Finding | |
---|---|
Title | Failure to Analyze the Pressurizer Safety valves and PORV and Downstream Piping at the correct Pressure |
Description | The team identified a Green non-cited violation (NCV) of 10 CFR Part 50, Appendix B, Criterion III, Design Control , for the licensees failure to perform a pressurizer safety valve and pressurizer Power Operated Relief Valve (PORV) analysis that included input parameters consistent with current plant design bases. The licensee entered the issue into their corrective action program as PIP O-11-11449 and performed additional analyses and evaluations to assure operability of components. The licensees failure to perform a calculation determining the adequacy of the pressurizer safety valves, PORV, and downstream piping at the design basis accident pressure is a performance deficiency (PD). This PD was more than minor because it affected the Mitigating Systems Cornerstone attribute of equipment performance to ensure the availability, reliability, and capability of safety systems that respond to initiating events to prevent undesirable consequences. In addition the finding is similar to IMC 0612 Appendix E, example 3.j because the issue resulted in a condition where there was a reasonable doubt with respect to operability of safety-related components. Specifically, the pressurizer safety valves, pressurizer PORV and downstream piping operate to mitigate the overpressure transient caused by the design basis rod ejection accident. However, these valves and associated piping were analyzed at a lower pressure than the pressure determined in the (Updated) Final safety Analysis Report (UFSAR) Chapter 15 analysis for that accident creating a reasonable doubt that this equipment would operate properly during that design basis accident. Failing to analyze this equipment at the proper pressure resulted in a failure to ensure its availability, reliability and capability to respond to initiating events to prevent undesirable consequences. The finding was of very low safety significance because it was a design deficiency confirmed not to result in the loss of operability or functionality. The team determined that no cross cutting aspect was applicable because this finding was not indicative of current licensee performance. |
Site: | Oconee |
---|---|
Report | IR 05000269/2011010 Section 1R21 |
Date counted | Sep 30, 2011 (2011Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21 |
Inspectors (proximate) | B Desai G Skinner J Hamman L Mellen M Riley M Yeminy P Higgins T Lighty |
INPO aspect | |
' | |
Finding - Oconee - IR 05000269/2011010 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Oconee) @ 2011Q3
Self-Identified List (Oconee)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||