Power Reactors," that became effective on October 16, 2003.
The changes are consistent with Revision 1 of NRC-approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-447, "Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors." The availability of this ITS improvement was announced in the FederalRegister on September 25, 2003, (68 FR 55416), as part of the consolidated line item improvement process (CLIIP).
2.0 DESCRIPTION
OF PROPOSED AMENDMENT Consistent with the NRC-approved Revision 1 of TSTF-447, the proposed ITS changes include:
ITS 3.3.17 SR 3.3.17.2, NOTE Deleted Table 3.3.17-1 Item 12, Containment Hydrogen Deleted Concentration As described in NRC-approved Revision 1 of TSTF-447, the changes to ITS requirements results in changes to various ITS Bases sections. The ITS Bases changes will be submitted with a future update in accordance with TS 5.6.2.17, 'Technical Specifications (TS) Bases Control Program."
3.0 BACKGROUND
The background for this application is adequately addressed by the NRC Notice of Availability published on September 25, 2003, (68 FR 55416), TSTF-447, the documentation associated with the 10 CFR 50.44 rulemaking, and other related documents.
4.0 REGULATORY REQUIREMENTS AND GUIDANCE The applicable regulatory requirements and guidance associated with this application are adequately addressed by the NRC Notice of Availability published on September 25, 2003, (68 FR 55416), TSTF-447, the documentation associated with the 10 CFR 50.44 rulemaking, and other related documents.
U.S. Nuclear Regulatory Commission Attachment 1 3F0904-02 Page 2 of 3
5.0 TECHNICAL ANALYSIS
Florida Power Corporation, doing business as Progress Energy Florida, Inc. (PEF), has reviewed the safety evaluation (SE) published on September 25, 2003, (68 FR 55416), as part of the CLIIP Notice of Availability. This verification included a review of the NRC staff's SE, as well as the supporting information provided to support TSTF-447. PEF has concluded that the justifications presented in the TSTF proposal and the SE prepared by the NRC staff are applicable to Crystal River - Unit 3 (CR-3) and justify this amendment for the incorporation of the changes to the CR-3 ITS.
6.0 REGULATORY ANALYSIS
A description of this proposed change and its relationship to applicable regulatory requirements and guidance was provided in the NRC Notice of Availability published on September 25, 2003, (68 FR 55416), TSTF-447, the documentation associated with the 10 CFR 50.44 rulemaking, and other related documents.
6.1 Verification and Commitments As discussed in the model SE published in the FederalRegisteron September 25, 2003, (68 FR 55416), for this TS improvement, PEF is making the following verifications and regulatory commitments:
- 1. PEF has verified that a hydrogen monitoring system capable of diagnosing beyond design-basis accidents is installed at CR-3 and is making a regulatory commitment to maintain that capability at the appropriate Regulatory Guide 1.97 category.
The hydrogen monitors installed at CR-3 are capable of monitoring the hydrogen concentration in containment within the indicating range of 0 to 10% hydrogen. This range was previously approved by the NRC as acceptable and remains sufficient to support this license amendment request. In addition, a CR-3 regulatory commitment established as part of the removal of the Post Accident Sampling System from the CR-3 Improved Technical Specifications included provisions for obtaining grab samples of the containment atmosphere which can be used to supplement the hydrogen monitors.
The requirements for maintaining a hydrogen monitoring system capable of diagnosing beyond design-basis accidents as described above will be included in the Regulatory Guide 1.97 Instrumentation described in the CR-3 Final Safety Analysis Report (FSAR) Section 7.3.5. The FSAR will be revised at the next scheduled update following implementation of the TS amendment.
- 2. CR-3 does not have an inerted containment.
U.S. Nuclear Regulatory Commission Attachment 1 3F0904-02 Page 3 of 3 7.0 NO SIGNIFICANT HAZARDS CONSIDERATION PEF has reviewed the proposed no significant hazards consideration determination published on September 25, 2003, (68 FR 55416), as part of the CLIIP. PEF has concluded that the proposed determination presented in the notice is applicable to CR-3 and the determination is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.91(a).
8.0 ENVIRONMENTAL EVALUATION PEF has reviewed the environmental evaluation included in the model SE published on September 25, 2003, (68 FR 55416), as part of the CLIIP. PEF has concluded that the staff's findings presented in that evaluation are applicable to CR-3 and the evaluation is hereby incorporated by reference for this application.
9.0 PRECEDENT This application is being made in accordance with the CLIIP. PEF is not proposing variations or deviations from the TS changes described in TSTF-447 or the NRC staff's model SE published on September 25, 2003, (68 FR 55416).
10.0 REFERENCES
Federal Register Notice: Notice of Availability of Model Application Concerning Technical Specification Improvement To Eliminate Hydrogen Recombiner Requirement, and Relax the Hydrogen and Oxygen Monitor Requirements for Light Water Reactors Using the Consolidated Line Item Improvement Process, published September 25, 2003, (68 FR 55416).
PROGRESS ENERGY FLORIDA, INC.
CRYSTAL RIVER - UNIT 3 DOCKET NUMBER 50-302/ LICENSE NUMBER DPR -72 License Amendment Request No. 284, Revision 0, Application For Technical Specification Improvement To Relax Requirements For Hydrogen Monitors Using The Consolidated Line Item Improvement Process ATTACHMENT 2 Proposed Technical Specification Changes
PAM Instrumentation 3.3.17 SURVEILLANCE REQUIREMENTS
NOTE--------------------------------------
These SRs apply to each PAM instrumentation Function in Table 3.3.17-1.
SURVEILLANCE FREQUENCY SR 3.3.17.1 --------------------NOTE---------------------
Not required for Function 4.
Perform CHANNEL CHECK for each required 31 days instrumentation channel that is normally energized.
SR 3.3.17.2 ------------------ NOTE ---------------------- NOTE Neutron detectors are excluded from CHANNEL The Frequency CALIBRATION. for Function 12
_____________________________________________ is 18 months.
NOTE ----------------------
Not required for Functions 23 and 25.
Perform CHANNEL CALIBRATION. 24 months SR 3.3.17.3 ------------------NOTE --------------------
Only required for Functions 23 and 25.
Perform__CHANNELFUNCTIONALTEST._24_months Perform CHANNEL FUNCTIONAL TEST. 24 months.
Crystal River Unit 3 3.3-40 Amendment No. 17-7
PAM Instrumentation 3.3.17 Table 3.3 .17-1 (page 1 of 1)
Post Accident Monitoring Instrumentation CONDITIONS REFERENCED FROM FUNCTION REQUIRED CHANNELS REQUIRED ACTION D.1
- 1. Wide Range Neutron Flux 2 E
- 2. RCS Hot Leg Temperature 2 E
- 3. RCS Pressure (Wide Range) 2 E
- 4. Reactor Coolant Inventory 2 F
- 5. Borated Water Storage Tank Level 2 E
- 6. High Pressure Injection Flow 2 per injection line E
- 7. Containment Sump Water Level (Flood Level) 2 E
- 8. Containment Pressure (Expected Post-Accident 2 E Range)
- 9. Containment Pressure (Wide Range) 2
- 10. Containment Isolation Valve Position 2 per penetrationa)b)
- 11. Containment Area Radiation (High Range) 2
- 12. Ro_RU0siEe~ntainment Hydrogen Concentration
-2
- 13. Pressurizer Level
- 14. Steam Generator Water Level (Start-up Range) 2 per OTSG
- 15. Steam Generator Water Level (Operating Range) 2 per OTSG 2 per OTSG
- 16. Steam Generator Pressure
- 17. Emergency Feedwater Tank Level 2 18a. Core Exit Temperature (Thermocouple) 2 thermocouples per core quadrant 18b. Core Exit Temperature (Recorder) 2
- 19. Emergency Feedwater Flow 2 per OTSG
- 20. Low Pressure Injection Flow 2
- 21. Degrees of Subcooling 2
- 22. Emergency Diesel Generator kW Indication 2cc)
- 23. LPI Pump Run Status 2
- 24. DHV-42 and DHV-43 Open Position 2
- 25. HPI Pump Run Status 2
- 26. RCS Pressure (Low Range) 2 (a) Only one position indication is required for penetrations with one Control Room indicator.
(b) Not required for isolation valves whose associated penetration is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
(c) One indicator per EDG.
Crystal River Unit 3 3. 3-41 Amendment No. i--
PROGRESS ENERGY FLORIDA, INC.
CRYSTAL RIVER - UNIT 3 DOCKET NUMBER 50-302/ LICENSE NUMBER DPR -72 License Amendment Request No. 284, Revision 0, Application For Technical Specification Improvement To Relax Requirements For Hydrogen Monitors Using The Consolidated Line Item Improvement Process ATTACHMENT 3 Revised Technical Specification Changes
PAM Instrumentation 3.3.17 SURVEILLANCE REQUIREMENTS
NOTE--------------------------------------
These SRs apply to each PAM instrumentation Function in Table 3.3.17-1.
SURVEILLANCE FREQUENCY SR 3.3.17.1 --------------------NOTE---------------------
Not required for Function 4.
Perform CHANNEL CHECK for each required 31 days instrumentation channel that is normally energized.
SR 3.3.17.2 ------------------ NOTE ----------------------
Neutron detectors are excluded from CHANNEL CALIBRATION.
NOTE ----------------------
Not required for Functions 23 and 25.
Perform CHANNEL CALIBRATION. 24 months SR 3.3.17.3 ------------------ NOTE --
Only required for Functions 23 and 25.
Perform__CHANNELFUNCTIONALTEST._24_months Perform CHANNEL FUNCTIONAL TEST. 24 months Crystal River Unit 3 3. 3-40 Amendment No.
PAM Instrumentation 3.3.17 Table 3.3.17-1 (page 1 of 1)
Post Accident Monitoring Instrumentation CONDITIONS REFERENCED FROM FUNCTION REQUIRED CHANNELS REQUIRED ACTION D.1
- 1. Wide Range Neutron Flux 2 E
- 2. RCS Hot Leg Temperature 2 E
- 3. RCS Pressure (Wide Range) 2 E
- 4. Reactor Coolant Inventory 2 F
- 5. Borated Water Storage Tank Level 2 E
- 6. High Pressure Injection Flow 2 per injection line E
- 7. Containment Sump Water Level (Flood Level) 2 E
- 8. Containment Pressure (Expected Post-Accident 2 E Range)
- 9. Containment Pressure (Wide Range) 2 E
- 10. Containment Isolation Valve Position 2 per penetration')"" E
- 11. Containment Area Radiation (High Range) 2 F
- 12. Not Used
- 13. Pressurizer Level 2 E
- 14. Steam Generator Water Level (Start-up Range) 2 per OTSG E
- 15. Steam Generator Water Level (Operating Range) 2 per OTSG E
- 16. Steam Generator Pressure 2 per OTSG E
- 17. Emergency Feedwater Tank Level 2 E 18a. Core Exit Temperature (Thermocouple) 2 thermocouples per E core quadrant 18b. Core Exit Temperature (Recorder) 2 E
- 19. Emergency Feedwater Flow 2 per OTSG E
- 20. Low Pressure Injection Flow 2 E
- 21. Degrees of Subcooling 2 E
- 22. Emergency Diesel Generator kW Indication 2"' E
- 23. LPI Pump Run Status E
- 24. DHV-42 and DHV-43 Open Position 2 E
- 25. HPI Pump Run Status 2 E
- 26. RCS Pressure (Low Range) 2 E (a) Only one position indication is required for penetrations with one Control Room indicator.
(b) Not required for isolation valves whose associated penetration is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
(d) One indicator per EDG.
Crystal River Unit 3 3. 3-41 Amendment No.
PROGRESS ENERGY FLORIDA, INC.
CRYSTAL RIVER - UNIT 3 DOCKET NUMBER 50-302/ LICENSE NUMBER DPR -72 License Amendment Request No. 284, Revision 0, Application For Technical Specification Improvement To Relax Requirements For Hydrogen Monitors Using The Consolidated Line Item Improvement Process ATTACHMENT 4 Regulatory Commitments
U.S. Nuclear Regulatory Commission Attachment 4 3F0904-02 Page 1 of 1 Regulatory Commitments The following table identifies those actions committed to by Progress Energy Florida, Inc. (PEF) in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments. Please direct questions regarding these commitments to Mr. Sid Powell, Supervisor, Licensing & Regulatory Programs, at (352) 563-4883.
Regulatory Commitments Due date/event PEF has verified that a hydrogen monitoring system capable of Complete diagnosing beyond design-basis accidents is installed at CR-3 and is making a regulatory commitment to maintain that capability at the appropriate Regulatory Guide 1.97 category. The hydrogen monitors are included in plant procedures.