NRC Security Inspection Report 05000269-11-405, 05000270-11-405, and 05000287-11-405
ML110900691
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/29/2011
From: Ernstes M
NRC/RGN-II/DRS/PSB2
To: Baxter D
Duke Energy Carolinas, Duke Power Co
References
IR-11-405
Download: ML110900691 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 29, 2011 Mr. David Site Vice President Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 SUBJECT: OCONEE NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000269/2011405, 05000270/2011405, AND 05000287/2011405

Dear Mr. Baxter:

On March 8, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Oconee Nuclear Station Units 1, 2, and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed on March 9, 2011, with Mr. T. King, and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations, and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The finding is NRC identified. The deficiency was corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. The finding had a cross-cutting aspect in the area of Human Performance. H.4 (b) in that, licensee personnel failed to follow procedures. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the Nuclear Regulatory Commission, Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Oconee Nuclear Station.

In addition, if you disagree with the cross-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, RII, and the NRC Senior Resident Inspector at Oconee Nuclear Station DPC 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Sincerely,

/RA/

Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 05000269, 05000270, 05000287 License Nos.: DPR-38, DPR-47, DPR-55 Enclosure:

Inspection Report 05000269/2011405, 05000270/2011405, and 05000287/2011405 w/Attachment: Supplemental Information (OUO)

cc: (See page 3) DPC 3 cc w/Encl:

David Vice President, Nuclear Engineering Duke Energy Carolinas, LLC 526 S. Church St., EC08H Charlotte, NC 28202 Terry L. Patterson Safety Assurance Manager Duke Energy Carolinas, LLC Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 Terry W. King Site Security Manager Duke Energy Carolinas, LLC Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 Daniel C. Durham Security Support Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672 Timothy J. Wadsworth Security Specialist Duke Energy Carolinas, LLC P. O. Box 1006 526 S. Church St., EC05P Charlotte, NC 28201-1006 David A. Cummings Assistant General Counsel Duke Energy Corporation P.O. Box 1006 526 S. Church St., EC07H Charlotte, NC 28201-1006 Kent Alter Regulatory Compliance Manager Oconee Nuclear Station Duke Energy Carolinas, LLC ON03RC 7800 Rochester Highway Seneca, SC 29672 _ML110900691 OUO REMOVED_ G SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRS RIII: DRP SIGNATURE RA RA RA NAME A.RICHARDSON M.ERNSTES J.BARTLEY DATE 3/29/2011 3/29/2011 3/39/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES