Title | Improper PM Deletion Resulted in Plant Shutdown Required by Technical Specifications |
Description | A self-revealing Green NCV of Technical Specification (TS) 6.8.1, Procedures and Programs, as described in Regulatory Guide (RG) 1.33, Revision 2, February 1978, was identified when PSEG did not maintain an appropriate preventive maintenance (PM) schedule for Salem containment fan cooling units (CFCUs). Specifically, PSEG did not incorporate vendor recommendations and industry operating experience (OE) in 2003 when modifying PM schedules to delete motor air gap measurements for CFCUs. The 14 CFCU subsequently failed to start in low speed for scheduled testing on March 8, 2015. PSEG entered this in their corrective action program (CAP) as notification 20681031, replaced the 14 CFCU motor, completed an apparent cause evaluation (ACE), and re-initiated CFCU motor air gap measurement PMs. PSEGs inadequate analysis of PM deletion was a performance deficiency within PSEGs ability to correct and should have been prevented. This issue was more than minor because it was associated with the equipment performance attribute of the Mitigating Systems cornerstone and affects its cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors determined that the finding was of very low safety significance (Green) in accordance with IMC 0609, Attachment 4 and Appendix A, Exhibit 2, because the finding was not a design or qualification deficiency, did not represent a loss of safety system function, did not represent the loss of function for any TS system, train, or component beyond the allowed TS outage time, and it did not represent an actual loss of function of any non-TS trains of equipment designated as high safety significance in accordance with PSEGs maintenance rule (MR) program. The inspectors determined that there was no cross-cutting aspect associated with this finding since it was not representative of current PSEG performance. Specifically, in accordance with IMC 0612, the causal factors associated with this finding occurred outside the nominal three-year period of consideration and were not considered representative of present performance. |
Site: | Salem |
---|---|
Report | IR 05000272/2015004 Section 4OA2 |
Date counted | Dec 31, 2015 (2015Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | A Defrancisco A Siwy A Ziedonis C Lally F Bower J Furia P Finney R Barkley R Nimitz S Chaudhary T O'Hara |
Violation of: | Technical Specification - Procedures Technical Specification |
INPO aspect | |
' | |
Finding - Salem - IR 05000272/2015004 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Salem) @ 2015Q4