Finding | |
|---|---|
| Title | Inadequate Work Order Planning Results in Main Generator AVR STV Relay Trip |
| Description | A Green, self-revealing finding (FIN) was identified against MA-AA-716-010, Maintenance Planning Process, Revision 18, when PSEG work orders (WOs) did not specify the appropriate procedure to perform satisfactory modification testing of the main generator automatic voltage regulator (AVR) protective relay (model STV1). Consequently, the relay actuated below its design setpoint on February 4, 2016, resulting in an automatic trip of the Unit 2 main turbine and reactor. PSEG entered the issue in their Corrective Action Program (CAP) and performed a root cause evaluation (RCE), replaced the failed STV1 relay with a properly tested relay, verified other STV relays were appropriately tested as an extent of condition, and initiated an action to revise Laboratory Testing Services (LTS) department relay test procedures to ensure all applicable acceptance criteria will be incorporated. The inspectors determined that a performance deficiency existed because PSEG WOs did not specify the appropriate procedure to perform satisfactory modification testing of the main generator AVR protection relay. This issue was more than minor since it was associated with the procedure quality attribute of the Initiating Events cornerstone and adversely impacted its objective to limit the likelihood of events that upset plant stability (turbine and reactor trip) and challenge critical safety functions. Using IMC 0609, Attachment 4 and Appendix A, Exhibit 1, the inspectors determined that this finding was of very low safety significance, or Green, since mitigating equipment relied up to transition the plant to stable shutdown remained available. The finding had a cross-cutting aspect in the area of Human Performance, Work Management, in that the PSEG did not adequately implement the work process to coordinate with engineering and maintenance departments as needed to appropriately plan the STV1 relay modification test WO. |
| Site: | Salem |
|---|---|
| Report | IR 05000311/2016002 Section 4OA3 |
| Date counted | Jun 30, 2016 (2016Q2) |
| Type: | Finding: Green |
| cornerstone | Initiating Events, Mitigating Systems |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71153 |
| Inspectors (proximate) | A Ziedonis D Orr E Burket F Bower G Dipaolo J Kulp M Draxton M Modes P Finney R Nimitz R Vadella T O'Haraa Ziedonisd Orr E Burket F Bower G Dipaolo J Kulp J Poehler M Draxton M Modes P Finney R Nimitz R Vadella T O'Hara |
| CCA | H.5, Work Management |
| INPO aspect | WP.1 |
| ' | |