Finding | |
---|---|
Title | Ineffective Corrective Actions on the Main Steam Equalizing Header Drain Bypass Valve Results in an Unplanned Down Power |
Description | The inspectors identified a self-revealing finding involving inadequate corrective actions in response to a failure in the main steam equalizing header drain bypass valve, resulting in a steam leak and an unplanned plant down power. Specifically, plant personnel failed to properly address the dual indication on the bypass valve and fluid flow through the valve caused water to flash to steam accelerating pipe wall erosion and piping failure. The licensees immediate corrective actions were to identify, secure, and temporarily repair the steam leak. The licensee entered this issue into the licensees corrective action program as Condition Report CR-RBS-2011-04592. The finding was more than minor because it was associated with the equipment performance attribute of the initiating events cornerstone and affected the cornerstone objective to limit the likelihood of those events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. The inspectors reviewed the finding using Inspection Manual Chapter 0609, Appendix A, Significance Determination of Reactor Inspection Findings for At-Power Situations. Based on the Phase 1 screening of the finding, the inspectors determined that the finding was of very low safety significance (Green) because it was not a loss of coolant accident initiator, did not contribute to both the likelihood of an initiating event and the likelihood that mitigating equipment or functions would not be available, nor increase the likelihood of an external event (seismic, flooding, or severe weather event). The apparent cause of the performance deficiency was that the control room and outage control center personnel presumed that the main control room dual indication for the valve was incorrect because previously valve operation successfully closed the valve. Consequently, this finding has a crosscutting aspect in the area of human performance associated with the decision-making. |
Site: | River Bend |
---|---|
Report | IR 05000458/2011004 Section 4OA2 |
Date counted | Sep 30, 2011 (2011Q3) |
Type: | Finding: Green |
cornerstone | Initiating Events |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | L Ricketson B Baca A Barrett R Hagar G Larkin V Gaddy C Alldredge |
CCA | H.13, Consistent Process |