02-15-2017 | On December 18, 2016, during a forced plant outage reported under Licensee Event Report (LER)-2016-004, a leak was identified on the minimum flow line of the High Pressure Core Spray ( HPCS) system downstream of the Primary Containment Isolation Valve.
HPCS system had been running on minimum flow after being used to maintain Reactor Pressure Vessel water level. The HPCS line leak was identified during a walk down by Operations personnel after the HPCS pump had been secured. Due to the location of the leak downstream of the Primary Containment Isolation Valve, this leak constituted a breach of Primary Containment. Both HPCS and Primary Containment were declared inoperable.
The cause of the leak was determined to be from a gasketed flange in the HPCS minimum flow piping. Corrective actions included replacing the gasket. Further evaluation is ongoing and this report will be supplemented once complete. |
---|
|
---|
Category:Letter
MONTHYEARGO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection 2024-09-24
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves 05000397/LER-2021-002-01, Integrated Leak Rate Test2022-06-0909 June 2022 Integrated Leak Rate Test 05000397/LER-2021-002, Integrated Leak Rate Test2021-11-29029 November 2021 Integrated Leak Rate Test 05000397/LER-2021-001, Breach of Secondary Containment2021-09-23023 September 2021 Breach of Secondary Containment 05000397/LER-2017-0072017-11-30030 November 2017 Valve Closure Results in Momentary Increase in Secondary Containment Pressure, LER 17-007-00 for Columbia Generating Station Regarding Valve Closure Results in Momentary Increase in Secondary Containment Pressure 05000397/LER-2017-0052017-11-0909 November 2017 Valve Closure Results in Momentary Increase in Secondary Containment Pressure, LER 17-005-00 for Columbia Generating Station Regarding Valve Closure Results in Momentary Increase in Secondary Containment Pressure 05000397/LER-2017-0062017-11-0909 November 2017 CONDITION PROHIBITED BY TECHNICAL SPECIFICATIONS DUE TO INCOMPLETE ACTION STATEMENT, LER 17-006-00 for Columbia Generating Station for Condition Prohibited by Technical Specifications Due to Incomplete Action Statement 05000397/LER-2017-0042017-10-18018 October 2017 MANUAL REACTOR SCRAM DUE TO HIGH MAIN CONDENSER BACK PRESSURE, LER 17-004-00 for Columbia Generating Station Regarding Manual Reactor Scram Due to High Main Condenser Back Pressure 05000397/LER-2016-0022017-09-27027 September 2017 1 OF 3, LER 16-002-01 for Columbia Generating Station Regarding Valve Closure Results in Momentary Increase in Secondary Containment Pressure 05000397/LER-2016-0032017-08-29029 August 2017 Failure of Fan to Start Results in Momentary Increase in Secondary Containment Pressure, LER 16-003-01 for Columbia Regarding Failure of Fan to Start Results in Momentary Increase in Secondary Containment Pressure 05000397/LER-2017-0032017-08-24024 August 2017 Momentary loss of Secondary Containment due to Weather, LER 17-003-00 for Columbia Generating Station Regarding Momentary Loss of Secondary Containment due to Weather 05000397/LER-2017-0022017-07-10010 July 2017 Implementation of Enforcement Guidance Memorandum 11-003, Revision 3, LER 17-002-00 for Columbia Generating Station re Implementation of Enforcement Guidance Memorandum 11-003, Revision 3 05000397/LER-2016-0042017-06-0808 June 2017 1 OF 3, LER 16-004-01 for Columbia Generating Station Regarding Automatic Scram Due to Off-site Load Reject 05000397/LER-2017-0012017-03-20020 March 2017 Contactor Coil Failure Results in Tripping of HPCS Diesel Mixed Air Fan, LER 17-001-00 for Columbia Generating Station Regarding Contactor Coil Failure Results in Tripping of HPCS Diesel Mixed Air Fan 05000397/LER-2016-0052017-02-15015 February 2017 Leak in Minimum Flow Line Makes HPCS and Primary Containment Inoperable, LER 16-005-00 for Columbia Generating Station Regarding Leak in Minimum Flow Line Makes HPCS and Primary Containment Inoperable 05000397/LER-2016-0012016-05-24024 May 2016 MANUAL REACTOR SCRAM FOLLOWING LOSS OF REACTOR CLOSED COOLING, LER 16-001-00 for Columbia Regarding Manual Reactor Scram Following Loss of Reactor Closed Cooling 05000397/LER-2015-0072016-01-0707 January 2016 REACTOR BUILDING PRESSURE GREATER THAN TECHNICAL SPECIFICATIONS REQUIREMENT, LER 15-007-00 for Columbia Regarding Reactor Building Pressure Greater Than Technical Specifications Requirement 2024-01-22
[Table view] |
comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Inf000llects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
05000- Columbia Generating Station 397
Plant Conditions
The plant was in a forced shutdown due to a fault on an off-site transmission line [FK] and at the time of discovery the plant was in Mode 3 at approximately 450 degrees F reactor temperature and 851 psig reactor pressure. The High Pressure Core Spray (HPCS) system [BG] was activated after the scram to support maintaining Reactor Vessel [RPV] inventory instead of Reactor Core Isolation Cooling (RCIC) [BN], which was inoperable after the RCIC pump [P] tripped on over-speed due to an Operator misdiagnosing response of RCIC start sequence. There were no other structures, systems or components that malfunctioned or that were out of service that contributed to this event.
Event Description
On December 18, 2016, during a forced plant outage reported under Licensee Event Report (LER)-2016-004, a leak was identified on the minimum flow line of the HPCS system, on the first flange downstream of a Primary Containment [NH] Isolation Valve [ISV]. The valve isolates the minimum flow line to the Suppression Pool [BT] from the HPCS pump. The HPCS system injected into the vessel for approximately 1 minute and HPCS then remained on minimum flow operation until it was manually shut down by Operations personnel. The HPCS pump was used in place of RCIC after the RCIC pump tripped. The HPCS line leak was identified during a walk down by Operations personnel after the HPCS pump had been secured. Subsequent investigation attributed the leak to deterioration of the upstream gasket [SEAL] for a flow restrictor [OR]. The gasket was missing and presumed swept into the Suppression Pool. Due to the location of this leak downstream of the Primary Containment Isolation Valve, this leak constituted a breach of Primary Containment. Both HPCS and Primary Containment were declared inoperable.
The gasket was replaced and HPCS and Primary Containment were returned to operable status.
This event was reported in Event Notification#52443 in accordance with reporting criteria 10 CFR 50.72(b)(3)(v)(D), Accident Mitigation, for the loss of a single train subsystem in the Emergency Core Cooling System (ECCS) [AB], and 10 CFR 50.72(b)(3)(ii)(A), Degraded Condition, because the Primary Containment integrity was compromised.
Cause
The direct cause of the event was the failure of a gasket in the HPCS minimum flow piping. An evaluation is in progress to determine apparent causes. This report will be updated when the evaluation is completed.
Corrective Actions
Immediate corrective action was to replace the failed gasket to restore operability of HPCS and Primary Containment.
Previous Occurrences
Similar occurrences have not been experienced at the Columbia Generating Station in the last ten years.
comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Inf000llects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
05000- Columbia Generating Station 397
Assessment of Safety Consequences
The line leakage did not impact the HPCS system injection function. The HPCS minimum flow line is isolated from the HPCS pump during injection operations to the reactor vessel, hence, this leakage due to the failed gasket would not have impacted the injection function or flow rate. Therefore, this minimum flow line leak was not significant with respect to the ability of the HPCS pump to provide its design rated flow to the reactor vessel in accident conditions.
Estimates of the rate and amount of leakage indicate that the leak would not have prevented HPCS from performing its safety function during the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of operation but it would have impacted the ability of the system to perform its 30- day mission time, had the HPCS system been initiated in response to a design basis event, because of the loss of Suppression Pool inventory via leakage or because of flooding of the HPCS room. Therefore, this event is being reported as a condition that could have prevented fulfillment of a safety function for the single train HPCS system to be able to mitigate the consequences of an accident, in accordance with 10 CFR 50.73(a)(2)(v)(D), and constitutes a mitigating system functional failure.
There were no significant actual safety consequences because at the time of the event there was no release of radioactive material. All leakage from the Primary Containment was captured in plant systems within Secondary Containment [JM]. If the leak rate would have increased considerably, the HPCS room flood level switches would have alarmed the Control Room so that other mitigating actions would have been taken to prevent excessive flooding of the room.
The HPCS flow restrictors for the minimum flow line form part of the pressure boundary for the Primary Containment; therefore, the reported leak in an un-isolable location of the line constitutes a breach in Primary Containment. This is being reported in accordance with 10 CFR 50.73(a)(2)(ii)(A) as a condition that seriously degraded a primary safety barrier.
Energy Industry Identification System Information Energy Industry Identification System information codes from IEEE Standards 805-1984 and 803-1983 are represented in brackets as [X] and [XX] throughout the body of the narrative.