05000313/FIN-2010005-06
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Verify the Adequacy of the Unit 2 Refueling Water Tank and the Condensate Storage Tank Transfer Setpoints |
| Description | The inspectors identified a noncited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, which states, in part, that design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified methods of calculation, or by the performance of a suitable testing program. Contrary to the above, the licensee failed to assure that design control measures were provided for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculation methods, or by the performance of a suitable testing program. Specifically, since 1998, the licensee failed to verify the adequacy of the Unit 2 refueling water tank and the condensate storage tank transfer setpoints to prevent potential air entrainment due to vortexing in safety-related pump suction piping. This finding was entered into the licensees corrective action program as Condition Report ANO-C-2007-1469. The inspectors determined that the failure to verify the adequacy of the Unit 2 refueling water tank and the condensate storage tank transfer setpoints was a performance deficiency. The finding was more than minor because it was associated with the design control attribute of the Mitigating Systems Cornerstone and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Using Inspection Manual Chapter 0609.04, Phase 1 Initial Screening and Characterization of Findings, the inspectors determined that the finding was of very low safety significance (Green) because it was a design or qualification deficiency confirmed not to result in loss of operability or functionality. Specifically, the licensee performed subsequent analysis which demonstrated that vortexing in the refueling water and condensate storage tanks would not impact safety-related pump operation during a design basis event. This finding did not have a crosscutting aspect because the most significant contributor did not reflect current licensee performance. |
| Site: | Arkansas Nuclear |
|---|---|
| Report | IR 05000313/2010005 Section 4OA3 |
| Date counted | Dec 31, 2010 (2010Q4) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71153 |
| Inspectors (proximate) | A Fairbanks A Sanchez D Jones G Guerra J Cherubini J Clark J Larsen J Rotton P Frechette P Prescott R Latta R Schmitt T Burns |
| INPO aspect | |
| ' | |
Finding - Arkansas Nuclear - IR 05000313/2010005 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Arkansas Nuclear) @ 2010Q4
Self-Identified List (Arkansas Nuclear)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||