| Q | CCA | Title |
---|
05000269/FIN-2010004-01 | 2010Q3 | P.3 | Failure to Install Fiber Reinforced Polymer on Unit 1 Auxiliary Building Wall as required by Procedure |
05000269/FIN-2010004-03 | 2010Q3 | H.2(a) H.6 | EQ Components Not Installed in the As-Qualified Configuration |
05000269/FIN-2010004-04 | 2010Q3 | H.7 | Unqualified Electrical Penetration Assemblies |
05000269/FIN-2010004-02 | 2010Q3 | | Potential inoperability of condenser off gas radiation monitors |
05000269/FIN-2010009-01 | 2010Q4 | H.8 | Failure to Properly Evaluate Potentially Degraded Conditions for Potential Impact on Operability or Functionality |
05000269/FIN-2010009-02 | 2010Q4 | H.7 | Failure to Adequately Monitor Performance of the Standby Shutdown Facility HVAC System as Required by 10 CFR 50.65 |
05000269/FIN-2010005-01 | 2010Q4 | H.2 | Failure to Adequately Protect Risk Significant And Safety-Related Systems, Structures or Components (SSCs) from Cold Weather Conditions |
05000269/FIN-2010005-02 | 2010Q4 | H.7 | Failure to Prescribe Procedures for Inspecting the East Penetration Room Floor Seals |
05000269/FIN-2010005-03 | 2010Q4 | H.8 | Failure to Install Structural Rebar as Required by Instructions and Drawings |
05000269/FIN-2010005-04 | 2010Q4 | | Potential Inoperability of the Unit 3 Standby Shutdown Facility Reactor Coolant Makeup Pump |
05000269/FIN-2011002-01 | 2011Q1 | H.2 | Inadequate Management of the Risk Associated with the Removal of the Unit 2 West Penetration Room Girts |
05000269/FIN-2011002-02 | 2011Q1 | H.8 | Inadequate Post Modification Testing to Ensure SSF DG Functionality |
05000269/FIN-2011405-01 | 2011Q1 | H.8 | Security |