Finding | |
|---|---|
| Title | Inadequate Voltage Calculations for the 125 VDC and 120 VAC Buses |
| Description | The inspectors identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, that states, in part, applicable regulatory requirements and design basis are correctly translated into specifications, drawings, procedures, and instructions. Specifically, prior to June 20, 2013, the 125 VDC calculation did not take into account the maximum inrush currents and actual accident loading, and the 120 VAC calculation did not properly account for low voltage when the buses are supplied from their alternate source. The finding was entered into the licensees corrective action program as Condition Report CR-2013-006273 and CR-2013-006396. The inspectors determined that the failure to perform accurate voltage calculations for the 125 VDC system and 120 VAC bus was a performance deficiency. The performance deficiency is more-than-minor because it was associated with the Reactor Safety, Mitigating Systems Cornerstone, Design Control attribute and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the 125 VDC calculation did not take into account the maximum inrush currents and actual accident loading, and the 120 VAC calculation did not properly account for low voltage when the buses are supplied from their alternate source. Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, Exhibit 2, the inspectors determined the finding was of very low (Green) safety significance because the finding was not a design deficiency and did not result in the loss of operability or functionality. This finding did not have a cross-cutting aspect because the most significant contributor to the performance deficiency did not reflect current licensee performance. |
| Site: | Comanche Peak |
|---|---|
| Report | IR 05000445/2013007 Section 1R21 |
| Date counted | Jun 30, 2013 (2013Q2) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.21 |
| Inspectors (proximate) | T Farnholtz R Smith G Skinner B Correll C Edwards T Buchanan J Braisted |
| Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control |
| INPO aspect | |
| ' | |