Forwards BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031, Per 10CFR50.59.Determination of Changes,Discussed
ML20206G023
Person / Time
Site: Beaver Valley FirstEnergy icon.png
Issue date: 04/29/1999
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206G027 List:
References
L-99-069, L-99-69, NUDOCS 9905070040
Download: ML20206G023 (1)


Text

e

.b g y Valley Power Station Shippingport. PA 15077 0004

=. .,

SUSHIL C. JAIN (412) 393 5512 se ' * "'** Fax (724) e43-so69 u e.IS.r ic.. '"' April 29, 1999 Nuclear Power Mon L-99-069 U. S. Nuclear Regulatory Commission j Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Report of Facility Changes, Tests and Experiments In accordance with 10 CFR 50.59, the Annual Report of Facility Changes, Tests, and Experiments for the Beaver Valley Power Station, Unit No. 2, is attached. This report provides a brief description of each facility and procedure change and a summary of the safety evaluations. The annual report covers the period of November 1,1997, through October 31,1998.

i Each change was evaluated to determine (1) if the probability of occurrence or the consequences of an accident or the malfunction of equipment important to safety previously evaluated in the Updated Final Safety Analysis Report may be increased, or (2) if a possibility for an accident or malfunction of a different type than any evaluated previously in the Updated Final Safety Analysis Report may be created, or (3) if the margin of safety as defined in the basis for any technical specification is reduced. In each case, it was determined that the change did not constitute an unreviewed safety question as defined in 10 CFR 50.59.

If you have any questions regarding this report, please contact Mr. Mark S.

Ackerman, Manager, Safety and Licensing, at (412) 393-5203.

Sincerely, eG I Attachment 5>MU

. Sushil C. Jain M/hh1 c: Mr. D. S. Collins, Project Manager DEtlVERING Mr. D. M. Kern, Sr. Resident Inspector 0 U A L l .T Y Mr.11. J. Miller, NRC Region I Administrator - ENERGY l 9905070040 990429 l PDR ADOCK 05000412 j' R PDR L