RS-19-098, Submittal of Revision 15 to Updated Final Safety Analysis Report, and Revision 24 to Fire Protection Report | Quad Cities | 21 October 2019 | | Submittal of Revision 15 to Updated Final Safety Analysis Report, and Revision 24 to Fire Protection Report |
RS-19-078, License Amendment Request to Revise Technical Specifications 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies. | Byron Braidwood | 24 September 2019 | | License Amendment Request to Revise Technical Specifications 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies. |
RS-19-076, Supplement to License Amendment Request to Increase Technical Specifications Allowable MSIV Leakage Rates | Quad Cities | 22 July 2019 | | Supplement to License Amendment Request to Increase Technical Specifications Allowable MSIV Leakage Rates |
RS-19-054, Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control | Dresden Clinton | 18 June 2019 | | Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control |
RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Calvert Cliffs Dresden Peach Bottom Nine Mile Point Palisades Byron Braidwood Limerick Ginna Clinton Quad Cities FitzPatrick LaSalle | 25 June 2019 | | Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program |
RS-19-023, Application to Increase Technical Specifications Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance Requirement 3.6.4.1.1 | Quad Cities | 5 March 2019 | | Application to Increase Technical Specifications Allowable MSIV Leakage Rates and Revise Secondary Containment Surveillance Requirement 3.6.4.1.1 |
RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control | Dresden Peach Bottom Nine Mile Point Byron Braidwood Limerick Ginna Quad Cities FitzPatrick LaSalle | 14 June 2019 | | Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control |
RS-18-131, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | LaSalle | 14 December 2018 | | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
RS-18-113, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident... | Peach Bottom | 28 September 2018 | | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident... |
RS-18-106, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | Limerick | 14 November 2018 | | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
RS-18-103, Response to Request for Additional Information Concerning License Amendment Request to Revise Alternate Source Term Dose Calculation | Clinton | 29 August 2018 | | Response to Request for Additional Information Concerning License Amendment Request to Revise Alternate Source Term Dose Calculation |
RS-18-098, Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ... | Peach Bottom | 28 August 2018 | | Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ... |
RS-18-089, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) | Quad Cities | 14 August 2018 | | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) |
RS-18-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Quad Cities | 14 August 2018 | | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-18-060, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... | Peach Bottom | 29 June 2018 | | Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... |
RS-18-059, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident | Limerick | 29 June 2018 | | Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident |
RS-18-058, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under ... | LaSalle | 22 June 2018 | | Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under ... |
RS-18-052, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | Limerick | 7 June 2018 | | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
RS-18-051, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | Limerick | 7 June 2018 | | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
RS-18-036, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | LaSalle | 9 May 2018 | | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
RS-18-030, Relief Requests Associated with the Fourth Inservice Inspection Interval | Braidwood | 19 March 2018 | | Relief Requests Associated with the Fourth Inservice Inspection Interval |
RS-18-028, License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator | LaSalle | 19 April 2018 | | License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator |
RS-18-022, Response to NRC Request for Additional Information for Request for License Amendment to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. | Dresden | 14 February 2018 | | Response to NRC Request for Additional Information for Request for License Amendment to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. |
RS-18-006, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | Quad Cities | 26 February 2018 | | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. |
RS-18-005, License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation | Clinton | 9 January 2018 | | License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation |
RS-18-003, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | Dresden | 12 January 2018 | | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
RS-18-001, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | Peach Bottom | 5 January 2018 | | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
RS-17-170, Company Emergency Plan Annex and Addendum Revisions | Dresden Byron Braidwood Clinton Quad Cities LaSalle | 19 December 2017 | | Company Emergency Plan Annex and Addendum Revisions |
RS-17-164, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | Clinton | 20 December 2017 | | Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. |
RS-17-162, Radiological Emergency Plan Addendum Revision | LaSalle | 15 November 2017 | | Radiological Emergency Plan Addendum Revision |
RS-17-157, Supplemental Information Regarding the Third Interval Containment Inservice Inspection (Cisi) Schedule for LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals | LaSalle | 8 November 2017 | | Supplemental Information Regarding the Third Interval Containment Inservice Inspection (Cisi) Schedule for LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals |
RS-17-155, Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... | Peach Bottom | 15 December 2017 | | Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... |
RS-17-153, Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... | Limerick | 15 December 2017 | | Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... |
RS-17-152, Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... | LaSalle | 15 December 2017 | | Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... |
RS-17-145, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | Clinton | 15 November 2017 | | Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control |
RS-17-133, Additional Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals | LaSalle | 3 October 2017 | | Additional Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals |
RS-17-131, Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals | LaSalle | 27 September 2017 | | Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals |
RS-17-130, Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Quad Cities | 28 September 2017 | | Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
RS-17-127, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | LaSalle | 13 December 2017 | | Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. |
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Technical Requirements Manual | Quad Cities | 19 October 2017 | | Quad Cities Nuclear Power Station, Units 1 & 2, Technical Requirements Manual |
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Quad Cities | 19 October 2017 | | Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | Quad Cities | 19 October 2017 | | Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 8, Electric Power |
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | Quad Cities | 19 October 2017 | | Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Quad Cities | 19 October 2017 | | Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 15, Accident and Transient Analysis | Quad Cities | 19 October 2017 | | Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 15, Accident and Transient Analysis |
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | Quad Cities | 19 October 2017 | | Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection |
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | Quad Cities | 19 October 2017 | | Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
RS-17-125, Relief Request RV-2 Associated with the Fourth Inservice Testing Interval | Byron | 25 September 2017 | | Relief Request RV-2 Associated with the Fourth Inservice Testing Interval |
RS-17-111, Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Quad Cities | 27 July 2017 | | Additional Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
RS-17-101, Response to Request for Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis | LaSalle | 28 July 2017 | | Response to Request for Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis |
RS-17-099, Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch) | LaSalle | 8 August 2017 | | Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch) |
RS-17-098, Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch) | LaSalle | 17 July 2017 | | Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch) |
RS-17-096, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) | Peach Bottom | 28 August 2017 | | Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) |
RS-17-086, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | Dresden | 13 July 2017 | | Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. |
RS-17-082, Redacted Dresden Nuclear Power Station, Units 2 & 3, Amendment 21 to Fire Protection Report, Updated Fire Hazards Analysis, Vol. 1 | Dresden | 21 June 2017 | | Redacted Dresden Nuclear Power Station, Units 2 & 3, Amendment 21 to Fire Protection Report, Updated Fire Hazards Analysis, Vol. 1 |
RS-17-082, Dresden, Units 1, 2 and 3 - Updated Final Safety Analysis Report (Ufsar), Revision 12 and Fire Protection Report (Fpr), Amendment 21 | Dresden | 21 June 2017 | | Dresden, Units 1, 2 and 3 - Updated Final Safety Analysis Report (Ufsar), Revision 12 and Fire Protection Report (Fpr), Amendment 21 |
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program | Dresden | 21 June 2017 | | Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program |
RS-17-082, Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Dresden | 21 June 2017 | | Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
RS-17-079, Response to Request for Additional Information Regarding the Permanent Extension of Leak Rate Testing | Clinton | 1 June 2017 | | Response to Request for Additional Information Regarding the Permanent Extension of Leak Rate Testing |
RS-17-072, Fourth 10-Year Interval Inservice Inspection Program Relief Requests | LaSalle | 30 May 2017 | | Fourth 10-Year Interval Inservice Inspection Program Relief Requests |
RS-17-069, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. | Quad Cities | 27 June 2017 | | Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. |
RS-17-068, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe. | Peach Bottom | 30 June 2017 | | Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe. |
RS-17-067, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under. | Nine Mile Point | 30 June 2017 | | Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under. |
RS-17-066, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. | Limerick | 30 June 2017 | | Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. |
RS-17-065, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation .. | LaSalle | 29 June 2017 | | Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation .. |
RS-17-063, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. | Dresden | 27 June 2017 | | Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. |
RS-17-060, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Dresden | 3 May 2017 | | Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
RS-17-051, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Quad Cities | 27 April 2017 | | Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | Calvert Cliffs Dresden Peach Bottom Nine Mile Point Byron Three Mile Island Braidwood Limerick Ginna Clinton Quad Cities LaSalle | 28 March 2017 | | Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process |
RS-17-029, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | Dresden | 10 February 2017 | | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. |
RS-17-024, Supplement to License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System Modifications and Installation of Primary Containment Isolation Valves | LaSalle | 16 February 2017 | | Supplement to License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System Modifications and Installation of Primary Containment Isolation Valves |
RS-17-021, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events | Peach Bottom | 28 February 2017 | | Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events |
RS-17-020, Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Clinton | 2 March 2017 | | Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
RS-17-017, License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal Operations | Clinton | 4 May 2017 | | License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal Operations |
RS-17-008, Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident. | Quad Cities | 26 January 2017 | | Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident. |
RS-17-006, Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses W | Quad Cities | 12 January 2017 | | Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses Wi |
RS-16-257, Withdrawal of Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Quad Cities | 22 December 2016 | | Withdrawal of Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
RS-16-254, Supplemental Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Quad Cities | 15 December 2016 | | Supplemental Information Regarding Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
RS-16-251, Request to Resume Review of Licensing Actions | Clinton | 15 December 2016 | | Request to Resume Review of Licensing Actions |
RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program | Byron Braidwood | 15 December 2016 | | Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program |
RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Appendix a - Application of NRC Regulatory Guides | Byron Braidwood | 15 December 2016 | | Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Appendix a - Application of NRC Regulatory Guides |
RS-16-248, Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual | Byron Braidwood | 15 December 2016 | | Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual |
RS-16-245, Radiological Emergency Plan Revisions | Dresden Nine Mile Point Quad Cities 07201036 | 9 December 2016 | | Radiological Emergency Plan Revisions |
RS-16-244, Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings | Dresden Quad Cities LaSalle | 12 December 2016 | | Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings |
RS-16-236, Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable Operation Under Severe. | Nine Mile Point | 14 December 2016 | | Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable Operation Under Severe. |
RS-16-234, Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... | Limerick | 15 December 2016 | | Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... |
RS-16-233, Fifth Six-Month Status Report for Phases 1&2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under. | LaSalle | 14 December 2016 | | Fifth Six-Month Status Report for Phases 1&2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under. |
RS-16-228, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition | Clinton | 17 November 2016 | | License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition |
RS-16-228, Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition | Clinton | 17 November 2016 | | Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition |
RS-16-210, Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses w | Quad Cities | 16 November 2016 | | Request for Extension to Comply with NRC Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions and NRC Order EA-12-049, Order Modifying Licenses wi |
RS-16-208, Response to NRC Acknowledgement of Suspension Request for Licensing Actions | Clinton | 1 November 2016 | | Response to NRC Acknowledgement of Suspension Request for Licensing Actions |
RS-16-205, Relief Requests Associated with the Fourth Interval Inservice Testing Program | LaSalle | 17 October 2016 | | Relief Requests Associated with the Fourth Interval Inservice Testing Program |
RS-16-196, Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix D - Requirements Resulting from TIM-2 Accident | Clinton | 31 October 2016 | | Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix D - Requirements Resulting from TIM-2 Accident |
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 9 - Auxiliary Systems | Clinton | 31 October 2016 | | Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 9 - Auxiliary Systems |
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 5 - Reactor Coolant System and Connected Systems | Clinton | 31 October 2016 | | Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 5 - Reactor Coolant System and Connected Systems |
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 14 - Initial Test Program | Clinton | 31 October 2016 | | Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 14 - Initial Test Program |
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix a - Glossary | Clinton | 31 October 2016 | | Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix a - Glossary |
RS-16-191, License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | LaSalle | 26 October 2016 | | License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
RS-16-187, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Quad Cities | 19 September 2016 | | Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
RS-16-182, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal | LaSalle | 28 October 2016 | | Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal |
RS-16-176, County, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ic | LaSalle | 1 December 2016 | | County, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ich |
RS-16-161, Request for NRC to Suspend Review of License Amendment Requests | Clinton | 11 August 2016 | | Request for NRC to Suspend Review of License Amendment Requests |
RS-16-149, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) | Peach Bottom | 26 August 2016 | | Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) |
RS-16-111, Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/13 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | Nine Mile Point | 30 June 2016 | | Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/13 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
RS-16-110, Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | Quad Cities | 30 June 2016 | | Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
RS-16-109, Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 6/6/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | Peach Bottom | 30 June 2016 | | Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 6/6/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
RS-16-108, Fourth Six Month Status Report for Phases 1 & 2 Integrated Plan in Response to 06/06/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-1 | Limerick | 30 June 2016 | | Fourth Six Month Status Report for Phases 1 & 2 Integrated Plan in Response to 06/06/2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-10 |
RS-16-107, County, Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/13 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Condi | LaSalle | 30 June 2016 | | County, Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/13 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Condit |
RS-16-106, Fourth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. | Dresden | 30 June 2016 | | Fourth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. |
RS-16-090, Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Dresden | 16 August 2016 | | Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-16-089, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Nine Mile Point | 1 July 2016 | | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-16-080, LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, List of Effective Pages | LaSalle | 11 April 2016 | | LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, List of Effective Pages |
RS-16-080, LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, Chapter 1.0 - Introduction and General Description of Plant | LaSalle | 11 April 2016 | | LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, Chapter 1.0 - Introduction and General Description of Plant |
RS-16-080, LaSalle County, Units 1 and 2 - Transmittal of Updated Final Safety Analysis Report (Ufsar), Revision 22 and Fire Protection Report (Fpr), Revision 7 | LaSalle | 11 April 2016 | | LaSalle County, Units 1 and 2 - Transmittal of Updated Final Safety Analysis Report (Ufsar), Revision 22 and Fire Protection Report (Fpr), Revision 7 |
RS-16-075, Supplemental Information Regarding License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test. | Clinton | 31 March 2016 | | Supplemental Information Regarding License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test. |
RS-16-068, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application | LaSalle | 4 April 2016 | | Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application |
RS-16-064, EP-AA-1004, Addendum 3, Revision 2, Emergency Action Levels for Dresden Station | Dresden | 23 March 2016 | | EP-AA-1004, Addendum 3, Revision 2, Emergency Action Levels for Dresden Station |
RS-16-059, EP-AA-1006, Addendum 3, Revision 2, Emergency Action Levels for Quad Cities Station. | Quad Cities | 28 March 2016 | | EP-AA-1006, Addendum 3, Revision 2, Emergency Action Levels for Quad Cities Station. |
RS-16-058, EP-AA-1003, Addendum 3, Revision 1, Emergency Action Levels for Clinton Station. | Clinton | 28 March 2016 | | EP-AA-1003, Addendum 3, Revision 1, Emergency Action Levels for Clinton Station. |
RS-16-047, EP-AA-1005, Addendum 3, Revision 1, Emergency Action Levels for LaSalle Station | LaSalle | 11 February 2016 | | EP-AA-1005, Addendum 3, Revision 1, Emergency Action Levels for LaSalle Station |
RS-16-035, County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings | Dresden Quad Cities LaSalle | 3 February 2016 | | County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings |
RS-16-029, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Nine Mile Point | 26 February 2016 | | Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-16-026, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Peach Bottom | 26 February 2016 | | Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-16-019, License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation | Clinton | 29 January 2016 | | License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation |
RS-16-015, License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Clinton | 25 January 2016 | | License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
RS-15-320, Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-049 | Clinton | 14 December 2015 | | Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-049 |
RS-15-305, Corrections to the License Renewal Application Dated December 9, 2014 | LaSalle | 2 December 2015 | | Corrections to the License Renewal Application Dated December 9, 2014 |
RS-15-304, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions. | Quad Cities | 16 December 2015 | | Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions. |
RS-15-303, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. | Peach Bottom | 15 December 2015 | | Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. |
RS-15-302, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.. | Nine Mile Point | 15 December 2015 | | Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.. |
RS-15-301, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. | Limerick | 15 December 2015 | | Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. |
RS-15-300, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.. | LaSalle | 16 December 2015 | | Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.. |
RS-15-299, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. | Dresden | 16 December 2015 | | Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. |
RS-15-253, Withdrawal of Relief Request RV-1 and Revision to Relief Request RG-1 Associated with the Fourth Inservice Testing Interval | Byron | 21 September 2015 | | Withdrawal of Relief Request RV-1 and Revision to Relief Request RG-1 Associated with the Fourth Inservice Testing Interval |
RS-15-246, Exigent License Amendment Request for One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time | Clinton | 10 September 2015 | | Exigent License Amendment Request for One-Time Extension of the Shutdown Service Water Division 2 Subsystem Completion Time |
RS-15-239, Response to NRC Requests for Additional Information, Set 8, Dated August 28, 2015 Related to the License Renewal Application | LaSalle | 28 September 2015 | | Response to NRC Requests for Additional Information, Set 8, Dated August 28, 2015 Related to the License Renewal Application |
RS-15-223, Response to NRC Requests for Additional Information, Set 7, Dated July 27, 2015; and a Correction to Information Associated with the Set 2 Response to RAI 8.2.1.20-2, Related to the Renewal Application | LaSalle | 26 August 2015 | | Response to NRC Requests for Additional Information, Set 7, Dated July 27, 2015; and a Correction to Information Associated with the Set 2 Response to RAI 8.2.1.20-2, Related to the Renewal Application |
RS-15-219, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Nine Mile Point | 28 August 2015 | | Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-15-215, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order. | Quad Cities | 28 August 2015 | | Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order. |
RS-15-214, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Peach Bottom | 28 August 2015 | | Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-15-212, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. | Limerick | 28 August 2015 | | Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. |
RS-15-193, Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application | LaSalle | 6 August 2015 | | Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application |
RS-15-185, County - Supplemental Information Regarding Seismic Hazard Risk Evaluation and Seismic Hazard Prioritization Results - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near. | Dresden LaSalle | 22 July 2015 | | County - Supplemental Information Regarding Seismic Hazard Risk Evaluation and Seismic Hazard Prioritization Results - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near. |
RS-15-183, Request for Second Schedule Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | Limerick | 9 July 2015 | | Request for Second Schedule Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
RS-15-180, Response to NRC Requests for Additional Information, Set 4, Dated June 19, 2015 Related to the License Renewal Application | LaSalle | 15 July 2015 | | Response to NRC Requests for Additional Information, Set 4, Dated June 19, 2015 Related to the License Renewal Application |
RS-15-170, Submittal of Relief Requests Associated with the Fourth Inservice Testing Interval | Byron | 22 June 2015 | | Submittal of Relief Requests Associated with the Fourth Inservice Testing Interval |
RS-15-153, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. | Nine Mile Point | 30 June 2015 | | Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. |
RS-15-152, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. | Quad Cities | 30 June 2015 | | Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. |
RS-15-151, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. | Peach Bottom | 30 June 2015 | | Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. |
RS-15-150, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident. | Limerick | 30 June 2015 | | Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident. |
RS-15-149, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. | LaSalle | 30 June 2015 | | Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. |
RS-15-148, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.. | Dresden | 30 June 2015 | | Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.. |
RS-15-138, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Clinton | 15 July 2015 | | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-15-117, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Nine Mile Point | 8 June 2015 | | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-15-114, Response to March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.. | Peach Bottom | 8 May 2015 | | Response to March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.. |
RS-15-101, Request for Schedule Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. | Limerick | 2 April 2015 | | Request for Schedule Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. |
RS-15-088, Request for Schedule Relaxation from NRC Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Bases External Events | Quad Cities | 4 March 2015 | | Request for Schedule Relaxation from NRC Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Bases External Events |
RS-15-086, Partial Withdrawal of Request for Exemption from 10 CFR 50, Appendix a, GDC-56 - Penetration Z-48 (Drywell) | Nine Mile Point | 30 March 2015 | | Partial Withdrawal of Request for Exemption from 10 CFR 50, Appendix a, GDC-56 - Penetration Z-48 (Drywell) |
RS-15-071, Response to NRC Request for Additional Information, Set 45, Dated January 22, 2015, Related to License Renewal Application | Byron Braidwood | 23 February 2015 | | Response to NRC Request for Additional Information, Set 45, Dated January 22, 2015, Related to License Renewal Application |
RS-15-057, February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Nine Mile Point | 19 February 2015 | | February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-15-038, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Limerick | 31 March 2015 | | Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
RS-15-024, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Quad Cities | 27 February 2015 | | Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-15-018, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Clinton | 27 February 2015 | | Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-14-348, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application | Byron Braidwood | 15 December 2014 | | Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application |
RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Revision 15, Chapter 6 - Engineered Safety Features | Byron Braidwood | 15 December 2014 | | Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Revision 15, Chapter 6 - Engineered Safety Features |
RS-14-338, Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 14 - Initial Test Program | Byron Braidwood | 15 December 2014 | | Byron, Units 1 and 2, and Braidwood, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 15, Updated Fire Protection Report (Fpr), Amendment 26, Chapter 14 - Initial Test Program |
RS-14-322, License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of. | Dresden Quad Cities LaSalle | 22 December 2014 | | License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of. |
RS-14-298, Expedited Seismic Evaluation Process Report Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | LaSalle | 19 December 2014 | | Expedited Seismic Evaluation Process Report Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
RS-14-235, Response to NRC Request for Additional Information, Set 38, Dated 08/04/2014; LRA Changes from NRR Staff Feedback on 07/30/2014 Telecon; and, LRA Changes from NRC Region Ill IP-71002 Inspection, to Byron, Units 1 & 2, Braidwood, Units 1 & | Byron Braidwood | 29 August 2014 | | Response to NRC Request for Additional Information, Set 38, Dated 08/04/2014; LRA Changes from NRR Staff Feedback on 07/30/2014 Telecon; and, LRA Changes from NRC Region Ill IP-71002 Inspection, to Byron, Units 1 & 2, Braidwood, Units 1 & 2 |
RS-14-218, Responses to NRC Requests for Additional Information, Sets 33 and 34, Both Dated June 23, 2014; and Corrections and Clarifications Related to the License Renewal Application | Byron Braidwood | 18 July 2014 | | Responses to NRC Requests for Additional Information, Sets 33 and 34, Both Dated June 23, 2014; and Corrections and Clarifications Related to the License Renewal Application |
RS-14-192, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process | Dresden Byron Braidwood Clinton Quad Cities LaSalle | 14 July 2014 | | Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process |
RS-14-162, Corrections to the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application | Byron Braidwood | 23 May 2014 | | Corrections to the Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, License Renewal Application |
RS-14-128, Updated Final Safety Analysis Report, Revision 20, Technical Specifications Bases | LaSalle | 11 April 2014 | | Updated Final Safety Analysis Report, Revision 20, Technical Specifications Bases |
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Table of Contents and List of Effective Pages | LaSalle | 11 April 2014 | | LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Table of Contents and List of Effective Pages |
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 9.0, Auxiliary Systems | LaSalle | 11 April 2014 | | LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 9.0, Auxiliary Systems |
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 8.0, Electric Power | LaSalle | 11 April 2014 | | LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 8.0, Electric Power |
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 6.0, Engineered Safety Features | LaSalle | 11 April 2014 | | LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 6.0, Engineered Safety Features |
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 5.0, Reactor Coolant System and Connected Systems | LaSalle | 11 April 2014 | | LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 5.0, Reactor Coolant System and Connected Systems |
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 15.0, Accident Analyses | LaSalle | 11 April 2014 | | LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 15.0, Accident Analyses |
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 1.0, Introduction and General Description of Plant | LaSalle | 11 April 2014 | | LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 1.0, Introduction and General Description of Plant |
RS-14-127, Response to Request for Additional Information Related to License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure | LaSalle | 12 June 2014 | | Response to Request for Additional Information Related to License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure |
RS-14-126, Response to NRC Request for Additional Information, Set 20, Dated April 7, 2014, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1, and 2, License Renewal Application | Byron Braidwood | 6 May 2014 | | Response to NRC Request for Additional Information, Set 20, Dated April 7, 2014, Related to the Braidwood Station, Units 1 and 2, and Byron Station, Units 1, and 2, License Renewal Application |
RS-14-115, Attachment 9: Discussion of Revision to the Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station, Page PBAPS 3-77 Through End | Peach Bottom | 30 May 2014 | | Attachment 9: Discussion of Revision to the Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station, Page PBAPS 3-77 Through End |
RS-14-097, Units 1 & 2 - Responses to NRC Requests for Additional Information, Set 14, Dated March 18, 2014, Related to License Renewal Application | Byron Braidwood | 17 April 2014 | | Units 1 & 2 - Responses to NRC Requests for Additional Information, Set 14, Dated March 18, 2014, Related to License Renewal Application |
RS-14-080, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)- 513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. | Byron Braidwood | 18 March 2014 | | License Amendment Request for Adoption of Technical Specification Task Force (TSTF)- 513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. |
RS-14-063, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses Re Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | Quad Cities | 30 June 2014 | | Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses Re Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
RS-14-062, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | Peach Bottom | 30 June 2014 | | Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
RS-14-060, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | Limerick | 30 June 2014 | | Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
RS-14-059, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | LaSalle | 30 June 2014 | | Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
RS-14-058, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | Dresden | 30 June 2014 | | Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
RS-14-047, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | Peach Bottom | 26 February 2014 | | Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
RS-14-046, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | Quad Cities | 27 February 2014 | | Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
RS-14-045, Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | LaSalle | 27 February 2014 | | Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events |
RS-14-015, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049) | Quad Cities | 28 February 2014 | | Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049) |
RS-14-009, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049) | Clinton | 28 February 2014 | | Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049) |
RS-14-006, Updated Safety Analysis Report, Revision 16, CPS Operational Requirements Manual | Clinton | 9 January 2014 | | Updated Safety Analysis Report, Revision 16, CPS Operational Requirements Manual |
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 9 - Auxiliary Systems | Clinton | 9 January 2014 | | Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 9 - Auxiliary Systems |
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 7 - Instrument and Control Systems | Clinton | 9 January 2014 | | Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 7 - Instrument and Control Systems |
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 5 - Reactor Coolant System and Connected Systems | Clinton | 9 January 2014 | | Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 5 - Reactor Coolant System and Connected Systems |
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems | Clinton | 9 January 2014 | | Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 3 - Design of Structures, Components, Equipment, and Systems |
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 15 - Accident Analysis | Clinton | 9 January 2014 | | Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 15 - Accident Analysis |
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 14 - Initial Test Program | Clinton | 9 January 2014 | | Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 14 - Initial Test Program |
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 1 - Introduction and General Description of Plant | Clinton | 9 January 2014 | | Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Chapter 1 - Introduction and General Description of Plant |
RS-14-006, Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Appendix a - Glossary | Clinton | 9 January 2014 | | Clinton, Unit 1, Updated Safety Analysis Report, Revision 16, Appendix a - Glossary |
RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. | Dresden Quad Cities | 19 December 2013 | | Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. |
RS-13-259, Response to Request for Additional Information Re NRC Review of Unit 2 Cycle 15 Core Operating Limits Report | LaSalle | 31 October 2013 | | Response to Request for Additional Information Re NRC Review of Unit 2 Cycle 15 Core Operating Limits Report |
RS-13-240, License Amendment Request to Administratively Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program. | Braidwood | 10 October 2013 | | License Amendment Request to Administratively Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program. |
RS-13-138, Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138 | Limerick | 7 October 2013 | | Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138 |
RS-13-136, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Quad Cities | 27 June 2013 | | Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
RS-13-119, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Dresden | 28 August 2013 | | First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-13-117, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Clinton | 28 August 2013 | | First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-13-111, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Hardened Containment Vents (Order Number EA-12-050) | Dresden | 28 February 2013 | | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Hardened Containment Vents (Order Number EA-12-050) |
RS-13-092, License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure | LaSalle | 5 September 2013 | | License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure |
RS-13-085, Response to March 12, 2012, Request for Information Per 10 CFR 50.54(f) Recommendations of the Near- Term Task Force Review of Insights from Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency... | Peach Bottom | 30 April 2013 | | Response to March 12, 2012, Request for Information Per 10 CFR 50.54(f) Recommendations of the Near- Term Task Force Review of Insights from Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency... |
RS-13-084, Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency.. | Limerick | 30 April 2013 | | Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency.. |
RS-13-062, Fifth Ten-Year Interval Inservice Testing Program | Quad Cities | 25 February 2013 | | Fifth Ten-Year Interval Inservice Testing Program |
RS-13-052, Additional Information Regarding Relief Request I3R-09, Alternative to VT-2 Visual Inspection of Combustible Gas Control System Piping | Clinton | 8 February 2013 | | Additional Information Regarding Relief Request I3R-09, Alternative to VT-2 Visual Inspection of Combustible Gas Control System Piping |
RS-13-025, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Quad Cities | 28 February 2013 | | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-13-024, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) | Peach Bottom | 28 February 2013 | | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) |
RS-13-023, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Oyster Creek | 28 February 2013 | | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-13-022, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Limerick | 28 February 2013 | | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-13-020, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Dresden | 28 February 2013 | | Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-13-019, Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Clinton | 28 February 2013 | | Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RS-13-009, Operational Requirements Manual (Orm) 2013 | Clinton | 10 January 2013 | | Operational Requirements Manual (Orm) 2013 |
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 9 - Auxiliary Systems | Clinton | 10 January 2013 | | Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 9 - Auxiliary Systems |
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 7 - Instrumentation and Control Systems | Clinton | 10 January 2013 | | Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 7 - Instrumentation and Control Systems |
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 5 - Reactor Coolant System and Connected Systems | Clinton | 10 January 2013 | | Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 5 - Reactor Coolant System and Connected Systems |
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems | Clinton | 10 January 2013 | | Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems |
RS-13-002, Response to Request for Additional Information Related to License Amendment Request to Technical Specification 3.7.3, Ultimate Heat Sink. | LaSalle | 18 January 2013 | | Response to Request for Additional Information Related to License Amendment Request to Technical Specification 3.7.3, Ultimate Heat Sink. |
RS-12-223, License Amendment Request to Revise Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation. | Byron Braidwood | 21 December 2012 | | License Amendment Request to Revise Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation. |
RS-12-221, Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Specifications Bases | Byron | 14 December 2012 | | Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Specifications Bases |
RS-12-221, Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Requirements Manual | Byron | 14 December 2012 | | Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Requirements Manual |
RS-12-221, Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Specifications Bases | Braidwood | 14 December 2012 | | Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Specifications Bases |
RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 9.0 - Auxiliary Systems | Byron Braidwood | 14 December 2012 | | Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 9.0 - Auxiliary Systems |
RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 7.0 - Instrumentation and Controls | Byron Braidwood | 14 December 2012 | | Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 7.0 - Instrumentation and Controls |
RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 6.0 - Engineered Safety Features | Byron Braidwood | 14 December 2012 | | Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 6.0 - Engineered Safety Features |
RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 14.0 - Initial Test Program | Byron Braidwood | 14 December 2012 | | Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 14.0 - Initial Test Program |
RS-12-179, Response to Request for Additional Information Regarding Relief Requests Associated with the Fifth Inservice Testing Interval | Quad Cities | 8 October 2012 | | Response to Request for Additional Information Regarding Relief Requests Associated with the Fifth Inservice Testing Interval |
RS-12-174, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Peach Bottom | 19 November 2012 | | Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
RS-12-156, Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System | Dresden Peach Bottom Oyster Creek Byron Three Mile Island Braidwood Limerick Clinton Quad Cities LaSalle | 25 October 2012 | | Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System |
RS-12-155, Submittal of Relief Requests Associated with the Fifth Lnservice Testing Interval | Dresden | 30 October 2012 | | Submittal of Relief Requests Associated with the Fifth Lnservice Testing Interval |
RS-12-154, Attachment D to Proto-Power Calculation 97-195, Revision a | LaSalle | 17 September 2012 | | Attachment D to Proto-Power Calculation 97-195, Revision a |
RS-12-154, Attachment 2 - Heat Transfer Calculations Used to Develop Attachment 5 and Table A5-1 in the July 12, 2012, License Amendment Request | LaSalle | 17 September 2012 | | Attachment 2 - Heat Transfer Calculations Used to Develop Attachment 5 and Table A5-1 in the July 12, 2012, License Amendment Request |
RS-12-151, Fifth Interval Lnservice Inspection Program Plan and Relief Requests | Dresden | 28 September 2012 | | Fifth Interval Lnservice Inspection Program Plan and Relief Requests |
RS-12-150, Fifth Interval Inservice Inspection Program Plan and Relief Requests | Quad Cities | 28 September 2012 | | Fifth Interval Inservice Inspection Program Plan and Relief Requests |
RS-12-149, Response to Request for Additional Information Regarding Relief Requests Associated with the Fifth Inservice Testing Interval | Quad Cities | 13 September 2012 | | Response to Request for Additional Information Regarding Relief Requests Associated with the Fifth Inservice Testing Interval |
RS-12-026, Submittal of Relief Requests Associated with the Fifth Inservice Testing Interval | Quad Cities | 15 February 2012 | | Submittal of Relief Requests Associated with the Fifth Inservice Testing Interval |
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 15 - Accident and Transient Analyses | Quad Cities | 19 October 2011 | | Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 15 - Accident and Transient Analyses |
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 12 - Radiation Protection | Quad Cities | 19 October 2011 | | Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 12 - Radiation Protection |
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 11 - Radioactive Waste Management | Quad Cities | 19 October 2011 | | Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 11 - Radioactive Waste Management |
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 07 - Instrumentation and Controls | Quad Cities | 19 October 2011 | | Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 07 - Instrumentation and Controls |
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 05 - Reactor Coolant System and Connected Systems | Quad Cities | 19 October 2011 | | Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 05 - Reactor Coolant System and Connected Systems |
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 01 - Introduction | Quad Cities | 19 October 2011 | | Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Chapter 01 - Introduction |
RS-11-159, Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Appendix a | Quad Cities | 19 October 2011 | | Quad Cities, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 11, Appendix a |
RS-11-159, Quad Cities, Units 1 and 2 - Technical Specification Bases | Quad Cities | 19 October 2011 | | Quad Cities, Units 1 and 2 - Technical Specification Bases |
RS-11-159, Quad Cities, Units 1 and 2 - Technical Requirements Manual | Quad Cities | 19 October 2011 | | Quad Cities, Units 1 and 2 - Technical Requirements Manual |
RS-11-123, Supplemental Information Related to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for Rcs.. | LaSalle | 15 August 2011 | | Supplemental Information Related to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for Rcs.. |
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Technical Specification Bases | Dresden | 29 June 2011 | | Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Technical Specification Bases |
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 9.0, Auxiliary Systems | Dresden | 29 June 2011 | | Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 9.0, Auxiliary Systems |
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 7.0, Instrumentation and Controls | Dresden | 29 June 2011 | | Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 7.0, Instrumentation and Controls |
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 6.0, Engineered Safety Features | Dresden | 29 June 2011 | | Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 6.0, Engineered Safety Features |
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 5.0, Reactor Coolant System and Connected Systems | Dresden | 29 June 2011 | | Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 5.0, Reactor Coolant System and Connected Systems |
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 14.0, Initial Test Program | Dresden | 29 June 2011 | | Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 14.0, Initial Test Program |
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 12.0, Radiation Protection, Beginning Through Table 12A-4(1) | Dresden | 29 June 2011 | | Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 12.0, Radiation Protection, Beginning Through Table 12A-4(1) |
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 10.0, Steam and Power Conversion System | Dresden | 29 June 2011 | | Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9, Chapter 10.0, Steam and Power Conversion System |
RS-11-100, Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9 | Dresden | 29 June 2011 | | Dresden, Units 2 and 3, Updated Final Safety Analysis Report (Ufsar), Revision 9 |
RS-11-036, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. | LaSalle | 4 April 2011 | | License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. |
RS-10-208, Additional Information Supporting the Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation | Dresden | 13 December 2010 | | Additional Information Supporting the Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation |
RS-10-172, Additional Information Supporting the Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. | Dresden Quad Cities | 12 October 2010 | | Additional Information Supporting the Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. |
RS-10-165, Follow-up Information Supporting Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation | Dresden | 6 October 2010 | | Follow-up Information Supporting Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation |
RS-10-152, Additional Information Supporting the Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation | Dresden | 15 September 2010 | | Additional Information Supporting the Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation |
RS-10-096, Supplemental Information Concerning Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation | Quad Cities | 2 June 2010 | | Supplemental Information Concerning Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation |
RS-10-093, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B | Clinton | 21 May 2010 | | Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B |
RS-10-039, License Amendment Request to Administratively Revise Technical Specifications | Clinton | 4 June 2010 | | License Amendment Request to Administratively Revise Technical Specifications |
RS-10-032, Application for Technical Specification Change Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) | Quad Cities | 16 February 2010 | | Application for Technical Specification Change Regarding Risk-informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) |
RS-10-031, Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Rev.3) | LaSalle | 15 February 2010 | | Application for Technical Specification Change Regarding Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Rev.3) |
RS-10-030, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) | Byron | 15 February 2010 | | Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) |
RS-10-029, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program | Braidwood | 15 February 2010 | | Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program |
RS-10-028, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. | Dresden Clinton Quad Cities | 3 March 2010 | | Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. |
RS-10-024, Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program | Dresden | 16 February 2010 | | Application for Technical Specification Change Re Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program |
RS-10-021, License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode | Dresden | 4 October 2010 | | License Amendment Request to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode |
RS-10-018, Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation | Dresden | 4 February 2010 | | Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation |
RS-10-015, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. | LaSalle | 22 February 2010 | | Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. |
RS-10-008, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) | Clinton | 15 February 2010 | | Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) |
RS-10-001, LaSalle, Units 1 and 2, Attachment 8 - NEDO-33485, Rev. 0, Safety Analysis Report for LaSalle County Station Units 1 and 2, Thermal Power Optimization. | LaSalle | 27 January 2010 | | LaSalle, Units 1 and 2, Attachment 8 - NEDO-33485, Rev. 0, Safety Analysis Report for LaSalle County Station Units 1 and 2, Thermal Power Optimization. |
RS-09-157, Submittal of Site-Specific Safstor Decommissioning Cost Estimate | Byron | 16 November 2009 | | Submittal of Site-Specific Safstor Decommissioning Cost Estimate |
RS-09-153, Response to Request for Additional Information Regarding Generic Letter 2008-01 | Peach Bottom | 10 November 2009 | | Response to Request for Additional Information Regarding Generic Letter 2008-01 |
RS-09-152, Request for Amendment to Technical Specification 3.1 .7, Standby Liquid Control (SLC) System | Dresden Quad Cities | 10 November 2009 | | Request for Amendment to Technical Specification 3.1 .7, Standby Liquid Control (SLC) System |
RS-09-135, Additional Information Supporting the License Amendment to Technical Specification 3.5.1, Emergency Core Cooling Systems (ECCS) Operating. | LaSalle | 28 October 2009 | | Additional Information Supporting the License Amendment to Technical Specification 3.5.1, Emergency Core Cooling Systems (ECCS) Operating. |
RS-09-130, Additional Information Supporting Request for License Amendment Regarding Application of Alternative Source Term | LaSalle | 28 September 2009 | | Additional Information Supporting Request for License Amendment Regarding Application of Alternative Source Term |
RS-09-118, Submittal of Relief Requests Associated with the Third Inservice Inspection Interval | Braidwood | 4 September 2009 | | Submittal of Relief Requests Associated with the Third Inservice Inspection Interval |
RS-09-114, Site-Specific Safstor Decommissioning Cost Estimate | LaSalle | 27 August 2009 | | Site-Specific Safstor Decommissioning Cost Estimate |
RS-09-111, Submittal of Clinton Power Station Site-Specific Safstor Decommissioning Cost Estimate | Clinton | 27 August 2009 | | Submittal of Clinton Power Station Site-Specific Safstor Decommissioning Cost Estimate |
RS-09-105, Withdrawal of Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature | Clinton | 4 August 2009 | | Withdrawal of Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature |
RS-09-104, Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation, to Allow Alternate Method of Verifying Drywell Leakage | Dresden Quad Cities | 28 August 2009 | | Request for License Amendment to Revise Technical Specification 3.4.5, RCS Leakage Detection Instrumentation, to Allow Alternate Method of Verifying Drywell Leakage |
RS-09-079, Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature | Clinton | 15 June 2009 | | Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature |
RS-09-078, Response to Request for Additional Information Related to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation | Clinton | 23 June 2009 | | Response to Request for Additional Information Related to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation |
RS-09-077, Request for Processing an Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building.. | Clinton | 20 June 2009 | | Request for Processing an Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building.. |
RS-09-036, Request for License Amendment to Technical Specification (TS) 3.4.5, RCS Leakage Detection Instrumentation, TS 5.6.5, Core Operating Limits Report (Color), and Renewed Facility Operating License | Dresden Quad Cities | 7 April 2009 | | Request for License Amendment to Technical Specification (TS) 3.4.5, RCS Leakage Detection Instrumentation, TS 5.6.5, Core Operating Limits Report (Color), and Renewed Facility Operating License |
RS-09-020, Request for a License Amendment to Technical Specification 3.5.1, Emergency Core Cooling Systems (ECCS) Operating. | LaSalle | 26 March 2009 | | Request for a License Amendment to Technical Specification 3.5.1, Emergency Core Cooling Systems (ECCS) Operating. |
RS-09-003, Additional Information Supporting Requests for License Amendments to Adopt TSTF-423, Technical Specifications End States, NEDC-32988-A | Dresden Clinton Quad Cities | 30 January 2009 | | Additional Information Supporting Requests for License Amendments to Adopt TSTF-423, Technical Specifications End States, NEDC-32988-A |
RS-08-161, Technical Specification Bases | Byron | 15 December 2008 | | Technical Specification Bases |
RS-08-161, Braidwood, Units 1 and 2 - Technical Specification Bases | Braidwood | 15 December 2008 | | Braidwood, Units 1 and 2 - Technical Specification Bases |
RS-08-132, Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5 | LaSalle | 23 October 2008 | | Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5 |
RS-08-132, LaSalle County Station, Units 1 and 2 - Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5 | LaSalle | 23 October 2008 | | LaSalle County Station, Units 1 and 2 - Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5 |
RS-08-050, Amergen Energy Co, Llc., Three Month Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | Dresden Peach Bottom Oyster Creek Byron Three Mile Island Braidwood Limerick Quad Cities LaSalle | 11 April 2008 | | Amergen Energy Co, Llc., Three Month Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. |
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Table of Contents Through List of Effective Pages | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Table of Contents Through List of Effective Pages |
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Auxiliary Systems | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 9.0 - Auxiliary Systems |
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 8.0 - Electric Power | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 8.0 - Electric Power |
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 7.0 - Instrumentation and Control Systems | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 7.0 - Instrumentation and Control Systems |
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 6.0 - Engineered Safety Features | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 6.0 - Engineered Safety Features |
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 5.0 - Reactor Coolant System and Connected Systems | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 5.0 - Reactor Coolant System and Connected Systems |
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 3.0 - Design of Structures, Components, Equipment, and Systems | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 3.0 - Design of Structures, Components, Equipment, and Systems |
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 15.0 - Accident Analyses | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 15.0 - Accident Analyses |
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 12.0 - Radiation Protection | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 12.0 - Radiation Protection |
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 11.0 - Radioactive Waste Management | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 11.0 - Radioactive Waste Management |
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 1.0 - Introduction and General Description of Plant | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 1.0 - Introduction and General Description of Plant |
RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Appendix a Through Appendix N | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Appendix a Through Appendix N |
RS-08-045, LaSalle, Units 1 and 2, Technical Requirements Manual | LaSalle | 14 April 2008 | | LaSalle, Units 1 and 2, Technical Requirements Manual |
RS-08-025, Response to Request for Additional Information Related to Relief Request I3R-11, Hydrogen Recombiner System Piping - 10 CFR 50.55a(a)(3)(i). | LaSalle | 6 March 2008 | | Response to Request for Additional Information Related to Relief Request I3R-11, Hydrogen Recombiner System Piping - 10 CFR 50.55a(a)(3)(i). |
RS-07-143, Withdrawal of Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. | LaSalle | 12 October 2007 | | Withdrawal of Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. |
RS-07-139, Response to Request for Additional Information Regarding Request for Amendment to Technical Specification 5.5.16, Containment Leakage Rate Testing Program. | Byron Braidwood | 10 October 2007 | | Response to Request for Additional Information Regarding Request for Amendment to Technical Specification 5.5.16, Containment Leakage Rate Testing Program. |
RS-07-124, Additional Information Supporting Request for a License Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. | LaSalle | 7 September 2007 | | Additional Information Supporting Request for a License Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. |
RS-07-118, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process | Dresden | 9 October 2007 | | Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process |
RS-07-117, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process | Quad Cities | 9 October 2007 | | Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process |
RS-07-113, Additional Information Supporting Request for Emergency License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink. | LaSalle | 2 August 2007 | | Additional Information Supporting Request for Emergency License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink. |
RS-07-075, Withdrawal of Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program. | Clinton | 30 April 2007 | | Withdrawal of Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program. |
RS-07-074, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process | Clinton | 21 June 2007 | | Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process |
RS-07-051, Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. | LaSalle | 18 June 2007 | | Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. |
RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program | Dresden Peach Bottom Oyster Creek Byron Three Mile Island Braidwood Limerick Quad Cities | 8 August 2007 | | Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program |
RS-07-034, Additional Information Supporting the License Amendment Request Associated with Revised Allowable Values for Reactor Core Isolation Cooling Temperature Based Leak Detection | LaSalle | 6 April 2007 | | Additional Information Supporting the License Amendment Request Associated with Revised Allowable Values for Reactor Core Isolation Cooling Temperature Based Leak Detection |
RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process | Dresden Peach Bottom Oyster Creek Byron Three Mile Island Braidwood Limerick Clinton Quad Cities LaSalle | 12 April 2007 | | Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process |
RS-06-176, Site-Specific Decommissioning Cost Estimates | Byron Braidwood LaSalle | 18 December 2006 | | Site-Specific Decommissioning Cost Estimates |
RS-06-154, Request for Amendment to Technical Specifications Section 5.5.7, Inservice Testing Program. | LaSalle | 17 November 2006 | | Request for Amendment to Technical Specifications Section 5.5.7, Inservice Testing Program. |
RS-06-151, Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program. | Clinton | 16 November 2006 | | Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program. |
RS-06-149, Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power | LaSalle | 12 October 2006 | | Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power |
RS-06-141, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process | LaSalle | 18 October 2006 | | Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process |
RS-06-126, Additional Information Supporting License Amendment Request Associated with Direct Current Electrical Power | LaSalle | 13 September 2006 | | Additional Information Supporting License Amendment Request Associated with Direct Current Electrical Power |
RS-06-048, ILRT Interval Extension Risk Assessment | LaSalle | 31 March 2006 | | ILRT Interval Extension Risk Assessment |
RS-06-019, Response to NRC Request for Additional Information with Respect to Request for License Amendment Related to Application of Alternative Radiological Source Term | Byron Braidwood | 13 February 2006 | | Response to NRC Request for Additional Information with Respect to Request for License Amendment Related to Application of Alternative Radiological Source Term |
RS-06-004, Additional Information Supporting Request for License Amendment Regarding Offsite Power Instrumentation and Voltage Control | Dresden | 13 January 2006 | | Additional Information Supporting Request for License Amendment Regarding Offsite Power Instrumentation and Voltage Control |
RS-06-003, Request for a License Amendment to Revise Allowable Values for Reactor Core Isolation Cooling Temperature Based Leak Detection | LaSalle | 16 March 2006 | | Request for a License Amendment to Revise Allowable Values for Reactor Core Isolation Cooling Temperature Based Leak Detection |
RS-05-154, Request for Amendment to Technical Specifications Associated with Secondary Containment Surveillance Requirements | Clinton | 1 December 2005 | | Request for Amendment to Technical Specifications Associated with Secondary Containment Surveillance Requirements |
RS-05-132, Additional Information Supporting the Request for License Amendment Related to 24-Month Fuel Cycle | Clinton | 30 September 2005 | | Additional Information Supporting the Request for License Amendment Related to 24-Month Fuel Cycle |
RS-05-130, Fourth Ten-Year Interval Inservice Testing Program | Quad Cities | 29 September 2005 | | Fourth Ten-Year Interval Inservice Testing Program |
RS-05-114, Rev. 0 to Calculation DRE05-0048, Dresden Units 2 & 3 Post-LOCA Eab, LPZ, and CR Dose - AST Analysis. | Dresden | 14 August 2005 | | Rev. 0 to Calculation DRE05-0048, Dresden Units 2 & 3 Post-LOCA Eab, LPZ, and CR Dose - AST Analysis. |
RS-05-111, Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term | Clinton | 19 August 2005 | | Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term |
RS-05-104, Revised Technical Specification Pages for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values | Clinton | 21 September 2005 | | Revised Technical Specification Pages for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values |
RS-05-064, Commitments and Plans Related to Extended Power Uprate Operation | Dresden Quad Cities | 13 May 2005 | | Commitments and Plans Related to Extended Power Uprate Operation |
RS-05-062, Additional Information Supporting the Request for License Amendment Related to 21-Month Fuel Cycle | Clinton | 23 May 2005 | | Additional Information Supporting the Request for License Amendment Related to 21-Month Fuel Cycle |
RS-05-039, Response to Request for Additional Information for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values | Clinton | 30 March 2005 | | Response to Request for Additional Information for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values |
RS-05-037, Request for License Amendment Regarding Offsite Power Instrumentation and Voltage Control | Dresden | 4 April 2005 | | Request for License Amendment Regarding Offsite Power Instrumentation and Voltage Control |
RS-05-032, Request for Technical Specification Change to Revise Secondary Containment Bypass Leakage Surveillance Requirement | Clinton | 25 March 2005 | | Request for Technical Specification Change to Revise Secondary Containment Bypass Leakage Surveillance Requirement |
RS-05-027, Request for Amendment to Appendix a, Technical Specifications for the Oscillation Power Range Monitor Instrumentation | Clinton | 1 April 2005 | | Request for Amendment to Appendix a, Technical Specifications for the Oscillation Power Range Monitor Instrumentation |
RS-05-008, Additional Information Supporting Main Steam Line Flow - High Instrumentation Amendment Request | Quad Cities | 21 January 2005 | | Additional Information Supporting Main Steam Line Flow - High Instrumentation Amendment Request |
RS-05-001, Request for a License Amendment to Extend the Completion Times Related to Technical Specifications Associated with Residual Heat Removal Service Water, Diesel Generator Cooling Water and the Opposite Unit Division 2 Diesel.. | LaSalle | 13 April 2005 | | Request for a License Amendment to Extend the Completion Times Related to Technical Specifications Associated with Residual Heat Removal Service Water, Diesel Generator Cooling Water and the Opposite Unit Division 2 Diesel.. |
RS-04-188, Request for Amendment to Technical Specifications Associated with Direct Current Electrical Power | LaSalle | 9 December 2004 | | Request for Amendment to Technical Specifications Associated with Direct Current Electrical Power |
RS-04-174, Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term | Clinton | 17 December 2004 | | Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term |
RS-04-172, Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term | Clinton | 9 December 2004 | | Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term |
RS-04-147, Response to NRC Inspection Items Regarding Concrete Expansion Anchors | Dresden Quad Cities | 30 September 2004 | | Response to NRC Inspection Items Regarding Concrete Expansion Anchors |
RS-04-141, Amergen Request for Amendment to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process | Dresden Peach Bottom Byron Braidwood Clinton Quad Cities LaSalle | 15 September 2004 | | Amergen Request for Amendment to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process |
RS-04-131, Transmittal of Supplemental Information Supporting the Request for Technical Specification Changes to Eliminate Selected Response Time Testing Requirements | LaSalle | 2 September 2004 | | Transmittal of Supplemental Information Supporting the Request for Technical Specification Changes to Eliminate Selected Response Time Testing Requirements |
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program | Dresden Peach Bottom Oyster Creek Byron Three Mile Island Braidwood Limerick Clinton Quad Cities LaSalle | 29 November 2004 | | Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program |
RS-04-110, Additional Information to Support Review of the Request for Technical Specification Changes Related to Primary Containment Isolation Instrumentation (Main Steam Line Flow-High) | Quad Cities | 21 July 2004 | | Additional Information to Support Review of the Request for Technical Specification Changes Related to Primary Containment Isolation Instrumentation (Main Steam Line Flow-High) |
RS-04-105, Additional Information to Support Review of the Request for Technical Specification Changes Related to Primary Containment Isolation Instrumentation (Main Steam Line Flow-High) | Quad Cities | 19 July 2004 | | Additional Information to Support Review of the Request for Technical Specification Changes Related to Primary Containment Isolation Instrumentation (Main Steam Line Flow-High) |
RS-04-096, Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term | Dresden Quad Cities | 30 June 2004 | | Additional Information Supporting the Request for License Amendment Related to Application of Alternative Source Term |
RS-04-086, Request for Exemption from 10 CFR 50 Appendix J in Support of Request for License Amendment Related to Application of Alternative Source Term | Clinton | 1 July 2004 | | Request for Exemption from 10 CFR 50 Appendix J in Support of Request for License Amendment Related to Application of Alternative Source Term |
RS-04-069, License Amendment Request Activation of the Trip Outputs of the Oscillation Power Range Monitor System | LaSalle | 30 April 2004 | | License Amendment Request Activation of the Trip Outputs of the Oscillation Power Range Monitor System |
RS-04-062, Technical Specifications Changes Related to Main Steam Line Flow-High Isolation Instrumentation | Quad Cities | 10 June 2004 | | Technical Specifications Changes Related to Main Steam Line Flow-High Isolation Instrumentation |
RS-04-043, Request for Technical Specification Changes to Eliminate Selected Response Time Testing Requirements | LaSalle | 12 March 2004 | | Request for Technical Specification Changes to Eliminate Selected Response Time Testing Requirements |
RS-04-039, Amendment to the Application for Renewed Operating Licenses for Dresden and Quad Cities Nuclear Power Stations | Dresden Quad Cities | 5 March 2004 | | Amendment to the Application for Renewed Operating Licenses for Dresden and Quad Cities Nuclear Power Stations |
RS-04-004, Request for Amendment to Technical Specificaiton 5.5.12, Primary Containment Leakage Rate Testing Program. | Dresden | 15 January 2004 | | Request for Amendment to Technical Specificaiton 5.5.12, Primary Containment Leakage Rate Testing Program. |
RS-04-002, License Amendment Request Regarding Activation of the Trip Outputs of the Oscillation Power Range Monitor System | Dresden Quad Cities | 27 February 2004 | | License Amendment Request Regarding Activation of the Trip Outputs of the Oscillation Power Range Monitor System |
RS-03-239, Additional Information Supporting the Request for License Amendment Related to Application of the Alternative Source Term | Clinton | 23 December 2003 | | Additional Information Supporting the Request for License Amendment Related to Application of the Alternative Source Term |
RS-03-229, Additional Information Regarding License Amendment Request for Main Steam Line Low Pressure Isolation Setpoint | Dresden Quad Cities | 5 December 2003 | | Additional Information Regarding License Amendment Request for Main Steam Line Low Pressure Isolation Setpoint |
RS-03-208, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | Dresden Byron Braidwood Clinton Quad Cities LaSalle | 5 November 2003 | | Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure |
RS-03-199, Request for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values | Clinton | 11 November 2003 | | Request for License Amendment Related to Revision of Instrument Channel Trip Setpoint Allowable Values |
RS-03-185, Additional Information Supporting the Request for Amendment to Technical Specifications 3.6.5.1, Drywell, and 5.5.13, Primary Containment Rate Testing Program. | Clinton | 15 September 2003 | | Additional Information Supporting the Request for Amendment to Technical Specifications 3.6.5.1, Drywell, and 5.5.13, Primary Containment Rate Testing Program. |
RS-03-184, Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery. | Dresden Peach Bottom Byron Three Mile Island Braidwood Limerick Clinton Quad Cities LaSalle | 19 September 2003 | | Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery. |
RS-03-172, Additional Information Supporting the Request for License Amendment Related to Application for Alternative Source Term | Dresden Quad Cities | 15 September 2003 | | Additional Information Supporting the Request for License Amendment Related to Application for Alternative Source Term |
RS-03-165, Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing | Dresden Quad Cities | 8 August 2003 | | Additional Information Supporting the Request for Technical Specifications Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing |
RS-03-164, Supplemental Information Supporting License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations | Clinton | 19 August 2003 | | Supplemental Information Supporting License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations |
RS-03-160, Additional Information Supporting the Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. | Quad Cities | 5 August 2003 | | Additional Information Supporting the Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. |
RS-03-157, Additional Information Regarding Inservice Testing Program Relief Requests | Dresden | 6 August 2003 | | Additional Information Regarding Inservice Testing Program Relief Requests |
RS-03-145, Request for Amendments to TS Section 5.5.13, Primary Containment Leakage Rate Testing Program | LaSalle | 19 August 2003 | | Request for Amendments to TS Section 5.5.13, Primary Containment Leakage Rate Testing Program |
RS-03-140, Request for Amendment to Technical Specifications Associated with Direct Current Electrical Power | Dresden | 29 July 2003 | | Request for Amendment to Technical Specifications Associated with Direct Current Electrical Power |
RS-03-124, Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | Dresden Byron Braidwood Clinton Quad Cities LaSalle | 19 June 2003 | | Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure |
RS-03-122, Response to Request for Additional Information to Support Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. | LaSalle | 20 June 2003 | | Response to Request for Additional Information to Support Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. |
RS-03-106, Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.8 | LaSalle | 10 June 2003 | | Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.8 |
RS-03-083, Additional Information Supporting Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. Reflects One-time Deferral of Primary Containment Type a Test | Quad Cities | 11 April 2003 | | Additional Information Supporting Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. Reflects One-time Deferral of Primary Containment Type a Test |
RS-03-081, Request for License Amendment for Core Flow Operating Range Expansion & Oscillation Power Range Monitor (OPRM) Instrumentation | Clinton | 1 May 2003 | | Request for License Amendment for Core Flow Operating Range Expansion & Oscillation Power Range Monitor (OPRM) Instrumentation |
RS-03-075, Request for Amendment to TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation | LaSalle | 18 April 2003 | | Request for Amendment to TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation |
RS-03-069, Supplemental Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations | Clinton | 28 March 2003 | | Supplemental Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations |
RS-03-060, Request for License Amendment Related to Application of Alternative Source Term | Clinton | 3 April 2003 | | Request for License Amendment Related to Application of Alternative Source Term |
RS-03-044, Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. | Quad Cities | 27 February 2003 | | Request for Amendment to Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program. |
RS-03-038, Request for Amendment to TS for Main Steam Line Low Pressure Isolation Function | Dresden Quad Cities | 28 March 2003 | | Request for Amendment to TS for Main Steam Line Low Pressure Isolation Function |
RS-03-036, Request for TS Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing | Dresden Quad Cities | 14 February 2003 | | Request for TS Surveillance Requirement 3.6.1.3.8 Change Related to Excess Flow Check Valve Testing |
RS-03-031, Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.8 | LaSalle | 18 April 2003 | | Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.8 |
RS-03-026, Request for TS Changes Related to Primary Containment Isolation Instrumentation for the Isolation Condenser System | Dresden | 31 January 2003 | | Request for TS Changes Related to Primary Containment Isolation Instrumentation for the Isolation Condenser System |
RS-03-018, Proposed Alternative Testing Requirements for Containment Isolation Check Valves 1C11-F122 & 1/a175 for Second 10-Year Inservice Testing Program | Clinton | 3 February 2003 | | Proposed Alternative Testing Requirements for Containment Isolation Check Valves 1C11-F122 & 1/a175 for Second 10-Year Inservice Testing Program |
RS-03-013, Request for Amendment to TS 3.6.5.1, Drywell & 5.5.13, Primary Containment Leakage Rate Testing Program | Clinton | 29 January 2003 | | Request for Amendment to TS 3.6.5.1, Drywell & 5.5.13, Primary Containment Leakage Rate Testing Program |
RS-03-006, Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis. | LaSalle | 13 January 2003 | | Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis. |
RS-02-215, Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup Mode | Dresden | 20 December 2002 | | Request for License Amendment to Eliminate Main Steam Isolation Valve Closure & Low Condenser Vacuum Scram Functions During Startup Mode |
RS-02-207, Amendment 20 to Byron/Braidwood Stations Fire Protection Report, Tables 2.4-5 - 3-1 | Byron Braidwood | 31 December 2002 | | Amendment 20 to Byron/Braidwood Stations Fire Protection Report, Tables 2.4-5 - 3-1 |
RS-02-174, Co., Llc. (EGC) Application for Amendment to Licenses DPR-19, DPR-25, DPR-29 & DPR-30, Related to Application of Alternative Source Term, Attachments a - E-1 | Dresden Quad Cities | 10 October 2002 | | Co., Llc. (EGC) Application for Amendment to Licenses DPR-19, DPR-25, DPR-29 & DPR-30, Related to Application of Alternative Source Term, Attachments a - E-1 |
RS-02-164, Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. | LaSalle | 24 October 2002 | | Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. |
RS-02-150, Additional Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations | Clinton | 23 August 2002 | | Additional Information Supporting the License Amendment Request to Permit Inclined Fuel Transfer System Blind Flange Removal During Power Operations |
RS-02-076, Request for Amendment to Technical Specifications, Excess Flow Check Valve Testing Surveillance Requirement 3.6.1.3.8 & Relief Request RV-12 | LaSalle | 31 May 2002 | | Request for Amendment to Technical Specifications, Excess Flow Check Valve Testing Surveillance Requirement 3.6.1.3.8 & Relief Request RV-12 |
RS-02-047, Supplemental Information Supporting a License Amendment Request to Revise Plant System Requirements During Fuel Handling Based on Alternative Source Term | Clinton | 1 March 2002 | | Supplemental Information Supporting a License Amendment Request to Revise Plant System Requirements During Fuel Handling Based on Alternative Source Term |
RS-02-013, Response to Request for Additional Information Regarding Risk Aspects of Inclined Fuel Transfer System License Amendment Request for Clinton Power Station | Clinton | 15 January 2002 | | Response to Request for Additional Information Regarding Risk Aspects of Inclined Fuel Transfer System License Amendment Request for Clinton Power Station |
RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers | Robinson | 27 September 2017 | | License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers |
RNP-RA/16-0057, License Amendment Request to Modify the Licensing Basis Alternate Source Term | Robinson | 14 September 2016 | | License Amendment Request to Modify the Licensing Basis Alternate Source Term |
RNP-RA/16-0046, ISFSIs - Transmittal of Emergency Plan, Emergency Implementing Procedure Revisions, and 10 CFR 50.54(q) Summary of Analyses | Robinson 07200003 07200060 | 30 June 2016 | | ISFSIs - Transmittal of Emergency Plan, Emergency Implementing Procedure Revisions, and 10 CFR 50.54(q) Summary of Analyses |
RNP-RA/15-0090, Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And.. | Robinson | 19 November 2015 | | Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And.. |
RNP-RA/15-0034, Proposed Changes to Emergency Plan | Robinson | 13 May 2015 | | Proposed Changes to Emergency Plan |
RNP-RA/15-0021, Supplemental Response to 120-Day Response Submittal to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection (NFPA) Standard 805 | Robinson | 1 April 2015 | | Supplemental Response to 120-Day Response Submittal to Request for Additional Information Associated with License Amendment Request to Adopt National Fire Protection (NFPA) Standard 805 |
RNP-RA/13-0117, License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation | Robinson | 10 February 2014 | | License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation |
RNP-RA/12-0137, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Revision and 10 CFR 50.54(q) Summary of Analysis | Robinson 07200003 07200060 | 31 December 2012 | | Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Revision and 10 CFR 50.54(q) Summary of Analysis |
RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Robinson | 7 March 2008 | | Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
RNP-RA/04-0119, Transmittal of Emergency Plan Revision | Robinson 07200003 | 29 September 2004 | | Transmittal of Emergency Plan Revision |
RNP-RA/04-0067, Standard Procedure, Volume 99, Book/Part 99, EGR-NGGC-0153, Rev 10, Engineering Instrument Setpoints | Robinson | 20 August 2004 | | Standard Procedure, Volume 99, Book/Part 99, EGR-NGGC-0153, Rev 10, Engineering Instrument Setpoints |
RNP-RA/03-0142, Transmittal of Emergency Procedure Revisions | Robinson | 19 November 2003 | | Transmittal of Emergency Procedure Revisions |
RNP-RA/03-0121, Supplement to Amendment Request Regarding One-Time Extension of Containment Type a Test Interval | Robinson | 13 October 2003 | | Supplement to Amendment Request Regarding One-Time Extension of Containment Type a Test Interval |
RNP-RA/02-0077, Radiological Environmental Operating Report for 2001 | Robinson | 15 May 2002 | | Radiological Environmental Operating Report for 2001 |
RNP-RA/02-0067, Request for Technical Specifications Change, Full Implementation of Alternative Radiological Source Term | Robinson | 10 May 2002 | | Request for Technical Specifications Change, Full Implementation of Alternative Radiological Source Term |
RNP-RA/02-0066, Request for Amendment Re Increase Authorized Reactor Core Power Level from 2399 Mwt to 2339 Mwt (Approximately 1.7 Percent) | Robinson | 16 May 2002 | | Request for Amendment Re Increase Authorized Reactor Core Power Level from 2399 Mwt to 2339 Mwt (Approximately 1.7 Percent) |
RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations with a Potential for Draining the Reactor Vessel | | 26 September 2012 | | NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations with a Potential for Draining the Reactor Vessel |
RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations With a Potential For Draining the Reactor Vessel | | 26 September 2012 | | NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations With a Potential For Draining the Reactor Vessel |
RIS 2008-27, Staff Position on Extension of the Containment Type a Test Interval Beyond 15 Years Under Option B of Appendix J to 10 CFR Part 50 | | 8 December 2008 | | Staff Position on Extension of the Containment Type a Test Interval Beyond 15 Years Under Option B of Appendix J to 10 CFR Part 50 |
RIS 2008-12, Enclosure 1: Information That NRC Staff May Require To Authorize Extended Interim Storage of Low-Level Radioactive Waste | | 9 May 2008 | | Enclosure 1: Information That NRC Staff May Require To Authorize Extended Interim Storage of Low-Level Radioactive Waste Enclosure 3 - Bibliography Enclosure 2: List of Low-Level Radioactive Waste Compacts and Unaffiliated States Enclosure 4: List of Recently Issued FSME Generic Communications |
RIS 2006-10, NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph Iii.G.2 Operator Manual Actions | | 30 June 2006 | | NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph Iii.G.2 Operator Manual Actions |
RIS 2006-10, NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions | | 30 June 2006 | | NRC Regulatory Issue Summary NRC Regulatory Issue Summary 2006-010 - Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions |
RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety | Summer | 15 September 1999 | | Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety |
RC-93-0310, (VCSNS) - Technical Specification Change - TSP 930011 Accident Monitoring Instrument | Summer | 17 December 1993 | | (VCSNS) - Technical Specification Change - TSP 930011 Accident Monitoring Instrument |
RC-18-0080, Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems | Summer | 31 May 2018 | | Virgil C. Summer Nuclear Station, Unit 1, Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems |
RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change | Summer | 6 October 2017 | | (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change |
RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems | Summer | 25 May 2016 | | Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems |
RC-14-0032, Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments Iii, Iv, V & Vi: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EA | Summer | 7 April 2014 | | Virgil C. Summer Unit 1, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments Iii, Iv, V & Vi: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL |
RC-14-0032, License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments III, IV, V & VI: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL Comparison.. | Summer | 7 April 2014 | | License Amendment Request LAR-14-02392, Request for NRC Approval of Proposed Changes to Emergency Action Levels. Attachments III, IV, V & VI: Technical Bases for Proposed EALs (Clean Copy), NEI 99-01 Revision 6 EAL Comparison.. |
RC-13-0140, 10 CFR 71.95 Report on the 8-120B Cask | Summer 07109168 | 20 September 2013 | | 10 CFR 71.95 Report on the 8-120B Cask |
RC-13-0069, Request Relief from ASME Code Requirements in VCSNS 4th Ten Year Inservice Inspection Interval | Summer | 16 May 2013 | | Request Relief from ASME Code Requirements in VCSNS 4th Ten Year Inservice Inspection Interval |
RC-13-0037, Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years | Summer | 3 April 2013 | | Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years |
RC-12-0141, Response to Request for Additional Information License Amendment Request LAR 10-03912 Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (RWST) | Summer | 20 September 2012 | | Response to Request for Additional Information License Amendment Request LAR 10-03912 Technical Specification Change Request for TS 3.5.4, Refueling Water Storage Tank (RWST) |
RC-11-0158, License Amendment Request - LAR (11-04569), Technical Specification Change to Extend Integrated Leak Rate Test Interval One-Time | Summer | 12 October 2011 | | License Amendment Request - LAR (11-04569), Technical Specification Change to Extend Integrated Leak Rate Test Interval One-Time |
RC-11-0157, License Amendment Request LAR 11-04821, Request for Prior NRC Approval to Exempt Five-High-Head Safety Injection Containment Isolation Valves from Local Leak Rate Testing Requirements | Summer | 12 October 2011 | | License Amendment Request LAR 11-04821, Request for Prior NRC Approval to Exempt Five-High-Head Safety Injection Containment Isolation Valves from Local Leak Rate Testing Requirements |
RC-11-0094, Technical Specification Bases Revision Updated Through June 2011 | Summer | 31 August 2011 | | Technical Specification Bases Revision Updated Through June 2011 |
RC-11-0052, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. | Summer | 2 May 2011 | | License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. |
RC-09-0004, License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.67 | Summer | 17 February 2009 | | License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.67 |
RC-07-0025, License Amendment Request - LAR 05-3594 Steam Generator Tube Integrity | Summer | 15 February 2007 | | License Amendment Request - LAR 05-3594 Steam Generator Tube Integrity |
RC-06-0084, License Amendment Request - LAR 05-3594, Steam Generator Tube Integrity | Summer | 24 May 2006 | | License Amendment Request - LAR 05-3594, Steam Generator Tube Integrity |
RC-04-0074, License Amendment Request - LAR 03-4159 Elimination of Hydrogen Recombiners and Change to Hydrogen Analyzers Using the Consolidated Line Item Improvement Process | Summer | 21 May 2004 | | License Amendment Request - LAR 03-4159 Elimination of Hydrogen Recombiners and Change to Hydrogen Analyzers Using the Consolidated Line Item Improvement Process |
RC-02-0123, Application for Renewed Operating License, Appendix F Severe Accident Mitigation Alternatives | Summer | 6 August 2002 | | Application for Renewed Operating License, Appendix F Severe Accident Mitigation Alternatives |
RBG-48142, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | River Bend | 27 February 2023 | | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSFT-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b |
RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | River Bend | 4 September 2020 | | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements |
RBG-47983, Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b. | River Bend | 18 November 2019 | | Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b. |
RBG-47925, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | River Bend | 20 December 2018 | | Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) |
RBG-47918, Removal of the Table of Contents from the Technical Specifications | River Bend | 29 November 2018 | | Removal of the Table of Contents from the Technical Specifications |
RBG-47906, Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 | River Bend | 18 October 2018 | | Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 |
RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | River Bend | 24 July 2018 | | Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) |
RBG-47883, Amendment 1 to License Renewal Application | River Bend | 2 August 2018 | | Amendment 1 to License Renewal Application |
RBG-47882, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | River Bend | 10 July 2018 | | Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) |
RBG-47859, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | River Bend | 26 April 2018 | | Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control |
RBG-47852, Response to License Renewal Application NRC Request for Additional Information Set 13 | River Bend | 10 May 2018 | | Response to License Renewal Application NRC Request for Additional Information Set 13 |
RBG-47851, Response to License Amendment Request (LAR) Technical Specification 3.7.7, Control Building Air Conditioning (Cbac) System NRC Request for Additional Information (RAI) | River Bend | 28 March 2018 | | Response to License Amendment Request (LAR) Technical Specification 3.7.7, Control Building Air Conditioning (Cbac) System NRC Request for Additional Information (RAI) |
RBG-47828, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 8 | River Bend | 20 February 2018 | | Response to License Renewal Application NRC Request for Additional Information (RAI) Set 8 |
RBG-47813, Response to License Renewal Application (LRA) NRC Request for Additional Information Set 5 | River Bend | 24 January 2018 | | Response to License Renewal Application (LRA) NRC Request for Additional Information Set 5 |
RBG-47811, Submittal of Emergency Plan and Emergency Implementing Procedure | River Bend | 12 December 2017 | | Submittal of Emergency Plan and Emergency Implementing Procedure |
RBG-47808, Inservice Inspection Plan for the Fourth Ten-Year Interval | River Bend | 30 November 2017 | | Inservice Inspection Plan for the Fourth Ten-Year Interval |
RBG-47801, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | River Bend | 15 November 2017 | | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control |
RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | River Bend | 28 February 2018 | | Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) |
RBG-47776, Redacted-River Bend Station, Unit 1, Revision 25 to the Updated Safety Analysis Report, Chapter 9, Section 9.1 Through Appendix 9B | River Bend | 28 July 2017 | | Redacted-River Bend Station, Unit 1, Revision 25 to the Updated Safety Analysis Report, Chapter 9, Section 9.1 Through Appendix 9B |
RBG-47775, Revisions to the Technical Requirements Manual and the Technical Specification Bases | River Bend | 20 July 2017 | | Revisions to the Technical Requirements Manual and the Technical Specification Bases |
RBG-47735, License Renewal Application - Appendices a Through D | River Bend | 31 May 2017 | | License Renewal Application - Appendices a Through D |
RBG-47695, Response to Request to Additional Information Regarding RBS License Amendment Request to Extend Type a and Type C Test Frequencies | River Bend | 27 July 2016 | | Response to Request to Additional Information Regarding RBS License Amendment Request to Extend Type a and Type C Test Frequencies |
RBG-47675, Response to NRC Request for Additional Information - RBS LAR to Extend Type a and Type C Test Frequencies | River Bend | 19 April 2016 | | Response to NRC Request for Additional Information - RBS LAR to Extend Type a and Type C Test Frequencies |
RBG-47620, License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months | River Bend | 29 October 2015 | | License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months |
RBG-47618, Completion of Required Action by NRC Order EA-12-049, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events - River Bend Station, Unit 1 | River Bend | 29 September 2015 | | Completion of Required Action by NRC Order EA-12-049, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events - River Bend Station, Unit 1 |
RBG-47605, Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation. | River Bend | 20 August 2015 | | Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation. |
RBG-47603, Revisions to the Technical Requirements Manual and the Technical Specifications Bases | River Bend | 11 August 2015 | | Revisions to the Technical Requirements Manual and the Technical Specifications Bases |
RBG-47600, Request for Interpretation of Technical Specifications | River Bend | 4 August 2015 | | Request for Interpretation of Technical Specifications |
RBG-47557, Response to Request for Additional Information on Application for TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation | River Bend | 23 April 2015 | | Response to Request for Additional Information on Application for TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation |
RBG-47497, Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, River Bend Station, Unit 1 | River Bend | 2 September 2014 | | Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, River Bend Station, Unit 1 |
RBG-47432, License Amendment Request 2013-18 Re Revision of Ultimate Heat Sink Design Capacity | River Bend | 10 February 2014 | | License Amendment Request 2013-18 Re Revision of Ultimate Heat Sink Design Capacity |
RBG-47404, Unit 1, License Amendment Request 2013-17, Revision of the Ventilation Filter Testing Program and Associated Surveillance Requirements | River Bend | 4 November 2013 | | Unit 1, License Amendment Request 2013-17, Revision of the Ventilation Filter Testing Program and Associated Surveillance Requirements |
RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases | River Bend | 25 July 2013 | | Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases |
RBG-47350, License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs | River Bend | 28 May 2013 | | License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs |
RBG-47329, Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | River Bend | 28 February 2013 | | Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
RBG-47322, Submittal of Request for Amendment to the Technical Specifications | River Bend | 13 June 2013 | | Submittal of Request for Amendment to the Technical Specifications |
RBG-47278, Request for Exemption to 10 CFR 50 Appendix J | River Bend | 23 August 2012 | | Request for Exemption to 10 CFR 50 Appendix J |
RBG-47229, Supplemental Information Concerning License Amendment Submittals | River Bend | 3 April 2012 | | Supplemental Information Concerning License Amendment Submittals |
RBG-47211, Response to Request for Information Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation. | River Bend | 24 February 2012 | | Response to Request for Information Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation. |
RBG-47207, Response to Request for Information, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation. | River Bend | 7 February 2012 | | Response to Request for Information, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation. |
RBG-47193, License Amendment Request 2011-05 Degraded Voltage Surveillance Frequency Extension and Allowable Value Changes | River Bend | 8 December 2011 | | License Amendment Request 2011-05 Degraded Voltage Surveillance Frequency Extension and Allowable Value Changes |
RBG-47176, Supplemental Information Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation | River Bend | 16 September 2011 | | Supplemental Information Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation |
RBG-47169, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases | River Bend | 3 August 2011 | | Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases |
RBG-47157, License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation | River Bend | 27 July 2011 | | License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation |
RBG-47135, License Amendment Request 2011-06, Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. | River Bend | 11 April 2011 | | License Amendment Request 2011-06, Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. |
RBG-47048, License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities | River Bend | 22 July 2010 | | License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities |
RBG-47006, Revisions to the Technical Requirements Manual and the Technical Specification Bases | River Bend | 17 February 2010 | | Revisions to the Technical Requirements Manual and the Technical Specification Bases |
RBG-46985, Unit 1, Supplement to License Amendment Request (LAR) LAR 2009-05, Dated August 10, 2009 Regarding 24-Month Fuel Cycles | River Bend | 8 December 2009 | | Unit 1, Supplement to License Amendment Request (LAR) LAR 2009-05, Dated August 10, 2009 Regarding 24-Month Fuel Cycles |