05000416/LER-1982-059, Forwards Updated LER 82-059/01X-1

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 82-059/01X-1
ML20070V443
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/11/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20070V445 List:
References
AECM-83-0091, AECM-83-91, NUDOCS 8302170346
Download: ML20070V443 (2)


LER-2082-059, Forwards Updated LER 82-059/01X-1
Event date:
Report date:
4162082059R00 - NRC Website

text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _

. j.

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B OX 1640. J AC K S O N, MIS SIS SIP PI 3 9 2 0 5 February 11, 1983 JAMES P. McGAUGHY JR ASSIST ANT VICE PRE 5aDt.NT Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission u Region II l 101 Marietta St., N.W., Suite 3100 2 Atlanta, Georgia 30303  ;

Attention: Mr. J. P. O'Reilly, Regional Administrator +

8

Dear Mr. O'Reilly:

.r

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 .

License No. NPF-13 File 0260/L-835.0 Update to Previous Report -

Incorrect Setpoints for RilR Injection Valve Differential Pressure Switches LER 82-059/01 X-1 AECM-83/0091 This letter submits an update to a previous report submitted on September 22, 1982. The event for which the report was made occurred on September 9, 1982, when it was discovered that the differential pressure switches for the RIIR injection valves were incorrectly set during the performance of routine leakage tests. The pressure switches were found to be set at 58 psig rather than less than or equal to 50 psig as required by Technical Specification 4.4.3.2.3.

All corrective action for this event had been completed at the time of the previous report and reported then. A Surveillance Procedure Review was initiated and discussed in the previous report, however, the results of the review will not be made in connection with this report. A separate report will be submitted upon completion of the review. Attached is LER 82-059/01 X-1, which is a final report.

Yours tr ly, 8302170346 6 PDR /\ DOCK 0 PDR S $ fY l ? P2<$au / ff, JPM: sap Attachment cc: (See Next Page)

, UfHOIAL COPWJ Member Middle South Utilities System g~ h O'

, )- AECM-83/0091 Ml ,Cl2CIPPI POWER O LICHT COMPANY Pags 2 cc: Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l