| Q | CCA | Title |
---|
05000313/FIN-2010002-01 | 2010Q1 | P.2 | Inadequate Root Cause Evaluation Failed to Prevent Main Feedwater Pump Thrust Bearing Failure |
05000313/FIN-2010003-05 | 2010Q2 | H.2 | Troubleshooting in Switchyard Causes Loss of Power to Unit 1 and Unit 2 Startup Transformers |
05000313/FIN-2010003-07 | 2010Q2 | | Failure to Consider Failure Modes Results in Main Feedwater Pump Over Speed Trip |
05000313/FIN-2010003-06 | 2010Q2 | H.2 | Failure to Follow Nuclear Instrumentation Procedure Results in an Automatic Reactor Trip |
05000313/FIN-2010003-04 | 2010Q2 | | Failure to Correctly Translate Design Requirements into Installed Plant Configuration |
05000313/FIN-2010003-03 | 2010Q2 | | Failure to Recognize Critical Dimension Results in Reactor Coolant Pump Seal Failure |
05000313/FIN-2010003-01 | 2010Q2 | P.3 | Failure to Follow Natural Emergencies Procedure to Control Site Missile Hazards During Severe Weather Warnings and Watches |
05000313/FIN-2010003-02 | 2010Q2 | P.3 | Failure to Adequately Implement Foreign Material Exclusion Controls |
05000313/FIN-2010004-09 | 2010Q3 | H.2 | Failure to Follow Procedure Results in Draining Unit 1 Pressurizer to Reactor Building Floor |
05000313/FIN-2010004-06 | 2010Q3 | | Failure to Correctly Translate VCH-4B Design Requirements into Installed Plant Equipment |
05000313/FIN-2010004-04 | 2010Q3 | H.12 | Failure to Follow Station Work Control Procedure Results in Unavailable Equipment |
05000313/FIN-2010004-03 | 2010Q3 | H.14 | Failure to Promptly Identify and Correct a Condition Adverse to Quality Associated with Emergency Switchgear Chiller VCH-4A |
05000313/FIN-2010004-02 | 2010Q3 | H.14 | Failure to Promptly Identify and Correct a Condition Adverse to Quality Associated with Emergency Diesel Generators Heating, Ventilation, and Air Conditioning Ducting Susceptibility to Tornado Loading |
05000313/FIN-2010006-01 | 2010Q3 | | Fire Protection Compensatory Measures Did Not Cover All Fire Protection Features |
05000313/FIN-2010004-01 | 2010Q3 | H.12 | Excessive Overlap of Unit 2 Written Examinations |
05000313/FIN-2010004-07 | 2010Q3 | P.1 | Failure to Provide an Accurate Shipping Manifest |
05000313/FIN-2010004-05 | 2010Q3 | P.3 | Failure to Adequately Implement Foreign Material Exclusion Controls |
05000313/FIN-2010004-08 | 2010Q3 | H.8 | Failure to Follow Procedures and Generate Adequate Work Orders for Maintenance on Safety Related Equipment |
05000313/FIN-2010006-02 | 2010Q3 | | Failure to ensure that the pressurizer level would remain within levels predicted for a loss of normal a.c. power |
05000313/FIN-2010005-06 | 2010Q4 | | Failure to Verify the Adequacy of the Unit 2 Refueling Water Tank and the Condensate Storage Tank Transfer Setpoints |
05000313/FIN-2010005-04 | 2010Q4 | | Failure to Implement the Experience and Qualification Requirements of the Quality Assurance Program |
05000313/FIN-2010005-03 | 2010Q4 | H.13 | Failure to Perform Required Quality Control Inspections |
05000313/FIN-2010005-02 | 2010Q4 | | Failure to Submit for Approval a Decrease in Effectiveness of Emergency Plan |
05000313/FIN-2010005-07 | 2010Q4 | H.14 | Failure to Perform Face-to-Face Supervisory Assessments Less than 4 Hours Before Individuals Began Performing Work Activities Under a Waiver |
05000313/FIN-2010005-05 | 2010Q4 | H.2 | Failure to Use Human Performance Tools Results in Two Turbine Building Roof Fires |
05000313/FIN-2010402-01 | 2010Q4 | H.9 | Security |
05000313/FIN-2010005-01 | 2010Q4 | H.14 | Exceeded Technical Specification Allowed Outage Time for Electrical Power Systems Due to Loss of Non-Technical Specification Supported System |