| Q | CCA | Title |
---|
05000313/FIN-2010004-05 | 2010Q3 | P.3 | Failure to Adequately Implement Foreign Material Exclusion Controls |
05000313/FIN-2010004-07 | 2010Q3 | P.1 | Failure to Provide an Accurate Shipping Manifest |
05000313/FIN-2010004-01 | 2010Q3 | H.12 | Excessive Overlap of Unit 2 Written Examinations |
05000313/FIN-2010006-01 | 2010Q3 | | Fire Protection Compensatory Measures Did Not Cover All Fire Protection Features |
05000313/FIN-2010004-09 | 2010Q3 | H.2 | Failure to Follow Procedure Results in Draining Unit 1 Pressurizer to Reactor Building Floor |
05000313/FIN-2010004-06 | 2010Q3 | | Failure to Correctly Translate VCH-4B Design Requirements into Installed Plant Equipment |
05000313/FIN-2010004-04 | 2010Q3 | H.12 | Failure to Follow Station Work Control Procedure Results in Unavailable Equipment |
05000313/FIN-2010004-03 | 2010Q3 | H.14 | Failure to Promptly Identify and Correct a Condition Adverse to Quality Associated with Emergency Switchgear Chiller VCH-4A |
05000313/FIN-2010004-02 | 2010Q3 | H.14 | Failure to Promptly Identify and Correct a Condition Adverse to Quality Associated with Emergency Diesel Generators Heating, Ventilation, and Air Conditioning Ducting Susceptibility to Tornado Loading |
05000313/FIN-2010004-08 | 2010Q3 | H.8 | Failure to Follow Procedures and Generate Adequate Work Orders for Maintenance on Safety Related Equipment |
05000313/FIN-2010006-02 | 2010Q3 | | Failure to ensure that the pressurizer level would remain within levels predicted for a loss of normal a.c. power |
05000313/FIN-2010005-06 | 2010Q4 | | Failure to Verify the Adequacy of the Unit 2 Refueling Water Tank and the Condensate Storage Tank Transfer Setpoints |
05000313/FIN-2010402-01 | 2010Q4 | H.9 | Security |
05000313/FIN-2010005-05 | 2010Q4 | H.2 | Failure to Use Human Performance Tools Results in Two Turbine Building Roof Fires |
05000313/FIN-2010005-07 | 2010Q4 | H.14 | Failure to Perform Face-to-Face Supervisory Assessments Less than 4 Hours Before Individuals Began Performing Work Activities Under a Waiver |
05000313/FIN-2010005-03 | 2010Q4 | H.13 | Failure to Perform Required Quality Control Inspections |
05000313/FIN-2010005-04 | 2010Q4 | | Failure to Implement the Experience and Qualification Requirements of the Quality Assurance Program |
05000313/FIN-2010005-02 | 2010Q4 | | Failure to Submit for Approval a Decrease in Effectiveness of Emergency Plan |
05000313/FIN-2010005-01 | 2010Q4 | H.14 | Exceeded Technical Specification Allowed Outage Time for Electrical Power Systems Due to Loss of Non-Technical Specification Supported System |
05000313/FIN-2011201-01 | 2011Q1 | H.5 | Security |
05000313/FIN-2011006-01 | 2011Q1 | | Failure to Resolve Adverse Conditions in 120 Volt Vital Inverters in a Timely Manner |
05000313/FIN-2011002-04 | 2011Q1 | H.5 | Failure to Take Timely Corrective Action to Correct a Condition Adverse to Quality Associated with 4160 Volt Vacuum Breakers |
05000313/FIN-2011002-03 | 2011Q1 | | Inadequate Procedural Guidance Results in Damaged Emergency Control Room Ventilation System Air Damper |
05000313/FIN-2011002-02 | 2011Q1 | H.2 | Failure to Follow Procedure Results in Depressurizing One Emergency Core Cooling System Suction Header |
05000313/FIN-2011002-01 | 2011Q1 | H.7 | Failure to Incorporate Adequate Clearance Guidance Prevents Full Operation of the Unit 1 Emergency Control Room Ventilation Makeup Air Supply Damper |
05000313/FIN-2011003-02 | 2011Q2 | | Failure to Provide Adequate Procedural Guidance Results in Control Element Assembly Shaft Extension Damage |
05000313/FIN-2011003-01 | 2011Q2 | H.12 | Failure to Follow Compliance Work Order for Corrective Maintenance on Safety Related Equipment |