| Q | CCA | Title |
---|
05000269/FIN-2010005-04 | 2010Q4 | | Potential Inoperability of the Unit 3 Standby Shutdown Facility Reactor Coolant Makeup Pump |
05000269/FIN-2010005-01 | 2010Q4 | H.2 | Failure to Adequately Protect Risk Significant And Safety-Related Systems, Structures or Components (SSCs) from Cold Weather Conditions |
05000269/FIN-2010005-02 | 2010Q4 | H.7 | Failure to Prescribe Procedures for Inspecting the East Penetration Room Floor Seals |
05000269/FIN-2010005-03 | 2010Q4 | H.8 | Failure to Install Structural Rebar as Required by Instructions and Drawings |
05000269/FIN-2010009-02 | 2010Q4 | H.7 | Failure to Adequately Monitor Performance of the Standby Shutdown Facility HVAC System as Required by 10 CFR 50.65 |
05000269/FIN-2010009-01 | 2010Q4 | H.8 | Failure to Properly Evaluate Potentially Degraded Conditions for Potential Impact on Operability or Functionality |
05000269/FIN-2011002-01 | 2011Q1 | H.2 | Inadequate Management of the Risk Associated with the Removal of the Unit 2 West Penetration Room Girts |
05000269/FIN-2011002-02 | 2011Q1 | H.8 | Inadequate Post Modification Testing to Ensure SSF DG Functionality |
05000269/FIN-2011405-01 | 2011Q1 | H.8 | Security |
05000269/FIN-2011003-01 | 2011Q2 | H.5 | Inadequate Design Verification of the NPBS-BWST/SSF Trench Foundation |
05000269/FIN-2011003-02 | 2011Q2 | | Follow-up of NOED 11-2-03 |
05000269/FIN-2011016-01 | 2011Q2 | P.3 | Failure to take required compensatory actions for 1 and 2 RIA-40 condenser offgas radiation monitor inoperability |
05000269/FIN-2011010-05 | 2011Q3 | H.1 | Inadequate Procedure for Installation of SSF Submersible Pump |
05000269/FIN-2011017-05 | 2011Q3 | | Heat Addition to the Spent Fuel Pool from the Reactor Coolant Makeup Letdown Line |
05000269/FIN-2011017-02 | 2011Q3 | H.14 | Failure to Maintain SSF Pressurizer Heater Breakers as Safety-Related Components |
05000269/FIN-2011017-03 | 2011Q3 | H.14 | Failure to Perform an Adequate Operability Evaluation for the SSF |
05000269/FIN-2011018-02 | 2011Q3 | H.14 | Failure to Perform an Adequate Operability Evaluation for the SSF |
05000269/FIN-2011018-01 | 2011Q3 | H.8 | Installation of Non-Qualified SSF Pressurizer Heater Breakers Impacting Operability During Certain SSF-Credited Events |
05000269/FIN-2011010-06 | 2011Q3 | | Failure to Account for the Full Range of Emergency Power AC Frequency When Evaluating the Performance of safety Related Components |
05000269/FIN-2011017-01 | 2011Q3 | | Pressurizer Heater Breaker Installation That Would not have Functioned During Certain SSFCredited Events |
05000269/FIN-2011010-04 | 2011Q3 | | Inadequate Control Circuit Voltage Calculations for 4160V breakers |
05000269/FIN-2011010-03 | 2011Q3 | | Failure to Perform Adequate Calculations for MCC Control Circuits |
05000269/FIN-2011010-02 | 2011Q3 | | Inadequate Calculations for Keowee Voltage Relays |
05000269/FIN-2011010-01 | 2011Q3 | | Failure to Analyze the Pressurizer Safety valves and PORV and Downstream Piping at the correct Pressure |
05000269/FIN-2011004-03 | 2011Q3 | H.14 | Failure to correctly process a UFSAR change |
05000269/FIN-2011004-02 | 2011Q3 | | Failure to Verify Adequate Closure Margin |
05000269/FIN-2011004-01 | 2011Q3 | H.14 | Failure to Promptly Identify and Correct an Adverse Condition Affecting Operability of Letdown Line Containment Isolation Valves |
05000269/FIN-2011017-04 | 2011Q3 | P.2 | Failure to Maintain SSF Pressurizer Heater Breakers as Safety-Related Components |