05000416/LER-1982-073, Forwards LER 82-073/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-073/03L-0
ML20065P233
Person / Time
Site: Grand Gulf 
Issue date: 10/08/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20065P236 List:
References
AECM-82-469, NUDOCS 8210220458
Download: ML20065P233 (1)


LER-1982-073, Forwards LER 82-073/03L-0
Event date:
Report date:
4161982073R00 - NRC Website

text

- _ _

I' MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi N

P. O. B OX 1640, J AC KS O N. MIS SIS SIP PI 3 9 2 05 October 8, 1982 JAMES P. McGAUGHY, JR.

assistant VICE PRESIDENT Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 Attentiort:

Mr. J. P. O'Reilly, Regional Administrator

$C a

u;

Dear Mr. O'Reilly:

C h

i g

$9 SUBJECT: Grand Gulf Nuclear Station t~ m Unit 1 bm Docket No. 50-416 E5 12 2 License No. NPF-13

$]j File 0260/L-835.0 c=2 Smoke Detector Inadvertant I

Alarm Reference: LER 82-073/03 L-0

~

AECM-82/469 On September 9, 1982 at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />, the Auxiliary Building zone 2-6 smoke detectors alarmed with no fire present. The smoke detectors were deactivated and an hourly fire patrol established pursuant to T.S.3.3.7.9.

Attached is LER 82-073/03 L-0.

Yours truly, JPM: sap

- f(

E!> N Attachment cc:

Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 chgy[CLALCOPh 8210220458 821000 6

PDR ADOCK 05000 ff A.$'

S Member Middle South Utilities System