05000397/LER-2005-004, Re Reactor Scram During Plant Startup Due to Reactor Feedwater Pump Trip
| ML052420488 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/22/2005 |
| From: | Oxenford W Energy Northwest |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GO2-05-146 LER 05-004-00 | |
| Download: ML052420488 (6) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(ix)(A) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown |
| 3972005004R00 - NRC Website | |
text
-
ENERGY SJNORTHWEST People -Vision
- Solutions P.O. Box 968
- Richland, WA
- 99352-0968 August 22, 2005 G02-05-146 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk.
Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LICENSEE EVENT REPORT NO. 2005-004-00
Dear Sir or Madam:
Transmitted herewith is Licensee Event Report No. 2005-004-00 for the Columbia Generating Station. This report is submitted pursuant to 10 CFR 50.73(a)(2)(iv)(A), 10 CFR 50.73(a)(2)(v)(D), and 10 CFR 50.73(a)(2)(i)(B). The enclosed report discusses items' of reportability and corrective actions taken.
If you have any questions or require additional information, please contact Mr. GV Cullen at (509) 377-6105.
Respectfully WSOx
- - Vic-e -Prei t 'T&chiii66l7S5rv-[6e's' "
Mail Drop PE04
Enclosure:
Licensee Event Report 2005-004-00 cc: BS Mallett-NRC RIV BJ Benney-NRC NRR INPO Records Center NRC Sr. Resident Inspector - 988C (2)
RN Sherman - BPAI1 399 WA Horin - Winston & StraWn CE Johnson - NRC RIV/fax I
i~~-
4**.
,E
.i
- 1.
..5 z
-;i.
NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0104 EXPIRES: 6-30-2007 (6-2004)
Estimated burden per response to comply with this mandatory collection request:
50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />.
Reported lessons learned are Incorporated Into the licensing process and fed back to Industry. Send comments regarding burden estimate to the Records and FOIAIPutvacy Service Branch (T-5 F52), U.S.
Nuclear Regulatory Commission, Washington DC 20555-0001. or by Internet LICENSEE EVENT REPORT LERe-mal to Infocollects(Mnrc.gov, and to the Desk Officer. Office of Information LI E ET and Regulatory Affairs. NEOB-10202 (3150-0104), Office of Management and Budget. Washington, DC 20503. If a means used to Impose an Information (See reverse for required number of collection does not display a currentiy valid OMB control number. the NRC may (Seerevrse or equied umbe ofnot conduct or sponsor, anid a person Is not required to respond to. the digits/characters for each block)
Information collection.
- 3. PAGE Columbia Generating Station 05000397 1 OF5
- 5. EVENT DATE
- 6. LER NUMBER
- 7. REPORT DATE
- 8. OTHER FACILITIES INVOLVED SEQUENTIAL REV FACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR INUMBER RE.
MONTH DAY YEAR 05000 FACILITY NAME DOCKEr NUMBEIR 06 23 2005 20050-004-00 08 22 2005 05000
- 9. OPERATING MODE_
- - 11..THIS REPORTIS SUBMITTED PURSUANT.TO THEREQUIREMENTS OFIO CFR§: (Checkallthatapply)-.
Dl 20.2201 (b)
[I 20.2203(a)(3)(i) 0 50.73(a)(2)(i)(C)
El 50.73(a)(2)(vii) 1ED 20.2201 (d)
El 20.2203(a)(3)(ii) 0 50.73(a)(2)(ii)(A)
D50.73(a)(2)(viii)(A)
Dl 20.2203 (a)(1)
El 20.2203(a)(4)
El 50.73(a)(2)(ii)(B) a50.73(a)(2)(viii)(B) a: 20.2203(a)(2)(i)
D50.36(c)(1)(i)(A)
El 50.73(a)(2)(iii)
El 50.73(a)(2)(ix)(A) 10.POWERLEVEL 0 20.2203(a)(2)(ii) 0 50.36(c)(1)(ii)(A)
ED 50.73(a)(2)(iv)(A) a 50.73(a)(2)(x) 0l 20.2203(a)(2)(iii) 050.36(c)(2) a: 50.73(a)(2)(v)(A) a73.71([a)(4) 023 0 20.2203(a)(2)(iv) 0 50.46(a)(3)(ii) 0 50.73(a)(2)(v)(B)
E 73.71(a)(5)
D 20.2203(a)(2)(v) 0 50.73(a)(2)(i)(A) 50.73(a)(2)(v)(C)
El OTHER Go20.2203(a)(2)(vi) 13 50.73(a)(2)(i)(B)
Al50.73(a)(2)(v)(D)
[3 Spec4Iyn Abshradbelow Orin N RC Formn 366A
- 12. LICENSEE CONTACT FOR THIS LER FACILITY NAME TELEPHONE NUMBER (Indlude Area Code)
Craig Sly, Principal Engineer - Licensing 1509-377-8616CAUSE SYSTEM COMPONENT FACTUR-ER RETEPXLE
CAUSE
SYSTEM COMPONENT FACTURER RETORTABLE IIITII I
- 14. SUPPLEMENTAL REPORT EXPECTED
- 15. EXPECTED MONTH DAY YEAR o YES (If yes, complete 15. EXPECTED SUBMISSION DATE)
ED NO SUBMISSION
_D A TEI ABSTRACT (Umit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines)
On June 23, 2005, Columbia Generating Station was in Mode 1 with the reactor operating at approximately 23 percent power. At 13:46 PDT, an automatic reactor scram occurred due to a low water level condition in the reactor vessel. The low reactor water level condition was caused by an inadvertent loss of reactor f~edwater pump RFWI-P-B due to a false lowsuction pressure signal caused by human error during planned maintenance activities. Control room operators entered appropriate Emergency Operating Procedures and stabilized the plant following the reactor scram.
Plant systems responded as designed with the exception of RCIC as discussed below. As long term corrective action, a time delay will be installed or the low suction pressure trip removed to prevent spurious RFW pump trips.
The RCIC system was manually started to restore reactor water level and was later manually tripped.
The system had to be reset locally due to tripped mechanical overspeed trip linkage. During two subsequent attempts to restart RCIC the pump tripped on low suction pressure. Operators were then able to successfully start RCIC with the flow controller in manual. A time delay has been added to the RCIC low suction pressure trip logic to resolve this issue.
26158 R3
I (If more space is required, use additional copies of NRC Form 366A)
PLANT CONDITIONS
The plant was operating in Mode 1 at approximately 23 percent power at the time of this event.
EVENT DESCRIPTION
On June 23,2005, Columbia GeneratingStation was in Mode-1with the reactor operating at--
approximately 23 percent power. At 13:46 PDT, an automatic reactor scram occurred due to a low water level condition in the reactor vessel. The low reactor water level condition was caused by an inadvertent loss of reactor feedwater [SJ] pump [P] RFW-P-1B due to a false low suction pressure signal inadvertently generated during planned maintenance activities.
The Control Room Supervisor (CRS) entered Emergency Operating Procedure PPM 5.1.1, RPV Control. Water level continued to decrease during an attempt to bring the standby RFW-P-1A up to speed. The lowest reactor water level attained was -48 inches. A reactor vessel level 2 (reactor water level less than -50 inches) isolation signal was obtained which caused primary containment isolation valves [ISV] to close, including the Main Steam Isolation Valves (MSIVs), and standby gas treatment systems [B1H] to start. However, no level 2 Emergency Core Cooling System (ECCS) actuations occurred due to differences in instrumentation setpoint tolerances and the fact that an actual level 2 was not achieved.
At about 13:50 the reactor core isolation cooling (RCIC) system [BN] was manually started using the initiation push button and utilized to restore reactor water level. At about 14:14 after level had been restored, RCIC was manually tripped. The control room operator was unable to reset the RCIC system from the control room. An operator was dispatched to investigate and found the mechanical over-speed trip linkage was not properly positioned. The operator re-positioned the trip linkage and at about 14:45 the steam inlet valve trip signal was reset.
At about 15:32, a manual start of the RCIC pump was attempted from the control room using the initiation push button. The pump ramped up properly, and then tripped at maximum flow. A second attempt using the initiation push button was made at about 15:39 and the pump again tripped. At about 15:49 a third attempt was made to start RCIC. This time the attempt was made with the flow controller in manual. After starting the pump, flow was increased in a controlled manner and the system ran for an extended period with no subsequent unanticipated trips.
At about 15:50 the NRC was notified of the RPS actuation per 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(3)(iv)(A) (reference event notification 41790). This LER is submitted pursuant to 50.73(a)(2)(iv)(A) as an event or condition that resulted in manual or automatic actuation of the reactor protection system [JC]. In addition, historical time periods where conditions existed similar to those that led to the failure of RCIC to operate properly following the scram are being reported 26158 R3
isU.S. NUCLEAR REGULATORY COMMISSION (1-2001)
LICENSEE EVENT REPORT (LER)
- 1. FACILITY NAME
- 2. DOCKET
- 6. LER NUMBER
- 3. PAGE YEAR SEQUENTIAL REVISION Columbia Generating Station 05000397 NUMBER NUMBER 3 OF 5 2005-004-00 pursuant to 50.73(a)(2)(v)(D) as a condition that could have prevented fulfillment of a safety function, and 50.73(a)(2)(i)(B) as a condition prohibited by Technical Specifications.
IMMEDIATE CORRECTIVE ACTIONS
Following the event, plant personnel performed an investigation into the cause of the scram and determined that it was caused by human error during performance of a maintenance activity.
Immediate actions taken included a stand-down with Mainteance and
_rationssupervision, management readiness reviews of all routine and emergent work, and additional oversight of all control room and selected field activities. The readiness reviews and additional oversight were terminated following plant restart.
Plant personnel also performed an investigation into the cause of the RCIC trips and found that the system was tripping on low suction pressure due to short term pressure drops during pump starts under certain conditions. The relays associated with the RCIC low suction pressure trip were replaced with time delay relays. This will prevent future RCIC trips due to short duration low suction pressure conditions. These changes were made and the system restored to operable status prior to the plant exceeding 150 psig as required by Technical Specifications.
CAUSE OF EVENT
The physical cause of the reactor scram was a loss of feedwater to the reactor vessel. The loss of feedwater was caused by a false low suction pressure signal input to RFW-P-1B. The false low suction pressure signal was generated when an electrician briefly connected a multi-meter, set to measure Ohms, across two termination points, introducing a voltage which resulted in a rapidly reduced feed flow rate. The electrician was removing a bypass of the low suction pressure trip logic using an approved procedure, but did not have a full understanding of the configuration he was restoring, and connected across the wrong termination points. The bypass had been installed to avoid a potential inadvertent trip of the feed pumps duringfeedwater heater restoration following-replacement of three condensate system relief valves that had lifted during plant startup evolutions.
A root cause analysis has been completed regarding this event. The three primary causes are summarized as follows:
- 1. The feedwater system is susceptible to spurious pump trips due to system design. Many BWRs have installed a time delay on the feedwater pump low suction pressure trip and staggered the feedwater pump low suction pressure trip set points or respective time delays. Energy Northwest has not yet installed this modification. Implementation of this modification would have precluded the need to bypass the low suction pressure trips during the replacement of the relief valves.
- 2. Previous corrective actions to address condensate system [SD] relief valve [RV] failures did not 26158 R3
eU.S. NUCLEAR REGULATORY COMMISSION (1-2001)
LICENSEE EVENT REPORT (LER)
- 1. FACILITY NAME
- 2. DOCKET
- 6. LER NUMBER
- 3. PAGE YEAR SEQUENTIAL REVISION Columbia Generating Station 05000397 NUMBER NUMBER 4 OF 5 2005-00.4-00 adequately address prevention of future relief valve failures. Lifting of condensate system relief valves during startup, requiring maintenance activities and tag-out and restoration of the heaters, has been a recurring issue at Columbia.
- 3. Failure to recognize and mitigate risks associated with the low suction pressure trip bypass activities due to inadequate engagement of personnel in ownership of the evolution. This evolution had several human performance aspects that contributed to the event.
The RCIC system unanticipated trips were determined to have been caused by a short duration low suction pressure condition due to system design. This short duration low suction pressure condition occurred after the pump started, just as the pump discharge pressure exceeded reactor vessel pressure and started to deliver flow into the reactor vessel. As the RCIC discharge check valves rapidly open, a short duration negative pressure spike is experienced throughout the system. Normally, the suction pressure of RCIC is maintained at a high enough value, due to RCIC keepfill pump operation, that this negative pressure spike does not actuate the low suction pressure switch. However, shortly after the RCIC pump is shut down following operation, the suction pressure is lower if the keepfill pump has not operated and this short duration negative pressure spike can actuate the low suction pressure trip circuit and cause the pump to trip.
A review of operating history was performed and found that there were several time periods where RCIC had operated and been secured, but the keepfill pump had not operated and pressurized the suction piping. During those time periods it is possible that the pump would have experienced a low suction pressure trip if called upon to perform its function following a Control Rod Drop Accident.
Final cause investigation is not complete for this issue. A supplemental LER will be issued following completion of this investigation if further information of significance warrants a supplement.
FURTHER CORRECTIVE ACTIONS A-corrective action plan has been established to correct the causesassociated-withjthereactor.scram.
- 1. A modification to install a time delay on the feedwater pump low suction pressure trip and stagger the feedwater pump low suction pressure trip set points or respective time delays or to remove the low suction pressure trips will be implemented.
- 2. A separate root cause evaluation will be performed for failures of condensate system relief valves and will identify actions to address these issues.
- 3. A tool has been developed that will help establish and promote behaviors of exemplary activity ownership and includes a process for error reviews that clearly outlines personal responsibilities and expected accountability regarding plant evolutions. Energy Northwest will communicate this tool to station personnel and will train managers and supervisors on the process. A means to allow 26158 R3U.S. NUCLEAR REGULATORY COMMISSION (1-2001)
LICENSEE EVENT REPORT (LER)
- 1. FACILITY NAME
- 2. DOCKET l6.
LER NUMBER
- 3. PAGE YEAR lSEQUENTIAL REVISION Columbia Generating Station 05000397 NUMBER NUMBER 5 OF 2005-004-00 management to be aware of and monitor the routine use of this tool and communicate results will also be created and implemented.
A final cause analysis has been initiated regarding the RCIC unanticipated trips that occurred but has not been completed. Appropriate further corrective actions will be implemented based on the results of this analysis. A supplemental LER will be issued if this cause analysis uncovers information of significance that warrants a supplement.
ASSESSMENT OF SAFETY CONSEQUENCES
This event posed no threat to the health and safety of the public or plant personnel. A loss of feedwater is an anticipated transient and the plant responded as designed with the exception of RCIC as discussed below. The minimum indicated RPV level attained was -48 inches. Operators successfully started RCIC for RPV level control. After securing RCIC, operators were not able to restart RCIC on two attempts when a trip signal occurred. Operators were subsequently able to restart RCIC. All other safety equipment was available during this transient and performed as expected.
There were no structures, components, or systems that were inoperable at the start of the event and contributed to the event. The plant was stabilized in Mode 3 without further complication.
If operators had not been able to restore RCIC operation, the High Pressure Core Spray (HPCS) system was available to provide inventory makeup. In addition, plant conditions were such that operators could have re-opened the MSIVs and restored RFW or Condensate Booster Pump operation.
SIMILAR EVENTS
Energy Northwest previously reported a similar event involving a reactor scram associated with a feedwater transient (LER 2004-06-00). In that event a licensed control room operator improperly filled a feedwater heater [HX] with condensate following maintenance. This improper filling evolution tripped-the only running reactor feedwater-pump initiating-a-loss of feedwater transient'The reactor-was scrammed manually prior to level reaching the automatic trip set point. The event documented in LER 2004-06-00 is similar to the current event in that both occurred during performance of recovery efforts following maintenance on condensate system relief valves that had lifted during plant startup evolutions. However, they are different in the human performance aspects. Corrective actions taken to address the previous event were effective in that the filling of the feedwater heater following maintenance was performed successfully during the evolution discussed in this LER.
26158 R3