05000302/LER-1995-019, Submits Corrective Action Date Affected by Current Forced Outage Re LER 95-019-00,issued 951026

From kanterella
Jump to navigation Jump to search
Submits Corrective Action Date Affected by Current Forced Outage Re LER 95-019-00,issued 951026
ML20134E869
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/23/1997
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0197-12, 3F197-12, NUDOCS 9702070126
Download: ML20134E869 (2)


LER-2095-019, Submits Corrective Action Date Affected by Current Forced Outage Re LER 95-019-00,issued 951026
Event date:
Report date:
3022095019R00 - NRC Website

text

,

Finrida l E92gr l

=.7%1': l l

l l

l January 23, 1997 3F0197-12 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555-0001 )

1

Subject:

Corrective Action Date Affected by Current Forced Outage 1

References:

Licensee Event Report (LER) 95-019-00, issued October 26, 1995 '

Dear Sir:

The above referenced LER described a condition outside the Crystal River Unit 3 (CR-3) design basis in that instrumentation used to identify leaks in Nuclear Service Closed Cycle Cooling Water (SW) system cooling to the Reactor Building Cooling Units (RBCU's) could be offscale high in certain situations and therefore incapable of measuring a specified 90 gpm differential between inlet and outlet flows. The corrective action specified in the referenced LER required completion of an evaluation by January 1,1997 of the calibration spans and the need for applicable cooling water flow transmitters, with subsequent identification of additional corrective actions. This evaluation has been affected by CR-3's current forced outage and will not be completed until May 30, 1997.

As noted in the referenced LER, alternate means of monitoring flow to the RBCU's is available. Therefore, delay in completion of the required evaluation will not have an impact on the operability of the SW system or RBCU's.

4 The required action for this issue is being tracked within CR-3's Nuclear Operation Tracking and Expediting System (NOTES).

t 9702070126 970123 3& D t)

PDR ADOCK 05000302 S PDR CRYSTAL RIVER ENERGY COMPLEX: 1s7so w Pow., une at . crymd her, Fiorid. 3442s e70s e tss23 7ss-sees A Fbnde hepress correony

U.S. Nuclear Regulatory Commission

/ 3F0197-12 Page 2 l l

A copy of this letter will be maintained on file with LER 95-019-00 and made available for future NRC inspections, as necessary. ,

1 Sincerely, 1 i

)

. M/ Beard, Jr. '

Senior Vice President Nuclear Operations PMB/TWC i Attachment 1

xc: Regional Administrator, Region 11 Project Manager, NRR Senior Resident Inspector l

4 l