RS-13-022, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)

From kanterella
Jump to navigation Jump to search
Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML13060A127
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 02/28/2013
From: Jesse M
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-049, RS-13-022
Download: ML13060A127 (75)


Text

1 Exelon Generatione, Order No. EA-12-049 RS-13-022 February 28, 2013 u.s. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)

References:

1. NRC Order Number EA-12-049, "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" dated March 12,2012
2. NRC Interim Staff Guidance JLD-ISG-2012-01, "Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," Revision 0, dated August 29, 2012
3. NEI 12-06, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide,"

Revision 0, dated August, 2012

4. Exelon Generation Company, LLC's Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), dated October 25, 2012 On March 12, 2012, the Nuclear Regulatory Commission ("NRC" or "Commission") issued an order (Reference 1) to Exelon Generation Company, LLC (EGC). Reference 1 was immediately effective and directs EGC to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in of Reference 1.

U.S. Nuclear Regulatory Commission Integrated Plan Report to EA-12-049 February 28, 2013 Page 2 Reference 1 requires submission of an Overall Integrated Plan by February 28, 2013. The NRC Interim Staff Guidance (ISG) (Reference 2) was issued August 29, 2012 which endorses industry guidance document NEI 12-06, Revision 0 (Reference 3) with clarifications and exceptions identified in Reference 2. Reference 3 provides direction regarding the content of this Overall Integrated Plan.

Reference 4 provided the EGC initial status report regarding mitigation strategies, as required by Reference 1.

The purpose of this letter is to provide the Overall Integrated Plan pursuant to Section IV, Condition C.1 , of Reference 1. This letter confirms EGC has received Reference 2 and has an Overall Integrated Plan developed in accordance with the guidance for defining and deploying strategies that will enhance the ability to cope with conditions resulting from beyond-design-basis external events.

The information in the enclosure provides the Limerick Generating Station, Units 1 and 2 Overall Integrated Plan for mitigation strategies pursuant to Reference 3. The enclosed Integrated Plan is based on conceptual design information. Final design details and associated procedure guidance, as well as any revisions to the information contained in the Enclosure, will be provided in the 6-month Integrated Plan updates required by Reference 1.

This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact David P. Helker at 610-765-5525.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 28th day of February 2013.

~.:::.......--~~~

Michael D. Jess Director - Licen ing egulatory Affairs Exelon Generatio Company, LLC

Enclosure:

1. Limerick Generating Station, Units 1 and 2 Mitigation Strategies (MS) Overall Integrated Plan cc: Director, Office of Nuclear Reactor Regulation NRC Regional Administrator - Region I NRC Senior Resident Inspector - Limerick Generating Station, Units 1 and 2 NRC Project Manager, NRR - Limerick Generating Station, Units 1 and 2 Mr. Robert J. Fretz, Jr, NRRIJLD/PMB, NRC Mr. Robert L. Dennig, NRRIDSS/SCVB, NRC Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources R. R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Department of Environmental Protection, Bureau of Radiation Protection

Enclosure 1 Limerick Generating Station, Units 1 and 2 Mitigation Strategies (MS)

Overall Integrated Plan (72 pages)

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan General Integrated Plan Elements Site: Limerick Generating Station (LGS)

Determine Applicable Input the hazards applicable to the site; seismic, external Extreme External Hazard flood, high winds, snow, ice, cold, high temps.

Describe how NEI 12-06 sections 5 - 9 were applied and Ref: NEI 12-06 section 4.0 -9.0 the basis for why the plant screened out for certain hazards.

JLD-ISG-2012-01 section 1.0 Seismic events, except soil liquefaction; external flood (due to a Local Intense Precipitation), severe storms with high winds; snow, ice and extreme cold; and high temperatures were detennined to be applicable Extreme External Hazards for Limerick Generating Station (LGS) per the guidance of NEI 12-06 and are as follows:

Seismic:

Per the Updated Final Safety Analysis Report (UFSAR)

Section 2.5, the seismic criteria for LGS include two design basis earthquake spectra: Operating Basis Earthquake (aBE) and the Design Basis Earthquake (DBE) (Safe Shutdown Earthquake). The DBE and the aBE are 0.15g and 0.075g, respectively. These values constitute the design basis of LGS. Per the UFSAR, the buildings and equipment that have been designed for seismic loads include, but are not limited to, the Reactor Enclosure, Control Structure, Diesel Generator Enclosures, Spray Pond Pump House, High Pressure Coolant Injection, and Reactor Core Isolation Cooling. Per NEI 12-06, all sites will consider the seismic hazard. (References 1, 2)

Soil liquefaction was reviewed for Limerick Generating Station. Based on the UFSAR, the soil at the seismic Category I spray pond was analyzed for liquefaction potential. The soils at other seismic Category I facilities were not analyzed since these soils are not saturated and the potential for becoming saturated is negligible. Based on the UFSAR, the spray pond does not have a soil liquefaction concern.

Therefore, Limerick site screens in for an assessment of seismic hazards, as required for all plants per NEI 12-06.

Flooding:

As discussed in the UFSAR, the design basis flood level of Page 1 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan the Schuylkill River at the site is 207 feet, including wave activity. The shortest horizontal distance from the contour at elevation 207 feet to the nearest safety-related structure is approximately 200 feet. Grade level is no lower than elevation 215' at any of the safety-related structures, and none of the safety-related structures has exterior openings below elevation 217'. Therefore, the safety-related structures are secure from Schuylkill River flooding and no special provisions for flood protection are necessary.

Therefore, Limerick is built above the design basis flood level and is considered "dry" by the NEI guidance and dry sites are not required to evaluate flood-induced challenges.

The other area that was reviewed for effects of flooding was the spray pond. Based on the UFSAR, the maximum flood level at the spray pond is 254.9 feet. The lowest elevation for the spray pond pump house is 268 feet. Therefore, the spray pond pump house does not have a flooding concern.

It should also be noted the Limerick Station has been analyzed for a Local Intense Precipitation (LIP, transient flood). The affects of a LIP are analyzed in calculation NPB-1l7. Based on the results and due to the anal yzed flood planes for Limerick, the station will need to ensure storage and deployment of equipment is not impeded due to a transient flood (LIP).

Thus the Limerick site screens in for an assessment for storage and transportation of equipment during a Local Intense Precipitation for external flooding.

Severe Storms with High Winds:

Limerick Generating Station is located at approximately 40°13'26" north latitude and 75°35'16" west longitude. Per Figure 7-1 of NEI 12-06, Limerick is susceptible to hurricanes due to location. Per Figure 7 -1, peak wind gusts at Limerick will be between 130 and 140 mph. Also, according to the UFSAR and Figure 7 -2 of NEI 12-06, Limerick Generating Station is susceptible to Tornado induced winds and is classified as region 2 with maximum wind speeds of 170 mph. It should be noted that all Category I classified structures are able to withstand a rotational wind velocity of 300 mph, as given in the UFSAR. Also, safety-related structures have been assessed for tornado missiles and determined to be acceptable, per the UFSAR. The challenges produced by a tornado event would be debris in the way of the FLEX deployment path.

Page 2 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Therefore, based on the above, Limerick Generating Station screens in for an assessment of Severe Storms with High Winds for both hurricanes and tornados.

Snow, Ice and Extreme Cold:

The guidelines provided in NEI 12-06 (Section 8.2.1) generally include the need to consider extreme snowfall and low temperatures at plant sites above the 35th parallel. The Limerick Generating Station site is located above the 35th parallel and thus the capability to address impedances caused by extreme snowfall need to be provided. Per the UFSAR, the temperature in the region of Limerick Generating Station site rarely exceeds lOO°F or drops below O°F.

Also, per Figure 8-2 of the NEI 12-06, LGS is classified as a Level 4 Ice Severity. A Level 4 Severity for ice means Severe Damage to power lines andlor existence of large amounts of ice.

Also, the spray pond (Ultimate Heat Sink (UHS) at LGS) would need to be reviewed for icing conditions. The spray pond, per the UFSAR, is designed to operate during icing conditions. Return flow to the pond is initially directed to the winter bypasses, which inject the warm return water directly to the pond volume. The bypasses are directed toward the ends of the pond to allow the return water to circulate and mix with the pond volume, and avoid hydraulic short-circuiting. The increasingly warmer pond water causes any ice layer present on the pond surface to melt. Once a hole is formed in the ice layer, a return path for spray water is available, and the spray networks may be used as water temperature dictates.

During beyond-design-basis external events (BDBEE) conditions, there would be no warm water return to the spray pond. Therefore, the water source connections will need to be designed to ensure the water source will be available during cold water conditions.

Since Limerick Generating Station is Level 4 Severity, an assessment for impact of snow, ice, and extreme cold will need to be completed for storage and deployment of the FLEX equipment.

Page 3 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan High Temperatures:

NEI 12-06 states that all sites must consider high temperatures. The issues here are similar to cold and ice in that the equipment must be sufficiently protected from the high temperatures such that it will still be able to function when necessary. Per the UFSAR, the temperature in the region of Limerick Generating Station site rarely exceeds 100°F or drops below O°F. Per the UFSAR, the maximum temperature measured in the local area (Philadelphia) from 1874 to 1976 was 106°F in August, 1908.

Therefore, Limerick Generating Station must assess high temperatures protection and deployment of FLEX equipment.

Reference(s):

1. LGS UFSAR, Revision 16, September 2012.
2. NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 0, August 2012.
3. NPB-117, Potential Flooding of Plant Areas - PMP, CT Dike Failure, CW Pipe Break, Revision 6.

Key Site assumptions to Provide key assumptions associated with implementation of implement NEI 12*06 FLEX Strategies:

strategies.

  • Flood and seismic re-evaluations pursuant to the 10 Ref: NEI 12-06 section 3.2.1 CFR 50.54(f) letter of March 12,2012 are not completed and therefore not assumed in this submittal.

As the re-evaluations are completed, appropriate issues will be entered into the corrective action system and addressed on a schedule commensurate with other licensing bases changes.

  • Additional staff resources are assumed to begin arriving at hour 6 and fully staffed by 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
  • DC systems are available.
  • AC and DC distribution systems are available.
  • Plant initial response is the same as SBO.
  • No single failure of SSC assumed (beyond the initial failures that define the extended loss of alternating current (ac) power (ELAP)lloss of normal access to the ultimate heat sink (LUHS) scenario in NEI 12-06).

(Reference 3)

Page 4 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan

  • Primary and secondary storage locations have not been selected; once locations are finalized, implementation routes will be defined.
  • Storage locations will be chosen in order to support the event timeline.
  • BWROG Emergency Procedure and Severe Accident Guidelines, Revision 3, containing items such as guidance to allow early venting and to maintain steam driven injection equipment available during emergency depressurization, is approved and implemented in time to support compliance date.
  • Maximum environmental room temperatures for habitability or equipment availability are based on NUMARC 87-00 Reference 1 guidance and Limerick Specification for Environmental Service Conditions, Reference 2.
  • This plan defines strategies capable of mitigating a simultaneous loss of all alternating current (ac) power and loss of normal access to the ultimate heat sink resulting from a beyond-design-basis event by providing adequate capability to maintain or restore core cooling, containment, and Spent Fuel Pool (SFP) cooling capabilities at all units on a site. Though specific strategies are being developed, due to the inability to anticipate all possible scenarios, the strategies are also diverse and flexible to encompass a wide range of possible conditions. These pre-planned strategies developed to protect the public health and safety will be incorporated into the station emergency operating procedures (EOP) in accordance with established EOP change processes, and their impact to the design basis capabilities of the unit evaluated under 10 CFR 50.59. The plant Technical Specifications contain the limiting conditions for normal unit operations to ensure that design safety features are available to respond to a design basis accident and direct the required actions to be taken when the limiting conditions are not met. The result of the beyond-design-basis event may place the plant in a condition where it cannot comply with certain Technical Specifications, and, as such, may warrant invocation of 10 CFR 50.54(x) and/or 10 CPR 73.55(p).

Reference( s):

1. NUMARC 87-00, Guidelines and Technical Bases for NUMARC Initiatives Addressing Station Page 5 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Blackout at Light Water Reactors, Revision 1, May 1993.

2. M-I7I, Specification for Environmental Service Conditions, Limerick Generating Station, Units 1 &

2, Revision 16.

3. NEI 12-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 0, August 2012.
4. NEI 12-01, Guideline for Assessing Beyond Design Basis Accident Response Staffing and Communications Capabilities, Revision 0, April 2012.
5. BWR Owners' Group, Emergency Procedure and Severe Accident Guidelines, Revision 3, February 2013.
6. Task Interface Agreement (TIA) 2004-04, "Acceptability of Proceduralized Departures from Technical Specifications (TSs) Requirements at the Surry Power Station," (TAC Nos. MC4331 and MC4332)," dated September 12,2006. (Accession No. ML060590273)

Extent to which the Include a description of any alternatives to the guidance, guidance, JLD-ISG-2012-01 and provide a milestone schedule of planned action.

and NEI 12-06, are being followed. Identify any Full conformance with JLD-ISG-20I2-01 and NEI 12-06 is deviations to JLD-ISG-2012- expected with no deviations.

01 and NEI 12-06.

Ref: JLD-ISG-2012-01 NEI 12-06 13.1 Provide a sequence of events Strateg ies that have a time constraint to be successful and identify any time should be identified with a technical basis and a constraint required for justification provided that the time can reasonably be met success including the (jor example, a walk through of deployment).

technical basis for the time constraint. Describe in detail in this section the technical basis for the time constraint identified on the sequence of events time line Ref: NEI 12-06 section 3.2.1.7 Attachment lA JLD-ISG-2012-01 section 2.1 Issuance of BWROG document NEDC-3377IP, "GEH Evaluation of FLEX Implementation Guidelines" on January 31, 2013 did not allow sufficient time to perform the analysis of the deviations between Exelon's engineering analyses and the analyses contained in the BWROG document prior to commencing regulatory reviews of the Page 60f72

Limerick Generating Station, Units I and 2 Mitigation Strategies Integrated Plan Integrated Plan. This analysis is expected to be completed, documented on Attachment IB, and provided to the NRC in the August 2013 6-month status update.

See attached sequence of events timeline (Attachment IA).

Spent Fuel Pool (SFP) makeup is not a time constraint with the initial condition of Mode 1 at 100% power, since the worst case fuel pool heat load conditions only exist during a refueling outage. Under non-outage conditions, the maximum SFP heat load is 10.4 x 106 BTU/hour. Loss of SFP cooling with this heat load and an initial SFP temperature of 140 degrees F results in a time to boil of 10.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, and 138 hours0.0016 days <br />0.0383 hours <br />2.281746e-4 weeks <br />5.2509e-5 months <br /> to the top of active fuel. Therefore, completing the equipment line-up for initiating SFP makeup at 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> into the event ensures adequate cooling of the spent fuel is maintained.

The worst case SFP heat load during an outage is 50.4 x 106 BTU/hour. Loss of SFP cooling with this heat load and an initial SFP temperature of 140 degrees F results in a time to boil of 2.1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> to the top of active fuel.

With the entire core being located in the SFP, manpower resources normally allocated to aligning core cooling along with the Operations outage shift manpower can be allocated to aligning SFP makeup which ensures the system alignment can be established within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Initiation at 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> into the event ensures adequate cooling of the spent fuel is maintained.

Initial calculations were used to determine the fuel pool timelines. Formal calculations will be performed to validate this information during development of the spent fuel pool cooling strategy detailed design, and will be provided in a future 6-month update.

Reference(s):

1. NEDC-33771P, GEH Evaluation of FLEX Implementation Guidelines, Revision 1, January 2013.
2. Passport AR 1468452-02, Determine Times and Levels for the Spent Fuel Pool in Support of FLEX Integrated Plan Submittal for Fukushima During an Extended Loss of AC Power Event.

The times to complete actions in the Events Timeline are based on operating jUdgment, the conceptual designs, and Page 7 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan the current supporting analyses. The final timeline will be time validated once detailed designs are completed and procedures are developed. The results will be provided in a future 6-month update.

Discussion of Time Constraints Technical Basis Action Item 4 HPCI is required to be shutdown within 10 minutes to prevent reactor level from exceeding +54". (Reference 1, E-1 Bases)

Action Item 11 Within an hour of initiation of the event, the Control Room crew should be able to assess the event and declare an ELAP. Timely declaration will enable entry into ELAP procedures which will require extended DC load shedding and setup of portable FLEX equipment to respond to the event.

Action Item 13 Input to the CFLUD analysis for RCIC room temperature analysis. Natural ventilation needs to be established within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> to maintain RCIC room temperature below the environmental qualification (EQ) limit for the equipment in the RCIC room. (Reference 2)

Action Item 14 Existing SBO Guidance, E-l, requires that these loads are shed within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. DC analysis shows that by stripping the existing E-1 loads within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and performing the additional load shedding to maximize battery life during the ELAP, the station batteries can provide power for approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />. (References 3, 4)

Action Item 15 Additional load shedding requirements have been identified to extend battery life to respond to the ELAP. These loads can be shed in 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after event initiation and are an input to the DCSDM analysis. (Reference 4)

Action Item 17 Venting of the containment will be initiated such that peak Suppression Pool temperature remains below the maximum allowed for RCIC operation. Preliminary analysis shows Page 8 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan that containment venting through the Hardened Vent (EA-12-050 requirement) at approximately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, will maintain Suppression Pool temperature at or below 2360 F. A BWROG review of RCIC operation with elevated suction temperatures was conducted by GE Hitachi following the events at Fukushima-Daiichi. The review indicated RCIC could continue to operate up to approximately 2300 F suction temperature. Operation of RCIC above 230° F is currently being evaluated by General Electric and the BWROG (Reference 9). Additional work will be performed during detailed design development to ensure Suppression Pool temperature will support RCIC operation, in accordance with approved BWROG analysis, throughout the event. (References 5, 6, 7, 11)

Action Item 18 Additional load shedding requirements have been identified to extend battery life to respond to the ELAP. This evaluation indicates that the limiting battery life is approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />. Portable generators need to provide power to the battery chargers prior to 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />. (Reference 4)

Action Item 20 Spent Fuel Pool (SFP) make-up is not a time constraint with the initial condition of Mode 1 at 100% power, since the worst case fuel pool heat load conditions only exist during a refueling outage. Under non-outage conditions, the maximum SFP heat load is 10.4 x 106 BTU/hour. Loss of SFP cooling with this heat load and an initial SFP temperature of 140 degrees F results in a time to boil of 10.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, and 138 hours0.0016 days <br />0.0383 hours <br />2.281746e-4 weeks <br />5.2509e-5 months <br /> to the top of active fuel (TAF).

Therefore completing the equipment line-up for initiating SFP make-up at 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> into the event provides margin to degraded radiological conditions and T AF. (Reference 9)

Action Item 21 Preliminary analysis shows that with containment venting in progress, makeup to the Suppression Pool will be required at approximately 65 hours7.523148e-4 days <br />0.0181 hours <br />1.074735e-4 weeks <br />2.47325e-5 months <br /> from the beginning of the event to ensure suppression pool level remains above 13.5 feet.

This level was chosen to agree with procedure T -102, Primary Containment Control, Step SPIL-5, which is above the downcomer openings and is the level where shutdown of RCIC is directed due to NPSH concerns, if it is not required to maintain adequate core cooling. (References 5, 8)

Page 9 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Reference(s):

1. E-l Bases, Loss of All AC Power (Station Blackout), Revision 7.
2. LM-0689, RCIC Pump Room Temps for Extended Loss of AC Power - Post Fukushima Scenario, Revision O.
3. E-l, Loss of All AC Power (Station Blackout),

Revision 43.

4. Passport AR 1468452, Evaluation 01, Battery Coping Times during ELAP with Extended Load Shedding.
5. LG-MISC-012, MAAP Analysis to Support FLEX Initial Strategy, Revision 1.
6. RS-13-113, Exelon Generation Company, LLC's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Hardened Containment Vents (Order EA-12-050), 2/28/2013.
7. BWROG ReportOOOO-0143-0382-RI, BWROG RCIC System Operation in Prolonged Station Blackout - Feasibility Study, March 2012.
8. T-102 Bases, Primary Containment Control- Bases, Revision 24.
9. Passport AR 01468452, Evaluation 02, SFP Evaluation.
10. NEDC-33771P, GEH Evaluation of FLEX Implementation Guidelines, Revision 1, January 2013.
11. BWROG Report 0000-0155-1545-RO, BWROG RCIC Pump and Turbine Durability Evaluation -

Pinch Point Study, currently in approval process.

Page 10 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Identify how strategies will Describe how the strategies will be deployed in all modes.

be deployed in all modes.

Deployment of FLEX is expected for all modes of Ref: NEI 12-06 section 13.1.6 operation. Transportation routes will be developed from the equipment storage area to the FLEX staging areas. An administrative program will be developed to ensure pathways remain clear or compensatory actions will be implemented to ensure all strategies can be deployed during all modes of operation. This administrative program will also ensure the strategies can be implemented in all modes by maintaining the portable FLEX equipment available to be deployed during all modes.

Identification of storage locations and creation of the administrative program are open items. Closure of these items will be documented in a 6-month update.

Provide a milestone The dates specifically required by the order are obligated or schedule. This schedule committed dates. Other dates are planned dates subject to should include: change. Updates will be provided in the periodic (six

  • Modifications timeline month) status reports.

0 Phase 1 Modifications See attached milestone schedule, Attachment 2.

0 Phase 2 Modifications Exelon Generation Company, LLC (Exelon) fully expects to 0 Phase 3 meet the site implementation/compliance dates provided in Modifications Order EA-12-049 with no exceptions. Any changes or

  • Procedure guidance additions to the planned interim milestone dates will be development complete provided in a future 6-month update.

0 Strategies 0 Maintenance

  • Storage plan (reasonable protection)
  • Staffing analysis completion
  • FLEX equipment acquisition timeline
  • Training completion for the strategies
  • Regional Response Centers operational Ref: NEI 12-06 section 13.1 Page 11 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Identify how the Provide a description of the programmatic controls programmatic controls will equipment protection, storage and deployment and be met. equipment quality. See section 11 in NEI 12-06. Storage of equipment, 11.3, will be documented in later sections of this Ref: NEI 12-06 section 11 template and need not be included in this section.

JLD-ISG-2012-01 section 6.0 See section 6.0 of lLD-ISG-2012-01.

Limerick Generating Station will implement an administrative program for FLEX to establish responsibilities, and testing & maintenance requirements. A plant system designation will be assigned to FLEX equipment which requires configuration controls associated with systems. This will establish responsibilities, maintenance and testing requirements for all components associated with FLEX. Unique identification numbers will be assigned to all components added to the FLEX plant system. Equipment associated with these strategies will be procured as commercial equipment with design, storage, maintenance, testing, and configuration control as outlined in JLD-ISG-20l2-0l section 6 and NEI 12-06 section 11.

Installed structures, systems, and components pursuant to 10CFR50.63(a) will continue to meet the augmented quality guidelines of Regulatory Guide 1.155, Station Blackout.

Standard industry PMs will be developed to establish maintenance and testing frequencies based on type of equipment and will be within EPRI guidelines. Testing procedures will be developed based on the industry PM templates and Exelon standards.

Describe training plan List training plans for affected organizations or describe the plan for training development Training materials for FLEX will be developed for all station staff involved in implementing FLEX strategies. For accredited training programs, the Systematic Approach to Training, SAT, will be used to determine training needs. For other station staff, a training overview will be developed per change management plan.

Page 12 of 72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Describe Regional Response Limerick Generating Station has contractual agreements in Center plan place with the Strategic Alliance for FLEX Emergency Response (SAFER).

The industry will establish two (2) Regional Response Centers (RRC) to support utilities during beyond design basis events. Each RRC will hold five (5) sets of equipment, four (4) of which will be able to be fully deployed when requested, the fifth set will have equipment in a maintenance cycle. Equipment will be moved from a RRC to a local Assembly Area, established by the SAFER team and the utility. Communications will be established between the affected nuclear site and the SAFER team and required equipment moved to the site as needed. First arriving equipment, as established during development of the nuclear site's playbook, will be delivered to the site within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from the initial request.

Reference(s):

1. NEI Workshop presentation, Strategic Alliance for FLEX Emergency Response (SAFER), Washington, DC, 11127112.
2. Request for Proposal, RFP-20480, Regional Response Center(s), United States Nuclear Industry, June 8, 2012.

Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan.

Page 13 of 72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Core Cooling Determine Baseline coping capability with installed coping l modifications not including FLEX modifications, utilizing methods described in Table 3-1 of NEI 12-06:

  • RCICIHPCIII C
  • Depressurize RPV for injection with portable injection source
  • Sustained Water Source BWR Installed Equipment Phase 1:

Provide a general description of the coping strategies using installed equipment including modifications that are proposed to maintain core cooling. Identify methods (RCICIHPCIIIC)and strategy(ies) utilized to achieve this coping time.

  • RCIC Injection will maintain RPV inventory.
  • SR Vs will be used to control RPV pressure. RPV pressure will be lowered using SR Vs to allow for injection with portable injection source in Phase 2.
  • Makeup to the RPV will be from the Suppression Pool via RCIC.

At the initiation of the event the operators will enter the TRIPs (Transient Response Implementation Procedures) and E-l (Loss of All AC Power (Station Blackout)). The FLEX Support Guidelines will be entered when there has been an ELAP, including all eight on-site Emergency Diesel Generators, with confirmation of no imminent return of any of these power sources to service.

Reactor Level Control Initial RPV water level control will be accomplished using the RCIC System, which is independent of AC power. The RCIC System consists of a steam-driven turbine-pump unit and associated valves and piping capable of delivering makeup water to the reactor vessel. The steam supply to the RCIC turbine comes from the "B" main steam line between the reactor vessel and inboard MSIV and exhausts to the suppression pool. The RCIC pump can take suction from the condensate storage tank (CST) or from the suppression pool. The RCIC pump discharges to the feedwater line. The makeup water is delivered into the reactor vessel through a connection to the "B" feed water line and is distributed within the reactor vessel through the feedwater spargers.

Cooling water for the RCIC turbine lube oil cooler and barometric condenser is supplied from the discharge of the pump. If the CST is unavailable, suction will be transferred to the suppression pool. It is expected that RCIC would remain a viable source as long as 125 VDC control power is available for system control and 250 VDC is available for control of valves, the Barometric Condenser Vacuum Pump and Condensate Pump. There is procedural direction to operate RCIC without DC power, which is contained in TSG-4.1. (References 2, 3)

J Coping modifications consist of modifications installed to increase initial coping time, i.e., generators to preserve vital instruments or increase operating time on battery powered equipment.

Page 14 of 72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Venting of the containment will be initiated to maiptain peak Suppression Pool temperature below the maximum allowed for RCIC operation. A BWROG Study indicates that RCIC will remain functional as long as Suppression Pool temperature can be maintained less than approximately 2300 F (Reference 1). Operation of RCIC above 230 0 F is currently being evaluated by General Electric and the BWROG (Reference 9). The preliminary analysis performed for strategy development indicated a maximum Suppression Pool temperature of 236 0 F with containment venting (Reference 8). Additional work will be performed during detailed design development to ensure Suppression Pool temperature will support RCIC operation in accordance with approved BWROG analysis, throughout the event.

Reactor Pressure Control The SBO event will cause the RPV to be isolated from the main condenser. Pressure in the RPV will be controlled by automatic and then manual actuation of the main steam relief valves (SRVs).

SRV discharge is piped to the suppression pool. Each ofthe five relief valves provided for automatic depressurization (ADS) is equipped with an accumulator and check valve arrangement.

These accumulators are provided to ensure that the valves can be held open following failure of the nitrogen supply to the accumulators.

The Primary Containment Instrument Gas (PCIG) system provides a safety-related gas supply for the ADS valves in the event that the non-safety related normal PCIG supply is unavailable. Two seismic Category 1 gas supplies (nitrogen bottles) are provided to assure the availability of the ADS valves for long-term operation. One set of gas bottles serves three ADS valves; another set serves the other two ADS valves. These long-term gas supplies have been designed to remain operable following a loss of offsite power. Either set of bottles will supply the ADS valves with sufficient nitrogen for seven days of operation and are connected at all times during normal operation.

Cold Shutdown and Refueling When in Cold Shutdown and Refueling, many variables impact the ability to cool the core. In the event of an ELAP during these Modes, installed plant systems cannot be relied upon to cool the core; thus, transition to Phase 2 will begin immediately. All efforts will be made to expeditiously provide core cooling and minimize heat-up and repressurization. Exelon has a program in place to determine the time to boil for all conditions during shutdown periods (Reference 7, 10). This time will be used to determine the time required to complete transition to Phase 2.

To accommodate the activities of vessel disassembly and refueling, water levels in the reactor vessel and the reactor cavity are often changed. The most limiting condition is the case in which the reactor head is removed and water level in the vessel is at or below the reactor vessel flange. If an ELAPILUHS occurs during this condition then (depending on the time after shutdown) boiling in the core may occur quite rapidly.

Deploying and implementing portable FLEX pumps to supply injection flow must commence immediately from the time of the event. This should be plausible because more personnel are on site durin outa es to provide the necessary resources. Strate ies for makeu water include Page 15 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan deployment of a FLEX pump to take suction from the Spray Pond as described in the Phase 2 Core Cooling section.

Guidance will be provided to ensure that sufficient area is available for deployment and that haul paths remain accessible without interference from outage equipment during refueling outages.

Reference(s):

1. BWROG Report 0000-0 143-0382-R 1, BWROG RCIC System Operation in Prolonged Station Blackout - Feasibility Study, March 2012.
2. LGS UFSAR, Revision 16, September 2012.
3. TSG-4.1, Operational Contingency Guidelines, Revision 13.
4. E-1 Bases, Loss of All AC Power (Station Blackout), Revision 7.
5. T-101, RPV Control, Sheet 1 of 1, Revision 21.
6. E-l, Loss of All AC Power (Station Blackout), Revision 43.
7. OP-AA-108-117 -1001, Spent Fuel Storage Pools Heat-up Rate with Loss of Normal Cooling, Revision O.
8. LG-MISC-012, MAAP Analysis to Support FLEX Initial Strategy, Revision 1.
9. BWROG RCIC Pump and Turbine Durability Evaluation - Pinch Point Study, 0000-0155-1545-XX - currently in approval process
10. OU-AA-103, Shutdown Safety Management Program, Revision 12.

Details:

Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation I Strategies I Guidelines T-101, RPV Control provides direction to use RCIC and SRVs.

E-1, SBO procedure will be modified with a condition to go to the extended SBO guidance.

LGS will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs.

Identify modifications None.

Page 16 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Key Reactor Parameters List instrumentation credited for this coping evaluatioll.

RPV Water Level- LI-42-*R604 (Wide Range), LI-42-*R606A, B, C (Narrow Range), LI-42-*R61O (Fuel Zone)

RPV Pressure - PI-42-*R605

  • indicates unit designator, i.e., I for LGS Unit 1, 2 for LGS Unit 2 The evaluation of the FLEX strategy for LGS may identify additional parameters that are needed in order to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. Any differences will be communicated in a future 6-month update following the identification of additional parameters.

Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan.

Page 17 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Core Cooling BWR Portable Equipment Phase 2:

Provide a generaL description of the coping strategies using on-site portabLe equipment including modifications that are proposed to maintain core cooling. Identify methods (RCICIHPCIIIC)and strategy(ies) utilized to achieve this coping time.

RCIC will continue to maintain RPV inventory. FLEX pumps will be connected and available to maintain RPV inventory if needed. The current strategy is to utilize the FLEX pumps to maintain suppression pool level such that RCIC NPSH requirements are met.

SRVs will continue to be used to control RPV pressure.

RPV Level Control RCIC will continue to maintain RPV inventory. Re-energizing 480V AC load centers and battery chargers will ensure continued functionality of the RCIC System, by allowing control of the system from the Main Control Room, and continued operation of the system valves and the Barometric Condenser Vacuum Pump and Condensate Pump. Refer to the Safety Functions Support section of this report for a description of the 480V AC strategy.

Venting of the containment will be initiated to maintain peak Suppression Pool temperature below the maximum allowed for RCIC operation. A BWROG Study indicates that RCIC will remain functional as long as Suppression Pool temperature can be maintained less than approximately 2300 F (Reference 5). Operation of RCIC above 230 0 F is currently being evaluated by General Electric and the BWROG (Reference 6). The preliminary analysis performed for strategy development indicated a maximum Suppression Pool temperature of 236 0 F (Reference 1). Additional work will be performed during detailed design development to ensure Suppression Pool temperature will support RCIC operation in accordance with approved BWROG analysis, throughout the event.

Addition of makeup water to the Suppression Pool will ensure adequate inventory exists for RCIC suction needs.

Line-up of the FLEX pump will also allow for injection into the RPV, if RCIC experiences a failure.

The alternate water source for makeup to the Suppression Pool and RPV is the Spray Pond.

Primary Method:

Two diesel driven portable pumps (FLEX Pumps) will take suction on the Spray Pond and discharge into the common Residual Heat Removal Service Water (RHRSW) Systems, which will then be cross-connected to the respective unit's Residual Heat Removal (RHR) System.

The RHRSW system is a safety-related system designed to supply cooling water to the RHR heat exchangers of both units. The system is common to the two reactor units, and consists of two trains.

Each train services one RHR heat exchanger in each unit, and provides sufficient cooling for safe Page 18 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Core Cooling BWR Portable Equipment Phase 2:

shutdown, cooling and accident mitigation of both units. Each train has two pumps located in the spray pond pump structure, which is a seismic Category I structure. One pump supplies 100% flow to one RHR heat exchanger. During two unit operation, there are two heat exchangers (one per unit), and therefore, two of the four pumps are required for safe shutdown and accident mitigation.

The RHRSW can be cross-connected to the RHR system through existing piping. The RHRSW B train can be cross-connected to the Unit 1 RHR B train; the RHRSW A train can be cross-connected to the Unit 2 RHR A train. Injection into the Unit 1 RHR B train and the Unit 2 RHR A train will be used to provide makeup to the Suppression Pool, and will be available as a backup for RPV injection if required.

Alternate Method:

Additional diversity for RPV Injection is provided by a new RHRSW to RHR cross-tie on both units. This cross-tie will allow each train of RHRSW to provide flow to both units' A and B RHR trains in the event one of the trains is out of service.

In addition, if the Fire Water System is available, a FLEX pump could provide water from the Fire Water System to the RHR A train on Unit 1 and to the RHR B train on Unit 2 through the existing RHR to Fire Water connection. The Fire Water System would be available for all events except a seismic event.

RPV Pressure Control SRVs will continue to be used to control RPV pressure. Re-energizing 480VAC load centers and battery chargers will ensure continued functionality of the SRVs, by allowing control of the system from the Main Control Room.

Makeup of water to the Suppression Pool will ensure adequate inventory. Preliminary analysis shows that with containment venting in progress, makeup to the Suppression Pool will be required at approximately 65 hours7.523148e-4 days <br />0.0181 hours <br />1.074735e-4 weeks <br />2.47325e-5 months <br /> from the beginning of the event to ensure Suppression Pool level remains above 13.5 feet. This level was chosen to agree with procedure T-102, Primary Containment Control, Step SP/L-5, which is above the downcomer openings and is the level where shutdown of RCIC is directed due to NPSH concerns, if it is not required to maintain adequate core cooling.

(References 1, 2, 3)

Cold Shutdown and Refueling When in Cold Shutdown and Refueling, many variables exist which impact the ability to cool the core. In the event of an ELAP during these Modes, installed plant systems cannot be relied upon to cool the core; thus, transition to Phase 2 will begin immediately. All efforts will be made to expeditiously provide core cooling and minimize heat-up and repressurization. Exelon has a program in place (Reference 7, 8) to determine the time to boil for all conditions during shutdown Page 19 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Core Cooling BWR Portable Equipment Phase 2:

periods. This time will be used to determine the time required to complete transition to Phase 2.

To accommodate the activities of vessel disassembly and refueling, water levels in the reactor vessel and the reactor cavity are often changed. The most limiting condition is the case in which the reactor head is removed and water level in the vessel is at or below the reactor vessel flange. If an ELAPILUHS occurs during this condition then (depending on the time after shutdown) boiling in the core may occur quite rapidly.

Deploying and implementing portable FLEX pumps to supply injection flow must commence immediately from the time of the event. This should be plausible because more personnel are on site during outages to provide the necessary resources. Strategies for makeup water include deploying a FLEX pump to take suction from the UHS (enter applicable site water source) as described in the Phase 2 Core Cooling section.

Guidance will be provided to ensure that sufficient area is available for deployment and that haul paths remain accessible without interference ,from outage equipment during refueling outages.

Reference(s):

1. LG-MISC-012, MAAP Analysis to Support FLEX Initial Strategy, Revision 1.
2. LGS UFSAR, Revision 16, September 2012.
3. T-I02, Primary Containment Control, Revision 24.
4. T-102 Bases, Primary Containment Control- Bases, Revision 24.
5. BWROG Report 0000-0 143-0382-R 1, BWROG RCIC System Operation in Prolonged Station Blackout - Feasibility Study, March 2012.
6. BWROG Report 0000-0155-1545-XX, BWROG RCIC Pump and Turbine Durability Evaluation - Pinch Point Study, currently in approval process.
7. OP-AA-108-117 -1001, Spent Fuel Storage Pools Heat-up Rate with Loss of Normal Cooling, Revision O.
8. OU-AA-103, Shutdown Safety Management Program, Revision 12.

Details:

Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation

/ Strategies / Guidelines LGS will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs.

Page 20 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Core Cooling BWR Portable Equipment Phase 2:

Identify modifications List modifications Modify RHRSW System to allow portable pump injection, which will allow injection from Spray Pond into RHR and then into the Suppression Pool and RPV.

Provide new RHRSW to RHR cross-tie on both units.

Provide dry hydrant(s) to allow FLEX Pump to take suction from the Spray Pond under all conditions.

Key Reactor Parameters List instrumentation credited or recovered for this coping evaluation.

RPV Water Level- LI-42-*R604 (Wide Range), LI-42-*R606A, B, C (Narrow Range), LI-42-*R61O (Fuel Zone)

RPV Pressure - PI-42-*R605 The evaluation of the FLEX strategy for LGS may identify additional parameters that are needed in order to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. Any differences will be communicated in a future 6-month update following the identification of additional parameters.

Storage / Protection of Equipment:

Describe stora~e / protection plan or schedule to determine stora~e requirements Seismic List how equipment is protected or schedule to protect Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Page 21 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Core Cooling BWR Portable Equipment Phase 2:

Flooding List how equipment is protected or schedule to protect Note: if stored below current flood level.

then ensure procedures exist to move equipment prior to exceeding flood level Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Severe Storms with High List how equipment is protected or schedule to protect Winds Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Snow, Ice, and Extreme List how equipment is protected or schedule to protect Cold Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

High Temperatures List how equipment is protected or schedule to protect Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Page 22 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Core Cooling BWR Portable Equipment Phase 2:

I Deployment Conceptual Modification (Attachment 3 contains Conceptual Sketches)

Strategy Modifications Protection of connections Identify Strategy including how Identify modifications Identify how the connection is the equipment will be deployed protected to the ]Joint of use.

Storage location and structure Modify RHRSW System of The RHRSW connection is have not been decided yet. each unit to add a flange with a located inside the Spray Pond The FLEX Pumps will be quick disconnect from the Pump House, which is a safety brought to the area of the Spray FLEX Pump. related, Class I structure.

Pond Pump House. The suction of the pumps will be Security fence will be modified routed to the Spray Pond or a and/or dry hydrant(s) will be dry hydrant supplied by the installed to allow suction from Spray Pond; the discharge of the Spray Pond.

the pumps will be routed to the RHRSW System of each unit. Construct storage structure in Water from the Spray Pond will the vicinity of the Spray Pond be injected into the RHRSW Pump House to store the FLEX System and from there into the Pumps and required supporting RHR System. With injection equipment.

being supplied to the RHR System, makeup to the Suppression Pool can begin when required, and makeup to the RPV will be available if necessary.

Fuel capaci ty in the FLEX Pumps will provide for more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of operation.

After 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, fuel oil will be extracted from an Emergency Diesel Generator Storage Tank and be provided to the FLEX Pumps.

Page 23 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Core Cooling BWR Portable Equipment Phase 2:

Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan.

Page 24 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Core Cooling BWR Portable Equipment Phase 3:

Provide a general description of the coping strategies using phase 3 equipment including modifications that are proposed to maintain core cooling. Identify methods (RCIClHPCIIIC) and strategy(ies) utilized to achieve this coping time.

Phases 1 and 2 strategy will provide sufficient capability such that no additional Phase 3 strategies are required.

Phase 3 equipment for LGS includes backup portable pumps and generators. The portable pumps will be capable of providing the necessary flow and pressure as outlined in the Phase 2 response for Core Cooling & Heat Removal, RCS Inventory Control and Spent Fuel Pool Cooling. The portable generators will be capable of providing the necessary 480 volt power requirements as outlined in Phase 2 response for Safety Functions Support.

Details:

Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation I Strategies I Guidelines LGS will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs.

Additional procedural direction for RRC equipment implementation is planned for future development.

Identify modifications List modifications No additional modification required.

Key Reactor Parameters List instrumentation credited or recovered for this coping evaluation.

RPV Water Level- LI-42-*R604 (Wide Range), LI-42-*R606A, B, C (Narrow Range), LI-42-*R61O (Fuel Zone)

RPV Pressure - PI-42-*R605 The evaluation of the FLEX strategy for LGS may identify additional parameters that are needed in order to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. Any differences will be communicated in a future 6-month update following the identification of additional parameters.

Page 25 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Core Cooling BWR Portable Equipment Phase 3:

Deployment Conceptual Modification (Attachment 3 contains Conceptual Sketches)

Strategy Modifications Protection of connections Identify Strategy including how Identify modifications Identify how the connection is the equipment will be deployed protected to the point of use.

None. None. None.

Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan.

Page 26 of72

Limerick GeneratmK StatIOn, Units 1 and 2 MitigatIOn StrategIes Integrated Plan Maintain Containment Determine Baseline coping capability with installed copingZ modifications not including FLEX modifications, utilizing methods described in Table 3-1 of NEI 12-06:

  • Containment Venting or Alternate Heat Removal BWR Installed Equipment Phase 1:

Provide a general description of the coping strategies using installed equipment including modifications that are proposed to maintain core cooling. Identify methods (containment vent or alternative / Hydrogen Igniters) and strategy(ies) utilized to achieve this coping time.

At the initiation of the event the operators will enter the TRIPs (Transient Response Implementation Procedures) and E-l (Loss of All AC Power (Station Blackout>>. The FLEX Support Guidelines will be entered when there has been an Extended Loss of Offsite Power, including all eight on-site Emergency Diesel Generators, with confirmation of no imminent return of any of these power sources to service.

Containment integrity is maintained by normal design features, such as the containment isolation valves. In accordance with NEI 12-06, the containment is assumed to be isolated following the event. The SBO event will cause the RPV to be isolated from the main condenser. Pressure in the RPV will be controlled by automatic and then manual actuation of the main steam relief valves (SRVs). SRV discharge is piped to the Suppression Pool, which will cause the Containment, including the Suppression Pool to heat up and pressurize. Without the use of containment venting, there is no current method to remove heat from the containment.

The strategy at Limerick for this ELAP is to commence early containment venting at approximately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> into the event. Venting containment will serve to limit Containment pressure rise and Suppression Pool temperature rise, which will allow for long term operation of the RCIC System (Reference 1).

The containment design pressure is 55 psig. This pressure is not expected to be reached during the event as indicated by preliminary analysis, because suppression pool venting is initiated early on.

Monitoring of Drywell pressure will be available via normal plant instrumentation (References 1, 5).

When Suppression Pool temperature reaches the Unsafe Region of the HCTL, RPV emergency depressurization is required. In accordance with EPGs and per BWR Owner's Group (BWROG) guidance, TRIPs will be revised to allow termination of RPV emergency depressurization at a pressure that will allow continued RCIC operation, because steam driven RCIC is the sole means of core cooling.

2 Coping modifications consist of modifications installed to increase initial coping time, i.e., generators to preserve vital instruments or increase operating time on battery powered equipment.

Page 27 of72

Limerick GeneratInK StatIOn, Units 1 and 2 Mitigation StrategIes Integrated Plan Per the requirements of Order EA-12-0S0, the Hardened Containment Vent modification will result in the ability to operate the required components for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> without re-energizing the station batteries (Reference 3).

Preliminary analysis shows that when early containment venting is initiated at approximately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, Suppression Pool temperature does not exceed 2360 F. HCTL is reached at approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (Reference 1).

Reference(s):

1. LG-MISC-012, MAAP Analysis to Support FLEX Initial Strategy, Revision 1.
2. BWROG Report 0000-0143-0382-Rl, BWROG RCIC System Operation in Prolonged Station Blackout - Feasibility Study, March 2012.
3. RS-13-113, Exelon Generation Company, LLC's Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Hardened Containment Vents (Order EA-12-0S0),

2/28/2013.

4. T-I02, Primary Containment Control, Revision 24.

S. LGS UFSAR, Revision 16, September 2012.

Details:

Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation I Strategies I Guidelines LGS will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures andlor guidelines will support the existing symptom based command and control strategies in the current EOPs.

Identify modifications List modifications EA-12-0S0, Hardened Containment Vent Modification Page 28 of72

Limerick Generatmg StatIOn, Units 1 and 2 MitigatIOn StrategIes Integrated Plan Key Containment List instrumentation credited for this coping evaluation.

Parameters Drywell pressure - PI-42-*70-1 Suppression Pool temperature - TI-41-*02 Suppression Pool level- LIS-55-*N662B, F The evaluation of the FLEX strategy for LGS may identify additional parameters that are needed in order to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. Any differences will be communicated in a future 6-month update following the identification of additional parameters.

Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements ofNEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan.

Page 29 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Containment BWR Portable Equipment Phase 2:

Provide a general description of the coping strategies using on-site portabLe equipment including modifications that are proposed to maintain core cooling. Identify methods (containment vent or alternative /

Hydrogen Igniters)and strategy(ies) utilized to achieve this coping time.

The primary strategy for maintaining containment integrity is to continue venting the containment using the Suppression Pool hardened vent line.

Station personnel will line-up portable equipment to supply makeup to the Suppression Pool and to re-energize 480V AC load centers for the purpose of re-energizing the battery chargers.

With containment venting in progress, make-up to the Suppression Pool is required to replace inventory lost through the Suppression Pool vent. Without makeup, Suppression Pool level will reach l3.5 feet approximately 65 hours7.523148e-4 days <br />0.0181 hours <br />1.074735e-4 weeks <br />2.47325e-5 months <br /> from the beginning of the event. To ensure suppression pool level remains above l3.5 feet, make-up to the Suppression Pool will be initiated. This level was chosen to agree with procedure T-102, Primary Containment Control, Step SPIL-5, which is above the downcomer openings and is the level where shutdown of RCIC is directed due to NPSH concerns, if it is not required to maintain adequate core cooling (References 1, 2 ,3)

Suppression Pool Makeup:

Primary Method:

The RHRSW can be cross-connected to the RHR system through existing piping. The RHRSW B train can be cross-connected to the Unit 1 RHR B train; the RHRSW A train can be cross-connected to the Unit 2 RHR A train. Injection into the Unit 1 RHR B train and the Unit 2 RHR A train will be used to provide makeup to the Suppression Pool.

Two diesel driven portable pumps (FLEX Pumps) will take suction on the Spray Pond and discharge into the common Residual Heat Removal Service Water (RHRSW) Systems, which will then be cross-connected to the respective unit's Residual Heat Removal (RHR) System.

Alternate Method:

Additional diversity for Suppression Pool makeup is provided by a new RHRSW to RHR cross-tie on both units. This cross-tie will allow either train of RHRSW to provide flow to both units' A and B RHR trains in the event one of the trains is out of service.

In addition, if the Fire Water System is available, a FLEX pump could provide water from the Fire Water System to the RHR A train on Unit 1 and to the RHR B train on Unit 2 through the existing RHR to Fire Water connection. The Fire Water System would be available for all events except a seismic event.

Page 30 of72

Limerick Generatmg StatIOn, Units 1 and 2 MitigatIOn Strategies Integrated Plan Maintain Containment BWR Portable Equipment Phase 2:

Reference(s):

1. LG-MISC-012, MAAP Analysis to Support FLEX Initial Strategy, Revision 1.
2. T-102, Primary Containment Control, Revision 24.
3. T-102 Bases, Primary Containment Control- Bases, Revision 24.
4. RS-13-113, Exelon Generation Company, LLC's Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Hardened Containment Vents (Order EA-12-050), 2/28/2013.

Details:

Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation I Strategies I Guidelines LGS will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs.

Identify modifications List modifications Modify RHRSW System to allow the FLEX Pump injection, which will allow injection from Spray Pond into RHR and then into the Suppression Pool.

Key Containment List instrumentation credited or recovered for this coping evaluation.

Parameters Drywell pressure - PI-42-*70-1 Suppression Pool temperature - TI-41-*02 Suppression Pool level - LIS-55-*N662B, F The evaluation of the FLEX strategy for LGS may identify additional parameters that are needed in order to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. Any differences will be communicated in a future 6-month update following the identification of additional parameters.

Storage I Protection of Equipment:

Describe storage / protection plan or schedule to determine storage requirements Page 31 of72

Limerick Generatmg StatIOn, Units 1 and 2 MitigatIOn Strategies Integrated Plan Maintain Containment BWR Portable Equipment Phase 2:

Seismic List how equipment is protected or schedule to protect Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Flooding List how equipment is protected or schedule to protect Note: if stored below current flood level.

then ensure procedures exist to move equipment prior to exceeding flood level. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Severe Storms with High List how equipment is protected or schedule to protect Winds Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Snow, Ice, and Extreme List how equipment is protected or schedule to protect Cold Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Page 32 of72

Limerick Generatmg Station, Units 1 and 2 MitigatIOn Strategies Integrated Plan Maintain Containment BWR Portable Equipment Phase 2:

High Temperatures List how equipment is protected or schedule to protect Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Deployment Conceptual Design (Attachment 3 contains Concej!tuaJ Sketches)

Strategy Modifications Protection of connections Identify Strategy including how Identify modifications Identify how the connection is the equipment will be deployed protected to the point of use.

Storage location and structure Modify RHRSW System of The RHRSW connection is have not been decided yet. each unit to add a flange with a located inside the Spray Pond The FLEX Pumps will be quick disconnect to accept a Pump House, which is a safety brought to the area of the Spray hose connection from the related, Class I structure.

Pond Pump House. The FLEX Pump.

suction of the pumps will be routed to the Spray Pond or a Security fence will be modified dry hydrant supplied by the and/or dry hydrant(s) will be Spray Pond; the discharge of installed to allow suction from the pumps will be routed to the the Spray Pond.

RHRSW System of each unit.

Water from the Spray Pond will Construct robust structure in be injected into the RHRSW the vicinity of the Spray Pond System and from there into the Pump House to store the FLEX RHR System. With injection Pumps and required supporting being supplied to the RHR equipment.

System, makeup to the Suppression Pool can begin when required, and makeup to the RPV will be available if necessary.

Page 33 of72

Limerick Generatmg StatIOn, Units 1 and 2 MitigatIOn Strategies Integrated Plan Maintain Containment BWR Portable Equipment Phase 2:

Fuel capacity in the FLEX Pumps will provide for more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of operation.

After 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, fuel oil will be extracted from an Emergency Diesel Generator Storage Tank and be provided to the FLEX Pumps.

Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan.

Page 34 of72

Limerick Generatmg StatIon, Units 1 and 2 MitigatIOn StrategIes Integrated Plan Maintain Containment BWR Portable Equipment Phase 3:

Provide a generaL description of the coping strategies using phase 3 equipment including modifications that are proposed to maintain core cooling. Identify methods (containment vent or aLternative / Hydrogen Igniters)and strategy(ies) utilized to achieve this coping time.

It is expected that continued use of containment venting along with makeup to the Suppression Pool from the Spray Pond using the FLEX Pump(s) will provide for long-term availability of containment.

Phases 1 and 2 strategy will provide sufficient capability such that no additional Phase 3 strategies are required.

Phase 3 equipment for LGS includes backup portable pumps and generators. The portable pumps will be capable of providing the necessary flow and pressure as outline in the Phase 2 response for Core Cooling & Heat Removal, RCS Inventory Control and Spent Fuel Pool Cooling. The portable generators will be capable of providing the necessary 480 volt power requirements as outlined in Phase 2 response for Safety Functions Support.

Details:

Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation

/ Strategies / Guidelines LGS will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs.

Identify modifications List modifications None.

Key Containment List instrumentation credited or recovered/or this coping evaluation.

Parameters Drywell pressure - PI-42-*70-1 Suppression Pool temperature - TI-41-*02 Suppression Pool level - LIS-55-*N662B, F The evaluation of the FLEX strategy for LGS may identify additional parameters that are needed in order to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. Any differences will be communicated in a future 6-month update following the identification of additional parameters.

Page 35 of72

Imenc *kGeneraflI!K S taflOn, U ms It1gaf IOn Strategles t i an d 2 M** . Integrated PI an Maintain Containment BWR Portable Equipment Phase 3:

Deployment Conceptual Design (Attachment 3 contains Conceptual Sketches)

Strategy Modifications Protection of connections Identify Strategy including how Identify modifications Identify how the connection is the equipment will be deployed protected to the point of use.

None. None. None.

Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan.

Page 36 of 72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling Determine Baseline coping capability with installed coping" modifications not including FLEX modifications, utilizing methods described in Table 3-1 of NEI 12-06:

  • Makeup with Portable Injection Source BWR Installed Equipment Phase 1:

Provide a generaL description of the coping strategies using installed equipment including modifications that are proposed to maintain spent fueL pooL cooling. Identify methods (makeup with portabLe injection source)and strategy(ies) utilized to achieve this coping time.

The Unit 1 and Unit 2 spent fuel pools are located in the refueling area within the Reactor Enclosure. Each spent fuel pool is licensed for a maximum fuel storage capacity of 4117 fuel assemblies. The water level in the spent fuel pools is maintained at about 23 feet above the tops of the stored fuel assemblies to provide radiation shielding of normal building occupancy by operating personnel.

Spent Fuel Pool (SFP) makeup is not a time constraint with the initial condition of Mode 1 at 100% power, since the worst case fuel pool heat load conditions only exist during a refueling outage. Under non-outage conditions, the maximum SFP heat load is 10.4 x 106 BTU/hour. Loss of SFP cooling with this heat load and an initial SFP temperature of 140 degrees F results in a time to boil of 10.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, and 138 hours0.0016 days <br />0.0383 hours <br />2.281746e-4 weeks <br />5.2509e-5 months <br /> to the top of active fuel. Therefore, completing the equipment line-up for initiating SFP makeup at 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> into the event ensures adequate cooling of the spent fuel is maintained.

The worst case SFP heat load during an outage is 50.4 x 106 BTU/hour. Loss of SFP cooling with this heat load and an initial SFP temperature of 140 degrees F results in a time to boil of 2.1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> to the top of active fuel. With the entire core being located in the SFP, manpower resources normally allocated to aligning core cooling along with the Operations outage shift manpower can be allocated to aligning SFP makeup which ensures the system alignment can be established within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Initiation at 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> into the event ensures adequate cooling of the spent fuel is maintained.

An initial evaluation was performed to determine the fuel pool timelines. Formal calculations will be performed to validate this information during development of the detailed design, and will be provided in a future 6-month update.

Reference(s):

1. LGS UFSAR, Revision 16, September 2012.
2. Passport AR 1468452-02, Determine Times and Levels for the Spent Fuel Pool in Support of FLEX Integrated Plan Submittal for Fukushima During an Extended Loss of AC Power Event.

3 Coping modifications consist of modifications installed to increase initial coping time, i.e. , generators to preserve vital instruments or increase operating time on battery powered equipment.

Page 37 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Details:

Provide a brief N/A description of Procedures I Strategies I Guidelines Identify any equipment SFP Level Modification as required by EA-12-051 modifications Key SFP Parameter SFP Level provided by modification required by EA 051 Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28,2013 Integrated Plan.

Page 38 of 72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling BWR Portable Equipment Phase 2:

Provide a general description of the coping strategies using on-site portable equipment including modifications that are proposed to maintain spentjuel pool cooling. Identify methods (makeup with portable injection source) and strategy(ies) utilized to achieve this coping time.

SFP Makeup and Overspray:

Primary Method:

The RHRSW can be cross-connected to the RHR system through existing piping. The RHRSW B train can be cross-connected to the Unit 1 RHR B train; the RHRSW A train can be cross-connected to the Unit 2 RHR A train. Injection into the Unit 1 RHR B train and the Unit 2 RHR A train will be used to provide makeup to the Spent Fuel Pool. This requires the installation of a spool piece that provides the flow path or a bypass of the installed spool piece for RHR Fuel Pool Cooling mode. During normal operation, a spool piece with blind flanges that blocks this flowpath is installed. If this flowpath is required, installation of an open spool piece or bypass of the existing installed spool piece would be required (Reference 3).

Two diesel driven portable pumps (FLEX Pumps) will take suction on the Spray Pond and discharge into the common Residual Heat Removal Service Water (RHRSW) Systems, which will then be cross-connected to the respective unit's Residual Heat Removal (RHR) System.

The new RHRSW to RHR crosstie on each unit will include a quick hose connection that can be used to supply water from the RHRSW into a hose attached to a new run of piping that will be installed from elevation 201' to the refuel floor elevation, 352'. At the refuel floor elevation, another hose connection will be provided that can be used to provide the capability for overspray of the Spent Fuel Pools.

Alternate Method:

Additional diversity for Spent Fuel Pool cooling is provided by a new RHRSW to RHR cross-tie on both units. This cross-tie will allow each train of RHRSW to provide flow to both units' A and B RHR trains in the event one of the trains is out of service.

In addition, if the Fire Water System is available, a FLEX pump could provide water from the Fire Water System for overspray of the Spent Fuel Pools in accordance with existing procedural guidance (Reference 1).

Note: If one of the LGS units is in a refuel outage with a full core offload, then makeup to the RPV and Suppression Pool will be unnecessary for that unit.

Reference(s):

1. TSG-4.1, Operational Contingency_ Guidelines, Revision 13, Attachment 3.

Page 39 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling BWR Portable Equipment Phase 2:

2. Passport AR 1468452-02, Evaluation for SFP makeup time requirement.
3. LGS UFSAR, Revision 16, September 2012.

Schedule:

Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation I Strategies I Guidelines LGS will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures andlor guidelines will support the existing symptom based command and control strategies in the current EOPs. Procedural changes will include reference to level indication that will be provided in accordance with EA-12-051.

Identify modifications Modify RHRSW System to allow the FLEX Pump injection, which will allow injection from the Spray Pond into RHR and then into the Spent Fuel Pool.

Add RHRSW to RHR cross-connect for the A train of RHR for Unit 1 and for the B train of RHR for Unit 2. Include a hose connection to provide a source of water for Spent Fuel Pool overspray.

Modify RHR to Fuel Pool Cooling supply line to provide hose connections that support bypass of the normally installed spool piece.

Provide riser pipe, one per unit, from elevation 201' to elevation 352' to provide a flow path from RHRSW to the fuel floor.

SFP Level Modification as required by EA-12-051 Key SFP Parameter SFP Level provided by modification required by EA-12-051 Storage I Protection of Equipment:

Describe storage / protection plan or schedule to determine storage requirements Seismic List how equipment is protected or schedule to protect Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Page 40 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling BWR Portable Equipment Phase 2:

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Flooding List how equipment is protected or schedule to protect Note: if stored below current flood level, then ensure procedures exist to move equipment prior to exceeding flood level. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements ,relative to the external hazards applicable to LGS.

Severe Storms with High List how equipment is protected or schedule to protect Winds Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Snow, Ice, and Extreme List how equipment is protected or schedule to protect Cold Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

High Temperatures List how equipment is protected or schedule to protect Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date. Temporary Page 41 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling BWR Portable Equipment Phase 2:

locations will be used until building construction completion.

Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Deployment Conceptual Design (Attachment 3 contains Conceptual Sketches)

Strategy Modifications Protection of connections Identify Strategy including how Identify modifications Identify how the connection is the equipment will be deployed protected to the ~oint of use.

Storage location and structure Modify RHRSW System of The RHRSW connection is have not been decided yet. each unit to add a flange with a located inside the Spray Pond The FLEX Pumps will be quick disconnect from the Pump House, which is a safety brought to the area of the Spray FLEX Pump. related, Class I structure.

Pond Pump House. The suction of the pumps will be Security fence will be modified routed to the Spray Pond or a andlor dry hydrant(s) will be dry hydrant supplied by the installed to allow suction from Spray Pond; the discharge of the Spray Pond.

the pumps will be routed to the RHRSW System of each unit. Construct robust structure in Water from the Spray Pond will the vicinity of the Spray Pond be injected into the RHRSW Pump House to store the FLEX System and from there into the Pumps and required supporting RHR System. With injection equipment.

being supplied to the RHR System, makeup to the SFP is available when necessary.

Storage location and structure None.

have not been decided yet.

The FLEX Pumps will be brought to the south yard near the south Reactor Enclosure air lock doors. The suction of the pumps will be routed to the nearest fire hydrant in the south yard; the discharge of the pumps will be routed to the spent fuel pool of each unit.

Page 42 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling BWR Portable Equipment Phase 2:

Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28,2013 Integrated Plan.

Page 43 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling BWR Portable Equipment Phase 3:

Provide a general description of the coping strategies using phase 3 equipment including modifications that are proposed to maintain spent fuel pool cooling. Identify methods (makeup with portabLe injection source)and strategy(ies) utilized to achieve this coping time.

Phases 1 and 2 strategy will provide sufficient capability such that no additional Phase 3 strategies are required.

Phase 3 equipment for LGS includes backup portable pumps and generators. The portable pumps will be capable of providing the necessary flow and pressure as outlined in the Phase 2 response for Core Cooling & Heat Removal, RCS Inventory Control and Spent Fuel Pool Cooling. The portable generators will be capable of providing the necessary 480 volt power requirements as outlined in Phase 2 response for Safety Functions Support.

Schedule:

Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation I Strategies I Guidelines LGS will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs. Procedural changes will include reference to level indication that will be provided in accordance with EA-12-051.

Identify modifications List modifications None.

Key SFP Parameter SFP Level provided by modification required by EA-12-051 Deployment Conceptual Design (Attachment 3 contains Conceptual Sketches)

Strategy Modifications Protection of connections Identify Strategy including how Identify modifications Identify how the connection is the equipment will be deployed protected to the point of use.

None. None. None.

Page 44 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Maintain Spent Fuel Pool Cooling BWR Portable Equipment Phase 3:

Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA 049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan.

Page 45 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Safety Functions Support Determine Baseline coping capability with installed coping4 modifications not including FLEX modifications.

BWR Installed Equipment Phase 1 Provide a general description of the coping strategies using installed equipment including station modifications that are proposed to maintain and/or support safety functions. Identify methods and strategy(ies) utilized to achieve coping times.

Electrical Support The Class IE I251250VDC System consists of four independent and redundant electrical power divisions per unit. Divisions I and II each consist of two series connected 125 VDC batteries, each with its own charger and a 1251250 VDC, 3-wire ungrounded distribution system. Divisions III and IV each consist of one 125 VDC battery with its own charger, and a 2-wire ungrounded distribution system.

Each Class IE I251250VDC System battery charger receives 480 VAC, 3 phase, 60 hz power from a 480 VAC Class IE MCC associated with the same Unit and safeguards channel as the charger. Each Class IE I25/250VDC System battery is connected in parallel with the associated battery charger and automatically provides the primary source of power to the Class IE loads immediately upon loss of the battery charger. Each battery charger remains connected to the Class IE 1251250VDC System and immediately replaces the battery as the primary source of power upon restoration of the charger.

Safety Related 250VDC and I25VDC Bus voltage will be maintained by their associated batteries until the transition to Phase 2 at which time portable 480V generators will be placed in service to re-energize the battery chargers.

DC load shedding will be accomplished in accordance with E-I, Loss of All AC Power (Station Blackout) (Reference 1).

Additional load shedding will be performed to extend battery life for the ELAP (Reference 7).

This additional DC load shedding will be proceduralized after the detailed design has been completed.

Preliminary analysis indicates that with this additional load shedding, battery voltage will fall below acceptable values at the following times:

Division I - IAIDlOI 7.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 Coping modifications consist of modifications installed to increase initial coping time, i.e., generators to preserve vital instruments or increase operating time on battery powered equipment.

Page 46 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Division 1- 1A2D101 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> Division II - 1BID101 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> Division II - 1B2D101 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> Division III - 1CD101 8.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> Division IV - 1DD101 7.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> RCIC Room Habitability Per RCIC Room Temperature Calculation, LM-0689, RCIC Room temperature will reach 1560 F within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. Unit 1 and 2 RCIC Room doors and blowout panels will be opened within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> to limit room temperature rise. The temperature limit for the RCIC room is 1580 F, based on the environmental qualification (EQ) of the equipment in the RCIC room. (Reference 2, 6)

Main Control Room Habitability Several actions can be taken in accordance with ON-115, Loss of Control Enclosure Cooling, which will reduce the heat load in the Main Control Room (MCR) and extend the time of its habitability. However, the use of portable fans with other procedurally directed actions similar to those described in SE-1-3 will need to be implemented to prevent MCR temperature from exceeding 1200 F. (References 3, 4, 5)

Battery Room Ventilation It is expected that the rise in temperature in the safety-related battery rooms due to the loss of ventilation will not adversely affect the functionality of the batteries. However, hydrogen generation upon re-energizing the battery chargers will be addressed in Phase 2.

ReferenceC s):

1. E-l, Loss of All AC Power (Station Blackout), Revision 43.
2. LM-0060, Limerick Generating Station - SBO Analysis for the RCIC and HPCI Pump Rooms, Revision 2.
3. ON-115, Loss of Control Enclosure Cooling, Revision 19.
4. SE-I-3, Protected Ventilation Source, Revision 15.
5. M-78-76, Portable Ventilating Fan Capacity for Control Enclosure Rooms - Appendix R, Revision 2.
6. LM-0689, RCIC Pump Room Temps for Extended Loss of AC Power - Post Fukushima Scenario, Revision O.
7. Passport AR 1468452, Evaluation 01, Battery Coping Times during ELAP with Extended Load Shedding.

Details:

Provide a brief Confirm that procedure/guidance exists or will be developed to description of support implementation.

Procedures / Strategies /

Guidelines E-1, Loss of All AC Power (Station Blackout), will be modified with a condition to_go to the extended SBO guidance. This procedure Page 47 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan currently provides direction to open the RCIC Room doors and blowout panels.

Additional procedural guidance for load shedding for the ELAP will be provided.

ON-115 currently provides direction to take action to reduce the heat load in the Main Control Room.

LGS will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures and/or guidelines will support the existing symptom based command and control strategies in the current EOPs.

Identify modifications List modifications and describe how they support coping time.

None.

Key Parameters List instrumentation credited for this coping evaluation phase.

The evaluation of the FLEX strategy for LGS may identify additional parameters that are needed in order to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. Any differences will be communicated in a future 6-month update following the identification of additional parameters.

Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28,2013 Integrated Plan.

Page 48 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Safety Functions Support BWR Portable Equipment Phase 2 Provide a generaL description of the coping strategies using on-site portabLe equipment including station modifications that are proposed to maintain and/or support safety functions. Identify methods and strategy(ies) utilized to achieve coping times.

Electrical Support Primary Strategy:

The electrical strategy conceptual design contains features to expedite and simplify implementation, and may not be required in order to meet the event timeline for maintaining the safety function requirements of NEI 12-06. Power from the FLEX generators will be provided through FLEX electrical connections in the Emergency Diesel Generator (EDG) 480 V Motor Control Centers (MCCs), DI14-D-G, DI24-D-G, and D134G for Unit 1 and D214-D-G, D224-D-G, and D234-D-G for Unit 2. These MCCs will back feed the 480V ESF buses to provide power for Division I, II and III ESF loads. In order to power an individual battery charger, the generator is connected to the MCC corresponding to the appropriate electrical division. Once the correct MCC is powered, the individual critical load will be powered. All loads must be stripped from the buses and only required loads are powered.

Alternate Strategy:

The second proposed modification completes the installation of transfer switches and welding receptacles to the remaining battery chargers. These modifications would allow for direct powering of individual battery chargers from the FLEX diesel generators. This modification would be performed on the IBCA1, 1BCA2, 1BCB2, 2BCA1, 2BCB1, and 2BCB2 battery chargers. Pre-staged cables would be run from the FLEX generators to the battery chargers required.

RCIC Room Habitability Per RCIC Room Temperature Calculation, LM-0689, RCIC Room temperature will reach 1560 F within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. Units 1 and 2 RCIC Room doors and blowout panels will be opened within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> to limit room temperature rise. The temperature limit for the RCIC room is 1580 F, based on the environmental qualification (EQ) of the equipment in the RCIC room. (References 1, 5)

Main Control Room Habitability Exelon Generation Company, LLC (Exelon) intends on maintaining Operational command and control within the Main Control Room. Habitability conditions will be evaluated and a strategy will be developed to maintain Main Control Room habitability. The strategy and associated support analyses will be provided in a future six month update.

Several actions can be taken in accordance with ON-115, Loss of Control Enclosure Cooling, which will reduce the heat load in the MCR and extend the time of its habitability. However, the use of Page 49 of 72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Safety Functions Support BWR Portable Equipment Phase 2 portable fans with other procedurally directed actions similar to those described in SE-I-3 will need to be implemented to prevent MeR temperature from exceeding 1200 F. (References 2, 3, 4)

Battery Room Ventilation It is expected that the rise in temperature in the Safety Related Battery Rooms due to the loss of ventilation will not adversely affect the functionality of the batteries.

Battery Room doors will be opened to prevent the occurrence of high hydrogen concentration in the rooms once the battery chargers are re-energized. Procedural guidance to prop open the Battery Room doors similar to that provided in ON-II5 will be implemented. (Reference 2)

Refuel Floor Conditions Evaluation of the spent fuel pool area for steam and condensation has not yet been performed. The results of this evaluation and the vent path strategy, if needed, will be provided in a future 6-month update.

Fuel Oil Supply to Portable Equipment Fuel oil to FLEX Pumps and Generators will be supplied by the quantity of fuel in the tanks located on the skids of the portable equipment. This will then be supplemented by fuel tanks contained on the back of the FLEX Truck. When required, fuel can then be pumped from the EDG Fuel Storage Tanks.

Reference(s):

1. LM-0060, Limerick Generating Station - SBO Analysis for the RCIC and HPCI Pump Rooms, Revision 2.
2. ON-II5, Loss of Control Enclosure Cooling, Revision 19.
3. SE-I-3, Protected Ventilation Source, Revision 15.
4. M-78-76, Portable Ventilating Fan Capacity for Control Enclosure Rooms - Appendix R, Revision 2.
5. LM-0689, RCIC Pump Room Temps for Extended Loss of AC Power - Post Fukushima Scenario, Revision O.

Details:

Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation with a description of the procedure / strategy I Strategies I Guidelines / guideline.

LGS will utilize the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures Page 50 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Safety Functions Support BWR Portable Equipment Phase 2 and/or guidelines will support the existing symptom based command and control strategies in the current EOPs.

Identify modifications List modifications necessary for phase 2 Electrical Support EDG MCCs will be modified as necessary to enable connection from the FLEX generators to supply power to the Motor Control Centers (MCCs) supplying the required components.

Installation of transfer switches and welding receptacles to the battery chargers that do not currently have these installed.

Key Parameters List instrumentation credited or recoveredfor this coping evaluation.

Phase 2 FLEX equipment will have installed local instrumentation needed to operate the equipment. The use of these instruments will be in the associated procedures for use of the equipment. These procedures will be based on inputs from the equipment suppliers, operational experience, and expected equipment function in an ELAP.

Storage / Protection of Equipment :

Describe stora~e / protection plan or schedule to determine stora~e requirements Seismic List how equipment is protected or schedule to protect Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date.

Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Page 51 of 72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Safety Functions Support BWR Portable Equipment Phase 2 Flooding List how equipment is protected or schedule to protect Note: if stored below current flood level, then ensure procedures exist to move equipment prior to exceeding flood level. Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date.

Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Severe Storms with High List how equipment is protected or schedule to protect Winds Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section II.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date.

Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Snow, Ice, and Extreme Cold List how equipment is protected or schedule to protect Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date.

Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Page 52 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Safety Functions Support BWR Portable Equipment Phase 2 High Temperatures List how equipment is protected or schedule to protect Structures to provide protection of FLEX equipment will be constructed to meet the requirements of NEI 12-06 Section 11.

Schedule to construct permanent building(s) is contained in Attachment 2, and will satisfy the site compliance date.

Temporary locations will be used until building construction completion. Procedures and programs will be developed to address storage structure requirements, haul path requirements, and FLEX equipment requirements relative to the external hazards applicable to LGS.

Deployment Conceptual Design (Attachment 3 contains Conceptual Sketches)

Strategy Modifications Protection of connections Identify Strategy including how Identify modifications Identify how the connection is the equipment will be deployed protected to the point of use.

The FLEX generator(s) will be EDG MCCs will be modified Electrical FLEX connections housed in a nearby storage as necessary to enable will meet NEI 12-06 Revision structure. connection from the generators oprotection requirements.

to supply power to the Motor Control Centers (MCCs) supplying the required components.

Installation of transfer switches and welding receptacles to the battery chargers that do not currently have these installed.

Construct storage structure in the South Yard to store the FLEX Generator(s) and required supporting equipment.

Page 53 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Safety Functions Support BWR Portable Equipment Phase 2 Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan.

Page 54 of 72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Safety Functions Support BWR Portable Equipment Phase 3 Provide a general description of the coping strategies using phase 3 equipment including modifications that are proposed to maintain and/or support safety functions. Identify methods and strategy(ies) utilized to achieve coping times.

Phases 1 and 2 strategy will provide sufficient capability such that no additional Phase 3 strategies are required.

Phase 3 equipment for LGS includes backup portable pumps and generators. The portable pumps will be capable of providing the necessary flow and pressure as outlined in the Phase 2 response for Core Cooling & Heat Removal, RCS Inventory Control and Spent Fuel Pool Cooling. The portable generators will be capable of providing the necessary 480 volt power requirements as outlined in Phase 2 response for Safety Functions Support.

Details:

Provide a brief Confirm that procedure/guidance exists or will be developed to description of Procedures support implementation with a description of the procedure / strategy

/ Strategies / Guidelines / guideline.

LGS will use the industry developed guidance from the Owners Groups, EPRI and NEI Task team to develop site specific procedures or guidelines to address the criteria in NEI 12-06. These procedures andlor guidelines will support the existing symptom based command and control strategies in the current EOPs.

Identify modifications List modifications necessary for phase 3 None.

Key Parameters List instrumentation credited or recovered for this coping evaluation.

The evaluation of the FLEX strategy for LGS may identify additional parameters that are needed in order to support key actions identified in the plant procedures/guidance or to indicate imminent or actual core damage. Any differences will be communicated in a future 6-month update following the identification of additional parameters.

Deployment Conceptual Design (Attachment 3 contains Conceptual Sketches)

Strategy I Modifications I Protection of connections Page 55 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Safety Functions Support BWR Portable Equipment Phase 3 Identify Strategy including how Identify modifications Identify how the connection is the equipment will be deployed protected to the point of use.

None. None. None.

Notes:

Exelon Generation Company, LLC (Exelon) has not finalized the engineering designs for compliance with NRC Order EA-12-049. Detailed designs based on the current conceptual designs will be developed to determine the final plan and associated mitigating strategies. Analysis will be performed to validate that the plant modifications, selected equipment, and identified mitigating strategy can satisfy the safety function requirements of NEI 12-06. Once these designs and mitigating strategies have been fully developed, Exelon will update the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the initial designs as submitted in the February 28, 2013 Integrated Plan.

Page 56 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan BWR Portable Equipment Phase 2 Use and (potential/flexibility) diverse uses Performance Criteria Maintenance List portable Core Containment SFP Instrumentation Accessibili ty Maintenance I PM equipment requirements Three (3) X X X 1200 gpm, 250 psig Equipment maintenance large self and testing will be prime pumps performed in accordance with the industry templates, as outlined in JLD-ISG-2012-01 Section 6 and NEI 12-06 Section 11.

Three hose X X X Contain hoses and Equipment maintenance trailers fittings necessary to and testing will be strategies associated performed in accordance with portable pumps with the industry templates, as outlined in JLD-ISG-2012-01 Section 6 and NEI 12-06 Section 11.

Page 57 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan BWR Portable Equipment Phase 2 Use and (potential/flexibility) diverse uses Peiformance Criteria Maintenance List portable Core Containment SFP Instrumentation Accessibility Maintenance I PM equipment requirements Three (3) 480 X X X X 400 kw (minimum) Equipment maintenance VAC and testi ng will be Generators performed in accordance with the industry templates, as outlined in JLD-ISG-2012-01 Section 6 and NEI 12-06 Section 11.

Heavy Duty X X X X F-750 with on-board fuel Equipment maintenance Truck tanks for refueling and testing will be portable equipment. performed in accordance Used to transport with the industry portable equipment and templates, as outlined in clear debris JLD-ISG-2012-01 Section 6 and NEI 12-06 Section 11.

Page 58 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan BWR Portable Equipment Phase 2 Use and (potential/flexibility) diverse uses Peiformance Criteria Maintenance List portable Core Containment SFP Instrumentation Accessibility Maintenance I PM equipment requirements Six (6) X 42" 120V, 2 speed fan Equipment maintenance Industrial 13,300 CFM ON HIGH and testing will be Blowers AND 9,500 CFM ON performed in accordance LOW with the industry templates, as outlined in JLD-ISG-2012-0l Section 6 and NEI 12-06 Section 11.

Ten (10) X 115V Equipment maintenance Portable fans 5200 cfm and testi ng will be with flexible performed in accordance ducting with the industry templates, as outlined in JLD-ISG-2012-01 Section 6 and NEI 12-06 Section 11.

Page 59 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan BWR Portable Equipment Phase 2 Use and (potential/flexibility) diverse uses Performance Criteria Maintenance List portable Core Containment SFP Instrumentation Accessibility Maintenance I PM equipment requirements Six (6) X 5.SkW Equipment maintenance 1201240V and testing will be Portable AC performed in accordance Generators with the industry templates, as outlined in JLD-ISG-2012-01 Secti on 6 and NEI 12-06 Section 11.

Page 60 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan BWR Portable Equipment Phase 3 Use and (potential/flexibility) diverse uses Performance Criteria Notes List portable Core Containment SFP Instrumentation Accessibility equipment Note: The RRC equipment has not been procured at the time of this submittal. Once the SAFER committee determines the equipment specifications for bid, updates will be made as necessary to this table. The Phase 3 portable equipment table will be updated once all of the equipment has been procured and placed in inventory.

Medium X X X X X 2 MW output at 4160

  • Generator must be Voltage VAC, three phase common Diesel commerci all y Generator available.
  • Must run on diesel fuel.

Low Voltage X X X X X 500 kW output at 480

  • Generator must be Diesel VAC, three phase common Generator commercially available.
  • Must run on diesel fuel.

Low Pressure X X X 300 psi shutoff head, Low Pressure Pump Pump 2500 gpm max flow Low Pressure X X 500 psi shutoff head, Low Pressure Pump Pump 500 gpm max flow Page 61 of 72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan BWR Portable Equipment Phase 3 Use and (potential/flexibility) diverse uses Performance Criteria Notes List portable Core Containment SFP Instrumentation Accessibility equipment Low Pressure X 110 psi shutoff head, Low Pressure Pump Pump 400 gpm max flow submersible Low Pressure X X 150 psi shutoff head, Low Pressure Pump Pump 5000 gpm max flow Air X 120 psi minimum Air Compressor Compressor pressure, 2000 scfm Page 62 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Phase 3 Response Equipment/Commodities Item Notes Radiation Protection Equipment The RRC will not stock this type of equipment but this equipment will be requested

  • Survey instruments from site-to-site and utility-to-utility on an as required basis.
  • Dosimetry
  • Off-site monitoring/sampling Commodities The RRC will not stock these commodities but they will be requested from site-to-
  • Food site and utility-to-utility on an as required basis.
  • Potable water Fuel Requirements 300 - 500 gallon bladders that can be delivered by air.

Heavy Equipment TBD during site specific playbook development

  • Transportation equipment Redundant Phase 2 equipment to be located at RRC.
  • Debris clearing equipment Page 63 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Attachment lA Sequence of Events Timeline Time Remarks I Action Elapsed Constraint Applicability item Time Action V/N 5 Plant @100%

0 Event Starts NA power Operator 1 0 Enter TRIPS N Response Operator 2 0 Enter SBO Procedure N Response

< 10 Manually operate MSRV, stabilize Reactor E-1, SBO 3 minutes Pressure, initiate cooldown N Procedure

< 10 E-1, SBO 4 minutes If HPCI automatically initiated, shutdown HPCI Y Procedure

< 10 Maintain RCiC with suction from the Suppression E-1, SBO 5 minutes Pool N Procedure

< 10 E-1, SBO 6 minutes Attempts to start EDGs from MCR unsuccessful N Procedure

< 10 E-1, SBO 7 minutes Dispatch operators to attempt to start EDGs locally N Procedure

~ 20 E-1, SBO 8 minutes Commence cooldown of RPV N Procedure

~45 E-1, SBO 9 minutes DC load shedding initiated N Procedure E-1, SBO 10 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Attempts to start EDGs locally unsuccessful N Procedure Time constraint because decision drives timeline for additional load Control Room crew has assessed SBO and plant shedding and conditions and declares an Extended Loss of AC setup of FLEX 11 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Power (ELAP) event. y equipment.

5 Instructions: Provide justification if No or NA is selected in the remarks column If yes, include technical basis discussion as required by NEI 12-06 section 3.2.1.7 Page 64 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Time Remarks I Action Elapsed Constraint Applicability item Time Action yIN 5 Preliminary DC analysis shows the batteries have a minimum of7 hours coping capability with initial and deep Dispatch Operators to begin setup/connection of load shedding 12 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> FLEX equipment. N completed.

Limit heatup of RCIC Room to

< 1.5 Complete actions to establish natural ventilation to allow prolonged 13 hours RCIC Rooms. Y RCIC operation.

Prolong battery life. E-1 SBO Procedure requires that this is completed in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Actual time to complete has been evaluated to confirm that it can be completed 14 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Complete initial SBO DC Load Shed. Y within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Prolong battery life beyond current SBO Complete additional load sheds (ELAP) identified guidance. Current 15 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> for battery life extension. Y analysis basis.

Page 65 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Time Remarks I Action Elapsed Constraint Applicability item Time Action YIN 5 Preliminary analysis indicates that the HCTL curve will be exceeded at "'4 hrs based on this strategy. RPV depressurization stops at "'200 psig (pressure band of 150-250 psig used) in RPV to preserve RCiC operation.

Modified depressurization Heat Capacity Temperature Limit (HCTL) curve approach exceeded, RPV depressurization to '" 200 psig supported by required. RPV pressure maintained at 150 to 200 BWROG changes 16 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> psig to support RCIC Operation. N to EPGs.

Preliminary 17 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Initiate early containment venting. Y analysis Preliminary analysis indicates that battery life to support RCIC operation is limited to approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />. Restore power to battery Portable Generators providing power to battery chargers prior to 18 < 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> chargers. Y reaching 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.

Portable Pumps connected to RHRSW and Time critical available to provide water for suppression pool actions are Items 19 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> cooling and inventory control, SFP makeup. N #20 and #21 Documented in sequence of events basis Provide SFP makeup via portable pumps to section as Action 20 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> RHRSW/RHR to SFP. Y Item Page 66 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Time Remarks I Action Elapsed Constraint Applicability item Time Action V/N 5 Preliminary analysis indicates that Suppression Pool makeup will be required at Provide Suppression Pool makeup via portable approximately 65 21 ~ 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> pumps to RHRSW/RHR. Y hours.

Not time critical since RRC equipment is not needed at 24 Initial equipment from Regional Response Center hours to support 22 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> becomes available. N actions.

Continue to maintain critical functions of core Not time critical cooling (via RClC), containment (via hardened vent since Phase 2 opening and FLEX pump injection to suppression actions result in pool) and SFP cooling (FLEX pump injection to SFP). indefinite coping Utilize initial RRC equipment in spare capacity and times for all safety begin setup for suppression pool cooling via the functions.

additional RRC equipment to be delivered (4160 VAC generator to power RHR pump and large FLEX 24 -72 pump to provide cooling water flow from Spray 23 hours Pond to the RHR Heat Exchanger). N Not time critical since Phase 2 actions result in Establish suppression pool cooling via RRC indefinite coping equipment and continue to maintain critical times for all safety 24 72+ hours functions. N functions.

Page 67 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Attachment 2 Milestone Schedule Original Target Activity Status Completion Date {Include date changes in this column}

Submit 60 Day Status Report Complete Submit Overall Integrated Complete Implementation Plan Contract with RRC Complete Recurring action, Submit 6-month updates Ongoing August and February Unit 1 Unit 2 Modification Development Feb 2015 Mar 2014

  • Phase 2 modifications Note 1 Feb 2015 Mar 2014
  • Phase 3 modifications Note 1 Unit 1 Unit 2 Modification Implementation Apr 2016 ~pr 2015
  • Phase 2 modifications Note 1 Apr 2016 ~pr 2015
  • Phase 3 modifications Note 1 Procedure development April 2015
  • Strategy procedures Note 1 April 2015
  • Maintenance procedures Note 1 November 2014 Staffing analysis Note 1 April 2015 Storage Plan and Construction Note 1 April 2015 FLEX equipment acquisition Note 1 April 2015 Training completion Note 1 December 2014 Regional Response Center (will be a standard date from Operational RRC)

April 2016 Unit 1 Implementation date Note 1 April 2015 Unit 2 Implementation date Note 1 Note(s):

1. Exelon will update the status of ongoing and future milestones in the Integrated Plan for LGS during a scheduled 6-month update. This update will include any changes to the milestone schedule as submitted in the February 28,2013 Integrated Plan .

Page 68 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan Attachment 3 Conceptual Sketches (Conceptual sketches, as necessary to indicate equipment which is installed or equipment hookups necessary for the strategies.)

Page 69 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan "1..\II5 1UNIIIICALII:UI . . u~ ,,"""'nlJll 0ICf .... . . ~

_1C1'1:JIRG.1l1ll_l

~42l~:.,;!~~ln-rm PI'(;fRQIIII£ ~ 1 1 Q El :.57'f (IR Q'lNTf IA'LPOOlGf"!AV c-t ~~'-"""'-'~ -

ClJENT:

~

NE ~ S ExeLon.

UMERlCK GEUERAlnfO SlA.l10N

~

t p .W r-- -,'/,l v

I SPEUTFl£l I I POOL I P.

L _ _ _~

,,10<

H ftJ II .(,,10 J 1'1:.:"

~

1 I IHLWA'tll i  !

6~

I f-

~ ~

10

r-'

n

, "J n~

~ f-

<YOlitI!T1,,--

___------ll

, ~ , "

(~X~X+'------------

~FUMPI.

PROJECT BU ILDING :

'3-400' UNIT '

FLOOR SHEET NAME E)( 51 NG EOUIPMENT fLE>C SlW.PUF1ED DESIGN t.4fCtiAA1CAL SCHEM,& TIC


NEwPERMAH£NTEOUIPIIilENT DATE II14n013 s e RE WI'.

NEW HOSE CONNE CTION DRAWN BV .~ -r CHECKED Bt. 1 2 OF 3 Page 70 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan "lAIIIIK"'II:AI..AIII,",u~'"""ntl'l

. . . . . . . . . . ..u;;II.Ia...

~nOiUC:L._!

",_?::::,...::~.".tm QJEHT, NE ~ S Exelon r~ L MERlCK flEHf AA',"G $ 1....liON J. ... .

't\T" --,

I-- '"

~ErnH""L. I

>001. I L _ _ _ -.l 11 II RHATOIlREWATfRQ".bJ II I 00 II II w II II z<5 I, II

~u. " o~

It'NWflL

-ct

.""'Ji t 'YII ~,

"' ~g: ~

1- 00 II II II II O:::(J)Z ~

Ii II <<(!)Q ~~

~ ~~_e________________~/I~~r.~'";rl' ~b,~~~__~I~I~__~~~A_C ~z~ fi1:§

~ il lUG u-C>

~~

IN'KOlm

=>1-;::

r------!l.l~~--/I z~~

I ~ AC il HV.:rC:.17B zWi§ OZii) i~

I Ed

~ 1/

1/

1/

...JWw w(!)O

~~><

i~

"'Iii u~

~

_ u.

0:::0 c.-' WW

~ !!;

f "'-"'-""'--~'-

ilA'Pf;£S

........ /'_, ... _/~ ... '-II

'IPOOl c

I


~-----~ -----

H'YZFQ"'B

...Ja. -'

~

ii)

II

&. II

-_-__-_-_...J--1 L_  :'d" - '"

~

Ii a w

~

0

~ w

~

/'fv 2~ )1

~

g

~i

,I '

~ ...J m

W r- --, a::

J I CClfQ:NSEIif HOT I
~ I-I ""'- I ~
!N!

~, L ___ ~

!.2 en >-

<II

<II iii>

, --./______________ J ~

~

0

~

i'~~r

~f " i'-l:.:::S.

flHRP

~P8 PROJE CT BUILDING 13--4001 i!

UNIT 2 FLOOR Ii EX S1 NG EO..!tpMEHl NEW P'ERMAHENTEOUIPIoiIEN T NEW PORTAt1LE FLEX eQUIPWEN '

SHEET NIIME DATE R..f}I SlMPUFlED DESIGN MfCHMICAL SCHEMAl C l/U'20ll SCAlE UtA

~~ 1-3-- NEW HOSE CONNE C.TION DRAWN8Y CHECKEOBV 3 OF

  • Page 71 of72

Limerick Generating Station, Units 1 and 2 Mitigation Strategies Integrated Plan

,~ l.~ 101 :;.o.FEGUAJ,'tJ TRANSfORMER 201 SAFE(,UAAD ..

TRAlIOFORMEF L, .....

IlloA11 1 UUIlCAl..A"",,,," COI'IfClUil'CIII

_ _ "' -CIIoDJIt.a

-altOOn-..a. .....t

,.. ~::::'l.,.tm

'~)

t; t01 SfU=E(JUARD 011 S~EGUARu

__~IlU",S~'- --+-4kV sus 6)

-===+=====;:::=:

') D1'

~EGUARO  ?

)

'---4-.""

') D13 5~FEWARD ?)

bV::' I

  • woo,

~ -

NE ~ S Exelon.

UIrIIEMQ<GENERA,lING ~lA11C:W

-:::CONTROL D POVVER

~ J)

') l)1141.4 C:l.

1 CONTROL F>NkR en LU (5

XFMR ) XFMR Z LU 0

~

~ Q:

I-en

Z 120VAC 1'2.0V';C 12011 At
\,OV AC ':UV kC odi) 0z ~

_ONTROl OU'3 CONTROL BUS ~ ONTROLa.. S

  • COmRi LDUS corl1ROLBUS <<(9 i= o~

~Z <{

c..>-<9 ~~

>~E Z~:::E ~~

ZUl~

oZoo ~~

L L _____ _ ...JUl LU U1(90 r;s~><

~~

"'bj o~

_lL ~

10 5VF'PI<E S'llC" ~o U1LU PO(l( Cl f -'i~' IP rUMPS

~ u::

~

i Il-
E 00

~~

0 w

'0< ~

(IJ 0

'"fil,.

w

.: 0 r}

,r ,

U w

J:

u It

!t.

PR OJECT Lj I t-l I III'13-400 1 BUilD ING: UNIT 1 & UN IT 2 z z i? :5

~ ~ ii ~ ~ Ei ~ ~ ~ §  ?  ?; ~

~~

-, i!' ~ 0 0  ?  ;::

0  ;::  ;::

c

FLOOR '

~ ~

~ ~ 9 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ =-

U, il iil ~ ~ ill ~

<.J g ~ e: U L' g ~ SHEET NAAtE

.~ .~ i£ i£ i£

":;; 5: i£ i£ 0:

Oi Q.

0:

~

in u

in "'~ 15in \i  !;i Ii;  :;;  :;;  :;; Iii ~

<.J in on

" in

,0

" "'g,. ";.: FLEX 91MPUFIED OE SI ~

oJ) 1:5 1:5 u 1:5 "'

15 g 1:5 15 o:l ~ 15 1:5 ~ ~ 1:5

~

1:5 1:5 ~ o:l 0

~ g
:; g ELEC1Fl1CAL. SCHEMATIC
:; l:l H 8 > > .5 "0 L' u 8  ::; I.'

u 1:1  ;- C;

~

~ ~

DATE l n~ l l SCAlE .

!;i ~

~ ~ § L ~ ~ '~" ~ iii ~

~ § ~ ~ .,~ ~ ~ ~

~)

< ~ DRAWN BY

~ § ~  ;::; ~ ~ H At;

~ ~

t

~ ~

(IJ

~ ~ ~ ~ g ~ i i ~

<<; ~

Ol Ii; ~ ~

"0:

!I; OiECKEDBY 1 OF ,

Page 72 of72