Title | Inadequate Monitoring of Maintenance Rule In-Scope Service Water Pump and Circulating Water Pump Bay Structures |
Description | The inspectors identified a Green NCV of 10 CFR 50.65, Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, because Entergy personnel did not monitor the performance or condition of structures, systems, or components, against licensee-established goals, in a manner sufficient to provide reasonable assurance that these structures, systems, and components, as defined in paragraph (b) of 10 CFR 50.65, are capable of fulfilling their intended functions. Specifically, between August 25, 2004 and May 19, 2011, Entergy personnel did not monitor the condition of the service water pump (SWP) and circulating water pump (CWP) bays in a manner sufficient to provide reasonable assurance that the SWP and CWP bays remained capable of fulfilling their intended function. This issued was entered into Entergy\'s CAP as CR-IP22011- 2006. This finding is more than minor because if left uncorrected, the condition could have resulted in the loss of function due to degrading concrete material properties of structures and systems designed to mitigate design basis events. This finding is associated with the Mitigating Systems cornerstone. Entergy personnel evaluated the condition of the SWP and CWP bays and determined these structures continued to meet the licensing basis requirements, with reduced margin, and thus remained operable for design loads inclusive of site extreme environmental conditions. Using IMC 0609.04, Phase 1 - Initial Screening and Characterization of Findings, the inspectors determined this finding was of very low safety significance (Green) because the finding was not a design or qualification deficiency, did not result in an actual loss of safety function, was not a loss of barrier function, and was not potentially risk significant for external events. The finding has a cross-cutting aspect in the area of human performance associated with the work practices attribute because Entergy personnel did not define and effectively communicate expectations regarding procedural compliance and personnel follow procedures when Entergy staff documented a preventive maintenance (PM) task as complete when the work had not been performed. |
Site: | Indian Point ![]() |
---|---|
Report | IR 05000247/2011003 Section 4OA7 |
Date counted | Jun 30, 2011 (2011Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | |
Inspectors (proximate) | S Barr S Mccarver J Lilliendahl K Mangan M Catts M Gray O Ayegbusi |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |