Text

ECCS - Operating 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.2 ECCS-Operating LCO 3.5.2 Two ECCS trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more trains A.1 Restore train(s) to 72* hours inoperable. OPERABLE status.

AND At least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

  • On a one-time basis, an Emergency Core Cooling System train may be inoperable as specified by Required Action A.1 for up to 10 days to allow performance of Decay Heat Seawater System Pump RWP-3B repairs online. Upon completion of the refurbishment and system restoration this footnote is no longer applicable.

Crystal River Unit 3 3.5-4 Amendment No. 221

Reactor Building Spray and Containment Cooling Systems 3.6.6 3.6 CONTAINMENT SYSTEMS 3.6.6 Reactor Building Spray and Containment Cooling Systems LCO 3.6.6 Two reactor building spray trains and two containment cooling trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One reactor building A.1 Restore reactor 72* hours I spray train building spray train inoperable. to OPERABLE status. AND 10 days from discovery of failure to meet the LCO B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A AND not met.

B.2 Be in MODE 5. 84-hours C. One required C.1 Restore required 7 days containment cooling containment cooling train inoperable. train to OPERABLE AND status.

10 days from discovery of failure to meet the LCO (continued)

  • On a one-time basis. a Reactor Buildina SDrav Svstem train mav be inoDerable as sDecified bv Reauired Action A.1 for uD to 10 davs to allow Derformance of Decav Heat Seawater Svstem PumD RWP-3B reoairs online. UDon comoletion of the refurbishment and system restoration this footnote is no longer applicable.

Crystal River Unit 3 3.6-17 Amendment No. 221

DC System 3.7.8 3.8 PLANT SYSTEMS 3.7.8 Decay Heat Closed Cycle Cooling Water (DC) System LCO 3.7.8 Two DC trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One DC train A.1 ------ NOTE----------- 72* hours inoperable. Enter applicable Conditions and Required Actions of LCO 3.4.5, "RCS Loops-MODE 4," for required decay heat removal loops made inoperable by DC train inoperability.

Restore DC train to OPERABLE status.

B. Required Action and B.1 Be in Mode 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in Mode 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • On a one-time basis, a Decay Heat Closed Cycle Cooling Water System train may be inoperable as specified by Required Action A.1 for up to 10 days to allow performance of Decay Heat Seawater System Pump RWP-3B repairs online.

Upon completion of the refurbishment and system restoration this footnote is no longer applicable.

Crystal River Unit 3 3.7-17 Amendment No. 221

Decay Heat Seawater System 3.7.10 3.7 PLANT SYSTEMS 3.7.10 Decay Heat Seawater System LCO 3.7.10 Two Decay Heat Seawater System trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. One Decay Heat A.1 -------- NOTE--------- 72* hours Seawater System Enter applicable train inoperable. Conditions and Required Actions of LCO 3.4.5, "RCS Loops-MODE 4," for required decay heat removal loops made inoperable by Decay Heat Seawater System train inoperability.

Restore Decay Heat Seawater System train to OPERABLE status.

B. Required Action and B.1 Be in Mode 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in Mode 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

  • On a one-time basis, a Decay Heat Seawater System train may be inoperable as specified by Required Action A.1 for up to 10 days to allow performance of Decay Heat Seawater System Pump RWP-3B repairs online. Upon completion of the refurbishment and system restoration this footnote is no longer applicable.

Crystal River Unit 3 3.7-21 Amendment No. 221

ECCS-Operating B 3.5.2 BASES ACTIONS A.1 With one or more ECCS trains inoperable and at least 100% of the flow equivalent to a single OPERABLE ECCS train available, the inoperable components must be returned to OPERABLE status within 72* hours. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on NRC recommendations (Ref. 3) that are based on a risk evaluation and is a reasonable time for many repairs.

  • On a one-time basis. an Emeroencv Core Coolina Svstem train mav be inooerable as sDecified bv Reauired Action A.1 for UD to 10 davs to allow oerformance of Decav Heat Seawater Svstem Pumo RWP-3B reoairs online. 1loon comDletion of the refurbishment and system restoration this footnote is no longer applicable.

An ECCS train is inoperable if it is not capable of delivering the design flow to the RCS.

The LCO requires the OPERABILITY of a number of independent subsystems. Due to the redundancy of trains and the diversity of subsystems, the inoperability of one component in a train does not render the ECCS incapable of performing its function. Neither does the inoperability of two different cormponents, each in a di fferent train, necessarily result in a loss of function for the ECCS. The intent of this Condition is to maintain a combination of equipment such that the safety injection (SI) flow equivalent to 100%

of a single train remains available. This allows increased flexibility in plant operations under circumstances when components in opposite trains are inoperable.

For example, removing a train of the recirculation line to the RB sump or the entire bank of valves for maintenance does not render the HPI System inoperable, given the diverse ability to recirculate to the Makeup Tank. HPI satisfies Criterion 3 of the NRC Policy Statement which addresses SSCs that are part of the primary success path, and which function or actuate to mitigate a design basis accident or transient challenging a fission product barrier. Since this recirculation line supports piggyback operation in long-term coolinc and piggyback operation is notaprimary.success path, LCO 3.5 need not be entered when this recirculati on path is not available.

An event accompanied by a loss of offsite power and the failure of an EDG can disable one ECCS train until power is restored. A reliability analysis (Ref. 3) has shown the risk of having one full ECCS train inoperable to be sufficiently low to justify continued operation for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

With one or more components inoperable such that the flow equivalent to a single OPERABLE ECCS train is not available, the facility is in a condition outside the accident analyses. Therefore, LCO 3.0.3 must be immediately entered.

(continued)

Crystal River Unit 3 B 3.5-15 Amendment No. 221

Reactor Building Spray and Containment Cooling Systems B 3.6.6 BASES LCO iodine from the containment atmosphere and maintain (continued) concentrations below those assumed in the safety analysis.

To ensure that these requirements are met, two RB spray trains and two containment cooling units must be OPERABLE.

Therefore, in the event of an accident, the minimum requirements are met, assuming the worst-case single active failure occurs.

Each RB Spray System train includes a spray pump, spray headers, nozzles, valves, piping, instruments, and controls to ensure an OPERABLE flow path capable of taking suction from the BWST upon an Engineered Safeguards Actuation System signal and manually transferring suction to the reactor building emergency sump.

Each Containment Cooling System train includes demisters, cooling coils, dampers, an axial flow fan driven by a two speed water cooled electrical motor, instruments, and controls to ensure an OPERABLE flow path.

APPLICABILITY In MODES 1, 2, 3, and 4, a DBA could cause a release of radioactive material to containment and an increase in containment pressure and temperature, requiring the operation of the RB spray trains and containment cooling trains.

In MODES 5 and 6, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Thus, the RB Spray System and the Containment Cooling System are not required to be OPERABLE in MODES 5 and 6.

ACTIONS A.1 With one RB spray train inoperable, the inoperable containment spray train must be restored to OPERABLE status within 72* hours. In this Condition, the remaining OPERABLE I spray and cooling trains are adequate to perform the iodine removal and containment cooling functions. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time takes into account the redundant heat (continued)

Crystal River Unit 3 B 3. 6-39 Amendment No. 221

Reactor Building Spray and Containment Cooling Systems B 3.6.6 BASES ACTIONS A.1 (continued) removal capability afforded by the OPERABLE RB spray train and cooling system train(s), reasonable time for repairs, and the low probability of a DBA occurring during this period.

  • On a one-time basis. a Reactor Buildina SDrav Svstem train mav be inoDerable as saecified bv Reauired Action A.1 for UD to 10 davs to allow Derformance of Decav Heat Seawater Svstem PumD RWP-3B reoairs online. UDon comDletion of the refurbishment and system restoration this footnote is no longer applicable.

The 10 day portion of the Completion Time for Required Action A.1 is based upon engineering judgment. It takes into account the low probability of coincident entry into two Conditions in this LCO coupled with the low pro bability of an accident occurring durinp this time. Refer to Section 1.3, "Completion Times', for a more detailed discussion of the purpose of the "from discovery of failure to meet the LCO" portion of the Completion Time.

B.1 and B.2 If the inoperable RB spray train cannot be restored to OPERABLE status within the required Completion Time, the plant must be placed in a MODE in which the LCO does not apply. To achieve this status, the plant must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in MODE 5 within 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems. The extended interval to reach MODE 5 allows additional time to attempt restoration of the RB spray train and is reasonable when considering the driving force for a release of radioactive material from the Reactor Coolant System is reduced in MODE 3.

C.1 With one of the required containment cooling trains inoperable, the inoperable containment cooling train must be restored to OPERABLE status within 7 days. The components in this degraded condition provide iodine removal capabilities and are capable of providing at least 100% of the heat removal needs after an accident. The 7 day Completion Time was developed taking into account the redundant heat removal capabilities afforded by combinations of the RB Spray System and Containment Cooling System and the low probability of a DBA occurring during this period.

(continued)

Crystal River Unit 3 B 3.6-40 Amendment No. 221

DC System B 3.7.8 BASES ACTIONS A.1 (continued)

With one DC train inoperable, action must be taken to restore the train to OPERABLE status within 72* hours. In this Condition, the remaining OPERABLE DC train is adequate to perform the heat removal function. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time for restoring full DC System OPERABILITY is the same as that for the ECCS Systems, whose safety functions are supported by the DC System. This Completion Time is reasonable, based on the redundant capabilities afforded by the OPERABLE train and the low probability of a DBA occurring during this period.

  • On a one-time basis. a Decav Heat Closed Cvcle Cooling Water Svstem train mav be inooerable as soecified bv Reauired Action A.1 for uo to 10 davs to allow Derformance of Decav Heat Seawater Svstem PumD RWP-3B reoairs online.

UDon comoletion of the refurbishment and system restoration this footnote is no longer applicable.

B.1 and B.2 If the inoperable DC train cannot be restored to OPERABLE status within the associated Completion Time, the plant must be placed in a MODE in which the LCO does not apply. To achieve this status, the plant must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The Completion Times are reasonable, based on operating experiences to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.7.8.1 REQUIREMENTS Verifying the correct alignment for manual and power operated valves in the DC flow path provides assurance that the proper flow paths exist for DC operation. The isolation of the DC flow to individual components may render those components inoperable, but does not affect the operability of the DC system. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since they are verified to be in the correct position prior to locking, sealing, or securing.

These valves include valves in the main flow paths and the first normally closed valve in a branch line. In lieu of the first normally closed valve in the branch line, credit may be taken for verifying valve position of another valve downstream, providing the isolation of the flow path is achieved. Verifying correct valve alignment of valves immediately downstream of an unsecured valve still assures isolation of the flow path.

(continued)

Crystal River Unit 3 B 3.7-44 Amendment No. 221

Decay Heat Seawater System B 3.7.10 BASES ACTIONS A.1 Required Action A.1 is modified by a Note indicating that the applicable Conditions and Required Actions of LCO 3.4.5, "RCS Loops - MODE 4," should be entered if an inoperable decay heat seawater train results in an inoperable required DHR loop. This is an exception to LCO 3.0 6 and ensures the groper actions are taken for an inoperability of a required DHR loop.

If one of the decay heat seawater trains is inoperable, action must be taken to restore the train to OPERABLE status within 72* hours. In this Condition, the remaining OPERABLE train is adequate to perform the heat removal function. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time for restoring full Decay Heat Seawater System OPERABILITY is the same as that for the ECCS Systems, whose safety functions are supported by the Decay Heat Seawater System. This Completion Time is reasonable, based on the redundant capabilities afforded by the OPERABLE train and the low probability of a DBA occurring during this period.

  • On a one-time basis, a Decay Heat Seawater System train may be inoperable as specified by Required Action A.1 for up to 10 days to allow performance of Decay Heat Seawater System Pump RWP-3B repairs online. Upon completion of the refurbishment and system restoration this footnote is no longer applicable.

B.1 and B.2 If the inoperable decay heat seawater train cannot be restored to OPERABLE status within the associated Completion Time, the plant must be placed in a MODE in which the LCO does not apply. To achieve this status, the plant must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in MODE 5.

within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.7.10.1 REQUIREMENTS Verifying the correct alignment for manual valves in the Decay Heat Seawater System flow path provides assurance that the proper flow paths exist for DC operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since they are verified to be in the correct position prior to locking, sealing, or securing.

These valves include valves in the main flow paths and the first normally closed valve in a branch line. In lieu of the first normally closed valve in the branch line, credit may be taken for verifying valve position of another valve downstream, providing the isolation of the flow path is achieved. Verifying correct valve alignment of valves immediately downstream of an unsecured valve still assures isolation of the flow path.

(conti nued)

Crystal River Unit 3 B 3.7-54 Amendment No. 221