IR 05000458/2011403

From kanterella
Jump to navigation Jump to search
NRC Security Inspection Report 05000458-11-403
ML110530353
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/18/2011
From: Shannon M
Plant Support Branch-1
To: Mike Perito
Entergy Operations
References
IR-11-403
Download: ML110530353 (4)


Text

UNITED STATES NUC LE AR RE G ULATO RY C O M M I S S I O N ary 18, 2011

SUBJECT:

RIVER BEND STATION - NRC SECURITY INSPECTION REPORT 05000458/2011403

Dear Mr. Perito:

On February 15, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your River Bend Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed telephonically on February 15, 2011, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one NRC identified finding of very low security significance (i.e., Green as determined by the physical protection significance determination process). This deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. However, because of the very low security significance, and because this violation was entered into your corrective action program, the NRC is treating this violation as a noncited violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy. Entergy Operations, Inc. -2-If you contest this noncited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator, Region IV, U.S. Nuclear Regulatory Commission, 612 E. Lamar Blvd, Suite 400, Arlington, Texas, 76011-4125; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident Inspector at River Bend Station.

Additionally, the NRC-identified finding had a crosscutting aspect in the area of resources associated with training and qualification (H2.b). If you disagree with the crosscutting aspect assigned to the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV, and the NRC Resident Inspector at River Bend Station.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket: 50-458 License: NPF-47 Nonpublic Enclosure:

NRC Inspection Report 05000458/2011403 w/Attachment: Supplemental Information Entergy Operations, Inc. -3-cc w/o enclosure:

Senior Vice President and COO Entergy Operations, Inc P. O. Box 31995 Jackson, MS 39286-1995 Vice President, Oversight Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P. O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.

5485 US Highway 61N St. Francisville, LA 70775 Joseph A. Aluise Associate General Counsel Nuclear Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113 Entergy Operations, Inc. -4-Distribution w/enclosure:

Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov)

Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov)

Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)

Senior Resident Inspector (Grant.Larkin@nrc.gov)

Electronic distribution by RIV:

Distribution w/o enclosure:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource OEDO RIV Coordinator (James.Trapp@nrc.gov)

Security Related Complete Report - OUO:

SUNSI Review Completed: MKB ADAMS: : Yes Initials: MKB

Non-Publicly Available : Sensitive-Security- Related-Periodic Review Required Letter Only:

SUNSI Review Completed: __MKB___ ADAMS: : Yes Initials: ___MKB___

Publicly Available : Non-Sensitive PSI:PSB1 PSI:PSB1 C:PSB1 C:PBC C:PSB1 MBrooks JRollins MShannon VGaddy MShannon

/RA/ /RA/ /RA/ /RA/ /RA/

2/16/2011 2/16/2011 2/16/2011 2/16/2011 2/18/2011 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax