Letter Sequence Request |
|---|
CAC:MF8278, Use of TS 3.10.1 for SCRAM Time Testing Activities (Approved, Closed) CAC:MF8224, Use of TS 3.10.1 for SCRAM Time Testing Activities (Withdrawn, Closed) CAC:MF8279, Use of TS 3.10.1 for SCRAM Time Testing Activities (Withdrawn, Closed) |
|
MONTHYEARRA-16-021, License Amendment Request for Proposed Changes to Technical Specifications Section 6.0 Administrative Controls for Permanently Defueled Condition2016-05-17017 May 2016 License Amendment Request for Proposed Changes to Technical Specifications Section 6.0 Administrative Controls for Permanently Defueled Condition Project stage: Request RS-16-132, Certification of Permanent Cessation of Power Operations2016-06-20020 June 2016 Certification of Permanent Cessation of Power Operations Project stage: Request RS-16-133, Certification of Permanent Cessation of Power Operations2016-06-20020 June 2016 Certification of Permanent Cessation of Power Operations Project stage: Request RS-16-153, License Amendment Request for Proposed Change to Technical Specifications Section 5.0, Administrative Controls for Permanently Defueled Condition2016-07-28028 July 2016 License Amendment Request for Proposed Change to Technical Specifications Section 5.0, Administrative Controls for Permanently Defueled Condition Project stage: Request RS-16-161, Request for NRC to Suspend Review of License Amendment Requests2016-08-11011 August 2016 Request for NRC to Suspend Review of License Amendment Requests Project stage: Request ML16224A8952016-08-11011 August 2016 License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition Project stage: Request RS-16-160, Request for Exemption from Specific Provisions in 10 CFR 73.55(p) (1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather2016-08-16016 August 2016 Request for Exemption from Specific Provisions in 10 CFR 73.55(p) (1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather Project stage: Request ML16231A3902016-09-0606 September 2016 Acceptance of Requested Licensing Action Request for Exemption Related to Security Measures in an Emergency or During Severe Weather (CAC MF8275 - MF8278) Project stage: Acceptance Review ML16263A0292016-09-19019 September 2016 Acceptance Review Concerning Changes to Admin Control Section (CAC No. MF8224)(RS-16-153) Project stage: Acceptance Review ML16280A4022016-10-0606 October 2016 License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Project stage: Supplement RS-16-201, License Amendment Request- Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition2016-10-20020 October 2016 License Amendment Request- Proposed Changes to Technical Specifications Section 5.0 Administrative Controls for Permanently Defueled Condition Project stage: Request L-2016-294, Acceptance Review Concerning Changes to Emergency Plan for Permanently Defueled Condition (CAC No. MF8279)(RS-16-143)(L-LL-2016-29478)2016-11-0303 November 2016 Acceptance Review Concerning Changes to Emergency Plan for Permanently Defueled Condition (CAC No. MF8279)(RS-16-143)(L-LL-2016-29478) Project stage: Acceptance Review ML16308A3532016-11-0303 November 2016 Acceptance Review Concerning Changes to Emergency Plan for Permanently Defueled Condition (CAC No. MF8279)(RS-16-143)(L-LL-2016-29478) Project stage: Acceptance Review ML16308A4702016-11-0303 November 2016 Co., LLC, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Request RS-16-228, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition2016-11-17017 November 2016 License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition Project stage: Request ML16355A4042016-12-27027 December 2016 FRN, Notice of Withdrawal (CAC No. MF8224) (RS-16-153) Project stage: Other NRC-2016-0207, FRN, Notice of Withdrawal (CAC No. MF8224) (RS-16-153)2016-12-27027 December 2016 FRN, Notice of Withdrawal (CAC No. MF8224) (RS-16-153) Project stage: Other ML16356A0892016-12-27027 December 2016 FRN, Notice of Withdrawal (CAC No. MF8279) (RS-16-143) Project stage: Other ML16354A1422016-12-27027 December 2016 Withdrawal of Amendment Requests Regarding Decommissioning Licensing Actions (CAC Nos. MF8224 and MF8279) (RS-16-153 and RS-16-143) Project stage: Withdrawal NRC-2017-0014, FRN: Clinton, Quad Cities, & Oyster Creek - FRN Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF2017-01-23023 January 2017 FRN: Clinton, Quad Cities, & Oyster Creek - FRN Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF8275 Project stage: Approval ML16257A4962017-01-23023 January 2017 FRN: Clinton, Quad Cities, & Oyster Creek - FRN Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF8275 Project stage: Approval ML16257A4802017-01-23023 January 2017 Letter Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF8275 - MF8278) Project stage: Approval 2016-06-20
[Table View] |
Text
ExeLon G Warr Winfield Road Warr Winfield IL 60555 www.exeloncorp.com RS-16-161
10 CFR 50.90 August 11, 2016 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Request for NRC to Suspend Review of License Amendment Requests for Clinton Power Station, Unit 1
References:
- 1. Letter from P. R. Simpson (Exelon Generation Company, LLC) to U. S. NRC, "License Amendment Request to Revise Technical Specification Section 5.5.13, 'Primary Containment Leakage Rate Testing Program', for Permanent Extension of Type A and Type C Leak Rate Test Frequencies," dated January 25, 2016 (ML16025A182)
- 2. Letter from P. R. Simpson (Exelon Generation Company, LLC) to U. S. NRC, "License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-484, Revision 0, 'Use of TS 3.10.1 for Scram Time Testing Activities'," dated April 4, 2016 (ML16095A285)
- 3. Letter from M. P. Gallagher (Exelon Generation Company, LLC) to U. S.
NRC, "Certification of Permanent Cessation of Power Operations," dated June 20, 2016 (ML16172A137)
In Reference 1, Exelon Generation Company, LLC (EGC) requested an amendment to Facility Operating License (FOL) No. NPF-62 for Clinton Power Station (CPS), Unit 1. The proposed amendment is a request to revise Technical Specification (TS) 5.5.13, "Primary Containment Leakage Rate Testing Program" to allow for the permanent extension of the Type A Integrated Leak Rate Testing (ILRT) and Type C Leak Rate Testing frequencies.
In Reference 2, EGC requested an amendment to FOL No. NPF-62 for CPS, Unit 1. The proposed amendment is a request to revise TS Limiting Condition for Operation (LCO) 3.10.1, "Inservice Leak and Hydrostatic Testing Operation," and the associated TS Bases, to expand its scope to include operations in which reactor coolant system temperature exceeds 200°F as a
August 11, 2016 U. S. Nuclear Regulatory Commission Page 2 consequence of maintaining reactor pressure for inservice leak and hydrostatic testing or as a consequence of maintaining reactor pressure for scram time testing initiated in conjunction with an inservice leak or hydrostatic test when the initial test conditions are below 200°F, while considering operational conditions to be in Mode 4.
In Reference 3, EGC notified the NRC that it had decided to cease operations at CPS, Unit 1 by June 1, 2017. Given this notification, EGC is evaluating the need for the Reference 1 and Reference 2 license amendment requests (LARs). Therefore, EGC requests that the NRC temporarily suspend its review of the two LARs until EGC is able to complete this evaluation.
EGC expects that this evaluation will be completed prior to the end of 2016.
EGC is notifying the State of Illinois of this request for a temporary suspension of NRC review of the Reference 1 and Reference 2 LARs by transmitting a copy of this letter to the designated State Official.
There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Mr. John L. Schrage at (630) 657-2821.
Patrick R. Simpson Manager Licensing Exelon Generation Company, LLC cc:
NRC Regional Administrator, Region III NRC Senior Resident Inspector Clinton Power Station Illinois Emergency Management Agency Division of Nuclear Safety