ML050960419
| ML050960419 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/05/2005 |
| From: | NRC/NRR/DLPM |
| To: | |
| Mozafari B,NRR/DLPM, 415-2020 | |
| Shared Package | |
| ML050960005 | List: |
| References | |
| TAC MC4452 | |
| Download: ML050960419 (2) | |
Text
I PAM Instrumentation 3.3.17 SURVEILLANCE REQUIREMENTS
NOTE----------------- ___ ______________
These SRs apply to each PAM instrumentation Function in Table 3.3.17-1.
SURVEILLANCE FREQUENCY SR 3.3.17.1
NOTE---------------------
Not required for Function 4.
Perform CHANNEL CHECK for each required 31 days instrumentation channel that is normally energized.
NOTE ----------------------
Neutron detectors are excluded from CHANNEL CALIBRATION.
NOTE ----------------------
Not required for Functions 23 and 25.
Perform CHANNEL CALIBRATION.
24 months SR 3.3.17.3
NOTE --------------------
Only required for Functions 23 and 25.
Perform CHANNEL FUNCTIONAL TEST.
24 months Crystal River Unit 3 3.3-40 Amendment No.21-6
PAM I nstrumentat i on 3.3.17 Table 3.3.17-1 (page 1 of 1)
Post Accident Monitoring Instrumentation FUNCTION
- 1.
Wide Range Neutron Flux
- 2.
RCS Hot Leg Temperature
- 3.
RCS Pressure (Wide Range)
- 4.
Reactor Coolant Inventory
- 5.
Borated Water Storage Tank Level
- 6.
High Pressure Injection Flow
- 7.
Containment Sump Water Level (Flood Level)
- 8.
Containment Pressure (Expected Post-Accident Range)
- 9.
Containment Pressure (Wide Range)
- 10.
Containment Isolation Valve Position
- 11.
Containment Area Radiation (High Range)
- 12.
Not Used
- 13.
Pressurizer Level
- 14.
Steam Generator Water Level (Start-up Range)
- 15.
Steam Generator Water Level (Operating Range)
- 16.
Steam Generator Pressure
- 17.
Emergency Feedwater Tank Level 18a. Core Exit Temperature (Thermocouple)
REQUIRED CHANNELS 2
2 2
2 2
2 per Injection line 2
2 2
2 per penetration(,,)(b) 2 2
2 per OTSG 2 per OTSG 2 per OTSG 2
2 thermocouples per core quadrant 2
2 per OTSG 2
2 2 (c) 2 2
2 2
CONDITIONS REFERENCED FROM REQUIRED ACTION D.1 E
E E
F E
E E
E E
E F
E E
E E
E E
E E
E E
E E
E E
E I
18b.
19.
20.
21.
22.
23.
24.
25.
26.
Core Exit Temperature (Recorder)
Emergency Feedwater Flow Low Pressure Injection Flow Degrees of Subcooling Emergency Diesel Generator kW Indication LPI Pump Run Status DHV-42 and DHV-43 Open Position HPI Pump Run Status RCS Pressure (Low Range)
(a) Only one position indication is required for penetrations with one Control Rom Indicator.
(b) Not required for isolation valves whose associated penetration is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange. or check valve with flow through the valve secured.
(d) One indicator per EDG.
Crystal River Unit 3 3.3-41 Amendment No.216