05000302/LER-1993-002, Forwards LER 93-002,Suppl 2,providing Revised Corrective Actions Completion Date for Work Re New Trenches & Cables

From kanterella
Jump to navigation Jump to search
Forwards LER 93-002,Suppl 2,providing Revised Corrective Actions Completion Date for Work Re New Trenches & Cables
ML20094H390
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/08/1995
From: Hickle B
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094H396 List:
References
3F1195-08, 3F1195-8, NUDOCS 9511140153
Download: ML20094H390 (1)


LER-2093-002, Forwards LER 93-002,Suppl 2,providing Revised Corrective Actions Completion Date for Work Re New Trenches & Cables
Event date:
Report date:
3022093002R00 - NRC Website

text

_ _ _ _ . . . -

l 9 1 Florida Power CORPORATION UUE l 1

November 8 l 3F1195-08 , 1995 l

U. S. Nuclear Regulatory Commission l Attention: Document Control Desk Washington, D.C. 20555

Subject:

Licensee Event Report (LER) 93-002-02

Reference:

A. FPC to NRC letter,'3F0494-02, dated April 4,1994 B. FPC to NRC letter, 3F0493-14, dated April 28, 1993

Dear Sir:

Please find the enclosed Licensee Event Report (LER) 93-002-02. This supplement is submitted by Florida Power Corporation in accordance with 10 CFR 50.73.

This supplement provides a revised corrective action completion date for work related to new trenches and cables. The original LER stated: " Completion of this project will be determined by outage: enabling work performance and is expected to be completed by mid 1995". At the time this commitment was made, a mid-cycle outage was planned for CR-3. Since that time, based on the performance of CR-3, the mid-cycle outage was determined not to be necessary for the reliability of CR-3 and was subsequently cancelled. As a result, completion of this work was not accomplished. The completion date has been revised to be at the conclusion of the Refuel 10 outage, scheduled to be completed on April 15,1995.

Sincerely, i 2-l /)'clia--

B. J. Hickle, Director Nuclear Plant Operations JAF:ff )

Attachment i l

xc: Regional Administrator, Region II l Project Manager, NRR Senior Resident Inspector 1dCO3G CRYSTAL RVER ENERGY COMPLEX: 15760 W Power Line St Crystal River, Floride 3442&6708 e (904) 7954486 9511140153 951108 A Florida Prograss Company fI i '

PDR ADOCK 05000302 I S PDR