Title | Failure to Perform Face-to-Face Supervisory Assessments Less than 4 Hours Before Individuals Began Performing Work Activities Under a Waiver |
Description | The inspectors identified a noncited violation of 10 CFR 26.207(a)(3), Waivers and Exceptions, associated with the failure of supervisory personnel to appropriately perform face-to-face fatigue assessments. Specifically, supervisory personnel were performing one face-to-face fatigue assessment prior to the first shift worked under a waiver issued for multiple days, and not performing additional assessments for consecutive shifts worked under the same waivers when there was a break of at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> provided between the successive work periods covered by these waivers. The failure to perform face-to-face supervisory assessments less than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> before individuals began performing work activities under a waiver was a performance deficiency. The licensee entered this issue in their corrective action program as Condition Report CR-ANO-C-2010-2396. The failure to perform face-to-face supervisory assessments less than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> before individuals began performing work activities under a waiver was a performance deficiency. The performance deficiency was determined to be more than minor because it was associated with the access authorization attribute of the Security Cornerstone, and affected the associated cornerstone objective to provide assurance that the licensees security system and material control and accounting program use a defense in-depth approach and can protect against (1) the design basis threat of radiological sabotage from external and internal threats and (2) the theft or loss of radiological materials, and is therefore a finding. Using Inspection Manual Chapter 0609, Appendix E, Baseline Security Significance Determination Process for Power Reactors, Figures 5 and 6, the finding was determined to have very low safety significance because the calculated point total did not exceed the threshold value for a Green noncited violation. The cumulative total for this finding was zero points, which was calculated by factoring the one impact area (vital areas) against Tier III Element 08.02.08, Security Force Work Hours, of the Access Authorization attribute, which resulted in a total of zero points within this attribute. The finding was determined to have a crosscutting aspect in the area of human performance associated with decision making H.1(b) in that the licensee failed to use conservative assumptions in decision making and adopt a requirement to demonstrate that the proposed action is safe in order to proceed rather than a requirement to show it is unsafe in order to disapprove the action. Specifically, the licensee had defined the work period to be 6 weeks without giving appropriate thought about potential consequences of this decision relative to potential fatigue aspects while continuing to work under a waiver. |
Site: | Arkansas Nuclear |
---|---|
Report | IR 05000313/2010005 Section 4OA5 |
Date counted | Dec 31, 2010 (2010Q4) |
Type: | NCV: Green |
cornerstone | Miscellaneous |
Identified by: | NRC identified |
Inspection Procedure: | |
Inspectors (proximate) | A Fairbanks A Sanchez D Jones G Guerra J Cherubini J Clark J Larsen J Rotton P Frechette P Prescott R Latta R Schmitt T Burns |
CCA | H.14, Conservative Bias |
INPO aspect | DM.2 |
' | |
Finding - Arkansas Nuclear - IR 05000313/2010005 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Arkansas Nuclear) @ 2010Q4