| Q | CCA | Title |
---|
05000259/FIN-2011011-01 | 2011Q3 | P.1 | Failure to Implement Requirements of the Inservice Testing Program |
05000259/FIN-2011011-04 | 2011Q3 | | Inaccurate Information Provided Regarding Scoping of Motor Operated Valves in the Generic Letter 89-10 Program |
05000259/FIN-2011011-05 | 2011Q3 | | ASME Code Compliance PD |
05000259/FIN-2011004-04 | 2011Q3 | H.7 | Unit 3 Loss of Shutdown Cooling During Primary Containment Isolation System Relay Replacement |
05000259/FIN-2011004-03 | 2011Q3 | P.6 | Unit 1 Loss of Shutdown Cooling Caused by Emergency Diesel Generator Output Breaker Trip |
05000259/FIN-2012010-01 | 2011Q3 | | Incomplete and inaccurate information provided in Generic Letter 89-10 response |
05000259/FIN-2011004-01 | 2011Q3 | H.8 | Failure to Control Transient Combustible Materials in the Unit 1 Reactor Building |
05000259/FIN-2011011-02 | 2011Q3 | H.14 | Failure to Reestablish Motor Operated Valve Design Basis Capability after Performing Modifications to the Valves |
05000259/FIN-2011011-03 | 2011Q3 | H.13 | Inadequate Functional Evaluations Performed to Support Operability of Overthrust Motor Operated Valves |
05000259/FIN-2011005-01 | 2011Q4 | | Failure to Report a Valve Motor Operator Manufacturing Defect Pursuant to 10CFR21.21 in a Timely Manner |
05000259/FIN-2011005-03 | 2011Q4 | H.2(a) H.6 | Failure to Control Temporary Equipment Resulted in a Fire |
05000259/FIN-2011005-02 | 2011Q4 | H.2(a) H.6 | Unit 1 TS 3.0.3 Entry Caused by the Failure of RPS M-G Set 1B |
05000259/FIN-2011012-01 | 2011Q4 | H.7 | Degraded Electrolytic Capacitor Test Results Not Entered into Corrective Action Program |
05000259/FIN-2012002-01 | 2012Q1 | H.8 | Failure to Adequately Implement Impaired Fire Barrier and Detector Controls |
05000259/FIN-2012002-02 | 2012Q1 | H.8 | Failure to Immediately Report a Plant Fire |
05000259/FIN-2012002-03 | 2012Q1 | P.1 | Failure to Ensure ECCS Design Calculation Does Not Exceed Maximum Clad Temperature |
05000259/FIN-2012007-01 | 2012Q1 | H.2 | Failure to Follow NRC Commitment Management Procedure |
05000259/FIN-2012007-02 | 2012Q1 | P.2 | Failure to Establish Adequate Compensatory Measures for Non- Conforming Fire Barriers |
05000259/FIN-2012007-03 | 2012Q1 | H.5 | Failure to Implement Appropriate Safe Shutdown Instructions |
05000259/FIN-2012007-04 | 2012Q1 | P.2 | Failure to Identify and Correct Deficiencies Associated with Safe Shutdown Instructions |
05000259/FIN-2012002-04 | 2012Q1 | | Repeated Failure to Report ECCS Analyses Methodology Change or Errors |
05000259/FIN-2012003-01 | 2012Q2 | H.2 | Failure to Maintain Flood Barrier Results in Inoperable Safety Related Pumps |
05000259/FIN-2012003-02 | 2012Q2 | H.7 | Failure to Properly Prepare a DOT Type A Package for Transport |
05000259/FIN-2012003-03 | 2012Q2 | H.7 | Failure to Implement DOT Type A Package Closure Requirements |
05000259/FIN-2012003-04 | 2012Q2 | P.1 P.1(a) | Failure to Establish Preventive Maintenance for Unit 2 and 3 Main Control Room Annunciator Power Supplies |
05000259/FIN-2012403-01 | 2012Q2 | H.7 | Security |