05000311/FIN-2016002-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Withdrawn - Failure to Follow Operability Determination Procedure for Unit 2 Baffle-Former Bolts |
Description | The inspectors identified a Green non-cited violation (NCV) of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," because, from June 15, 2016 until July 26, 2016, PSEG did not accomplish actions necessary to provide adequate confidence that a structure, system, and component (SSC) would perform satisfactorily in service (an activity affecting quality) as prescribed by a documented procedure. Specifically, although PSEG had concluded Salem Unit 2 is susceptible to baffle bolt failure due to its design and operating life (but less susceptible than Salem Unit 1), PSEG inadequately implemented Procedure OP-AA-108-115, "Operability Determinations & Functionality Assessments," Sections 4.7.14 followed by Sections 4.7.18-4.7.20 to perform an operability evaluation (OpEval) to justify continued operation of the unit until the next refueling outage. PSEGs immediate corrective actions included entering the issue into its corrective action program (NOTF 20736630) and documenting an operability evaluation to support the basis for functionality of the baffle structure and the operability of the emergency core cooling system (ECCS) and reactivity control systems. This finding is more than minor because it is associated with the equipment performance attribute of the Mitigating Systems cornerstone and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences, in that degradation of a significant number of baffle bolts could result in baffle plates dislodging following an accident. This issue was dispositioned as more than minor because it was also similar to example 3.j of IMC 0612, Appendix E, Examples of Minor Issues, in that the condition resulted in reasonable doubt of operability of the ECCS and additional analysis was necessary to verify operability. In accordance with IMC 0609.04, Initial Characterization of Findings, and Exhibit 2 of IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power, issued June 19, 2012, the inspectors screened the finding for safety significance and determined it to be of very low safety significance (Green), since the finding did not represent an actual loss of system or function. After inspector questioning, PSEG performed OpEval 2016-015, which provided sufficient bases to conclude the Unit 2 baffle assembly would support ECCS and control rod system operability until the next refueling outage. This finding is related to the cross-cutting aspect of Operating Experience because PSEG did not effectively evaluate relevant internal and external operating experience. Specifically, PSEG did not adequately evaluate the impact of degraded baffle bolts in Unit 2 when directly relevant operating experience was identified at Unit 1. |
Site: | Salem |
---|---|
Report | IR 05000311/2016002 Section 1R15 |
Date counted | Jun 30, 2016 (2016Q2) |
Type: | Other: |
cornerstone | Initiating Events, Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | J Trappa Ziedonisd Orr E Burket F Bower G Dipaolo J Kulp J Poehler M Draxton M Modes P Finney R Nimitz R Vadella T O'Haraa Ziedonisd Orr E Burket F Bower G Dipaolo J Kulp M Draxton M Modes P Finney R Nimitz R Vadella T O'Hara |
INPO aspect | |
' | |
Finding - Salem - IR 05000311/2016002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Salem) @ 2016Q2
Self-Identified List (Salem)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||