05000272/FIN-2015003-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Establish Measures for the Selection and Review for Suitability of a TDAFW Room Cooler Temperature Switch |
Description | A self-revealing, Green NCV of 10 CFR 50, Appendix B, Criterion III, Design Control, was identified when PSEG selected a temperature control switch for the auxiliary feedwater (AFW) pump area room cooler that was not suitable for its application. Specifically, installation of a temperature control switch with an inadequate reset deadband resulted in excessive cycling of the room cooler, failure of its associated turbine-driven AFW (TDAFW) pump enclosure inlet damper to fully open, and subsequent inoperability of the TDAFW pump. PSEG entered this issue into their corrective action program (CAP), performed immediate repairs to the failed damper, performed an apparent cause evaluation (ACE), and created corrective actions to replace the temperature switches on both units. This issue was more than minor because it was associated with the equipment performance attribute of the Mitigating System cornerstone, and adversely affected its objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The finding was evaluated in accordance with IMC 0609, Attachment 4 and Appendix A, Exhibit 2, and screened to Green. Specifically, this finding was a design deficiency whereby the TDAFW pump did not maintain operability; however, this finding did not represent a loss of system or function, and TDAFW did not exceed its Technical Specification (TS) allowed outage time. The inspectors determined that this finding had a cross-cutting aspect in the area of Problem Identification and Resolution, Resolution, because PSEG did not take effective corrective actions to address issues in a timely manner commensurate with their safety significance. Specifically, PSEG did not complete corrective actions in a timely manner to resolve and correct excessive damper cycling, as identified in 2013; did not ensure that work order operation deferrals to address excessive cycling were minimized; and did not address the fundamental cause of excessive damper cycling while an interim corrective action was established to minimize excessive damper cycling. |
Site: | Salem |
---|---|
Report | IR 05000272/2015003 Section 1R12 |
Date counted | Sep 30, 2015 (2015Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.12 |
Inspectors (proximate) | A Siwy A Ziedonis D Lawyer G Dentel O Masnyk-Bailey P Finney R Barkley S Barr S Haney S Horvitz T Fish |
Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control Technical Specification |
CCA | P.3, Resolution |
INPO aspect | PI.3 |
' | |