Title | Secondary Containment Inoperability due to Improperly Controlled Access to the Reactor Building Roof |
Description | A self-revealing finding of very low safety significance (Green) and associated NCV of SSES Unit 1 and 2 TS 5.4.1, Procedures, was identified because Susquehanna incorrectly implemented procedures for maintaining secondary containment integrity. Specifically, on July 27, 2015, maintenance technicians rendered secondary containment for both units inoperable for approximately 44 minutes when a secondary containment boundary door was opened to access the reactor building roof. Susquehanna entered the issue into the CAP as CR-2015-20857 and CR-2015-24442, restored the boundary, and verified the integrity of secondary containment. The finding was more than minor because it was associated with the Human Performance (Routine OPS/Maintenance Performance) attribute of the Barrier Integrity cornerstone, and affected the cornerstone objective of providing reasonable assurance that physical design barriers (Secondary Containment) protect the public from radionuclide releases caused by accidents or events. Specifically, opening the secondary containment barrier did not maintain reasonable assurance that the secondary containment would be capable of performing its safety function in the event of a reactor accident. The inspectors evaluated the finding in accordance with IMC 0609, Appendix A, "The SDP for Findings At-Power," Exhibit 3, for the Barrier Integrity cornerstone, dated June 19, 2012. The inspectors determined the finding was of very low safety significance (Green) because only represented a degradation of the radiological barrier function of secondary containment provided by the standby gas treatment (SBGT) system. This finding had a cross-cutting aspect in the area of Human Performance, Teamwork because Susquehanna did not effectively communicate and coordinate their activities within and across organizational boundaries to ensure nuclear safety was maintained (H.4). Specifically, when the work plan was changed to accessing the reactor building roof through secondary containment, the change was not effectively communicated to operations department personnel to ensure the secondary containment impairment was appropriately controlled. |
Site: | Susquehanna ![]() |
---|---|
Report | IR 05000387/2015003 Section 4OA3 |
Date counted | Sep 30, 2015 (2015Q3) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | B Smith C Graves E Gray F Bower J Grieves N Graneto T Daun |
Violation of: | Technical Specification - Procedures Technical Specification |
CCA | H.4, Teamwork |
INPO aspect | PA.3 |
' | |