Ltr. 04/15/19 Fermi Power Plant, Unit 2 - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000341/2019004 (DRS-V.Petrella)
ML19106A043
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/15/2019
From: Vance Petrella
NRC/RGN-III/DRS/EB2
To: Fessler P
DTE Energy
References
IR 2019004
Download: ML19106A043 (10)


See also: IR 05000341/2019004

Text

April 15, 2019

Mr. Paul Fessler, Senior VP

and Chief Nuclear Officer

DTE Energy Company

Fermi 2 - 260 TAC

6400 North Dixie Highway

Newport, MI 48166

SUBJECT: FERMI POWER PLANT, UNIT 2NOTIFICATION OF AN NRC TRIENNIAL HEAT

SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000341/2019004

Dear Mr. Fessler:

On October 28, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite

portion of the Triennial Heat Sink Performance Inspection at your Fermi Power Plant, Unit 2.

This inspection will be performed in accordance with NRC baseline Inspection

Procedure 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than June 17, 2019.

By July 5, 2019, the inspector will communicate the initial selected set of approximately

2-3 risk significant heat exchangers, and 3-4 risk significant pumps, tower fans, and/or

valves for the safety-related service water system.

  • The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers,

should be available at the Regional Office no later than October 7, 2019. This

information should be separated for each selected component, especially if provided

electronically (e.g., folder with component name that includes calculations, condition

reports, maintenance history, etc.). During the in-office preparation activities, the

inspector may identify additional information needed to support the inspection.

  • The last group includes the additional information above as well as plant specific

reference material. This information should be available at the Regional Office no later

than October 15, 2019. It is also requested that corrective action documents and/or

questions developed during the inspection be provided to the inspector as the

documents are generated.

P. Fessler -2-

All requested documents are to be for the time period from the onsite inspection period back

to the documents that were provided in response to the previous Heat Sink Performance

Inspection. If no activities were accomplished in that time period, then the request applies to

the last applicable document in the previous time period. It is important that these documents

be as complete as possible, in order to minimize the number of documents requested during

the preparation week or during the onsite inspection.

The lead inspector for this inspection is Vance Petrella. We understand that our licensing

contact for this inspection is Shane Gatter of your organization. If there are any questions about

the inspection or the material requested in the enclosure, please contact the lead inspector at

630-829-9847 or via e-mail at Vance.Petrella@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Vance Petrella, Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-341

License No. NPF-43

Enclosure:

Document Request for Triennial Heat Sink

Performance Inspection

cc: Distribution via LISTSERV

P. Fessler -3-

Letter to Paul Fessler from Vance Petrella dated April 15, 2019.

SUBJECT: FERMI POWER PLANT, UNIT 2NOTIFICATION OF AN NRC TRIENNIAL HEAT

SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000341/2019004

DISTRIBUTION:

Michael McCoppin

RidsNrrDorlLpl3

RidsNrrPMFermi2 Resource

RidsNrrDirsIrib Resource

Darrell Roberts

John Giessner

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML19106A043

OFFICE RIII

NAME VPetrella:cl

DATE 04/15/19

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

Inspection Report: 05000341/2019004

Inspection Dates: October 28, 2019, through November 1, 2019

Inspection Procedure: 71111.07, Heat Sink Performance

Lead Inspector: Vance Petrella

630-829-9847

Vance.Petrella@nrc.gov

Please provide the information electronically in pdf files, Excel, or other searchable formats,

preferably on some portable electronic media (e.g., CD-ROM, DVD). The portable electronic

media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of

use. Information in lists should contain enough information to be easily understood by

someone who has knowledge of light water reactor technology.

I. Information Requested By June 17, 2019

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13

heat exchanger.

3. List of Corrective Action Program (CAP) documents (with a short description)

associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion,

fouling, or heat exchanger testing, for the previous 3 years or since the last CAP

document list was sent to the U.S. Nuclear Regulatory Commission for the

previous Heat Sink Performance Inspection. The list should include all CAP

documents not on the last CAP document list.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers,

Ultimate Heat Sink (UHS), and safety-related service water systems since the

last Heat Sink Performance Inspection.

5. Last two System Health Report(s) and maintenance rule system notebooks for all

the GL 89-13 heat exchangers, UHS, and safety-related service water systems.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be

for the time period from the onsite inspection period back to the documents that

were provided in response to the previous Heat Sink Performance Inspection.

Enclosure

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

7. List of permanent and temporary modifications (with a short description)

associated with GL 89-13 heat exchangers, UHS, and safety-related service

water systems. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in response to

the previous Heat Sink Performance Inspection.

8. Electronic copies of the current Final Safety Analysis Report, Technical

Specifications, Technical Specifications Basis, and Technical Report Manual.

9. List of enhancements and/or commitments made during license renewal for

GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling

water systems (as applicable).

10. Electronic copies of the current Probability Risk Assessment Summary Note

Books.

11. A list of the top 30 risk-significant pumps, tower fans, and/or valves for the

safety-related service water system in order of risk significance.

12. Provide an electronic copy of piping and instrumentation diagrams for the

safety-related service water system, including the intake structure.

II Information Requested By October 7, 2019

1. Copies of the GL 89-13 responses.

2. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

3. Copies of the selected CAP documents.

4. For the specific heat exchangers selected:

a. Copies of the Updated Final Safety Analysis Report (UFSAR) sections

applicable for each heat exchanger.

b. Copy of system description and design basis document for the heat

exchangers (as applicable).

c. Provide the calculations or evaluations that:

i. Establish the limiting design basis heat load required to be

removed by each of these heat exchangers;

ii. Demonstrate the heat exchangers capacity to remove the limiting

heat load;

iii. Correlate surveillance testing and/or inspection results from these

heat exchangers with design basis heat removal capability (e.g.,

basis for surveillance test and/or inspection acceptance criteria);

2

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

iv. Evaluate the potential for water hammer in each heat exchanger

or associated piping; and

v. Evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of

degradation associated with the heat exchangers or the systems that

support the operation for the selected heat exchangers.

e. Copy of the construction code, design specification, heat exchanger data

sheets, and vendor documents including component drawings applicable

for the heat exchangers.

f. Copies of normal, abnormal, and emergency operating procedures

associated with the selected heat exchangers.

g. Copies of the Aging Management Programs (AMP) and the implementing

procedures that manage aging of the selected heat exchangers (as

applicable).

5. For the UHS and the safety-related service water system (or equivalent):

a. Copies of the applicable Updated Final Safety Analysis Report (UFSAR)

sections.

b. Copy of system description and design basis document (as applicable).

c. Copy of any operability determinations or other documentation of

degradation associated with the UHS and the safety-related service

water system.

d. Copy of the document (e.g., UFSAR or Technical Requirements Manual)

that states the maximum cooling water system inlet temperature limit that

still allows full licensed power operation of the nuclear reactor.

e. Copy of the construction code and design specification.

f. Copies of normal, abnormal, and emergency operating procedures

associated with the UHS and safety-related service water systems

including procedures for loss of these systems.

g. Copies of corrective action documents associated with waterhammer or

hydraulic transients in the service water system since the last Heat Sink

Inspection.

h. If available, provide electronic copies of the structural drawings of the

intake structure and UHS.

i. Provide a list of calculations (with a short description), which currently

apply to UHS and safety-related service water system.

3

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

j. Provide a list of instruments (with a short description) associated with

automatic or alarm functions for the safety-related service water system

and/or UHS.

k. Provide a list of any design change (with a short description) performed

on the UHS or safety-related service water system since the last Heat

Sink Performance Inspection.

l. Copies of the AMPs and the implementing procedures that manage aging

of the UHS (including the intake structure) and the safety-related service

and closed cooling water systems (as applicable).

6. A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the on-site portion

of the inspection.

III Information Requested by October 15, 2019

1. For the specific heat exchangers selected.

a. Copies of the two most recent completed tests and evaluation data

confirming thermal performance for those heat exchangers which are

performance tested.

b. Documentation and procedures that identify the types, accuracy, and

location of any special instrumentation used for the two most recently

completed thermal performance tests for the heat exchangers (e.g., high

accuracy ultrasonic flow instruments or temperature instruments).

Include calibration records for the instruments used during these tests.

c. Information regarding any alarms which monitor on-line performance.

d. Copy of the document describing the inspection results of each heat

exchanger. The requested documents are to be for the time period from

the onsite inspection period back to the documents that were provided in

response to the previous Heat Sink Performance Inspection.

e. The cleaning and inspection maintenance schedule for each heat

exchanger for the next 5 years.

f. Copy of the operating procedure that ensures that the maximum cooling

water system inlet temperature limit is not exceeded.

g. Copy of the calculations or documents which evaluate the potential for

water hammer in each heat exchanger or associated piping.

h. The documents that describe the controls that prevent heat exchanger

degradation due to excessive flow induced vibration during operation.

4

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

i. Copy of the periodic flow testing at or near maximum design flow.

The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response

to the previous Heat Sink Performance Inspection.

j. Copy of the document which identifies the current number of tubes in

service for each heat exchanger and the supporting calculation which

establishes the maximum number of tubes which can be plugged in each

heat exchanger.

k. Copy of the document establishing the repair criteria (plugging limit) for

degraded tubes which are identified in each heat exchanger.

l. Copies of the documents that verify the structural integrity of the heat

exchanger (e.g., eddy current summary sheets, ultrasonic testing results,

and visual inspection results).

m. Copies of those documents that describe the methods taken to control

water chemistry in the heat exchangers.

n. Copies of those documents that describe the methods taken to control

water chemistry in the heat exchangers, including those credited by any

AMPs (as applicable).

o. Copies of any credited AMP monitoring/inspection results for the selected

heat exchangers (as applicable). The requested documents are to be for

any completed monitoring/inspection in the time period from the onsite

inspection period back to the documents that were provided in response

to the previous Heat Sink Performance Inspection.

2. For the UHS:

a. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

b. Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability.

The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response

to the previous Heat Sink Performance Inspection.

c. Copies of documents associated with the periodic monitoring and

trending of sediment built-up.

d. Copies of the procedures used for verifying that adjacent non-seismic or

non-safety related structures cannot degrade or block safety-related flow

paths during severe weather or seismic events.

5

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

e. Copies of procedures for the periodic performance monitoring of heat

transfer capacity and the associated results. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

f. Copies of the inspection procedures for the verification of the structural

integrity of the UHS and the associated results. The requested

documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the

previous Heat Sink Performance Inspection.

g. Copy of the calculation associated with the structural integrity of the UHS.

The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response

to the previous Heat Sink Performance Inspection.

3. For the review of the performance testing of the safety-related service water

system (or equivalent) and the UHS:

a. Copies of the last two performance tests, such as the ASME in-service

test, for the selected pumps, valves, and, if applicable, the towers fans

in the safety-related service water system. If the components are not

performance tested, please provide documentation verifying performance

by the methods actually used.

b. Copies of the documents that demonstrate that flow balance testing was

performed during the last 3 years. If the last flow test was performed

longer than 3 years, then provide the last flow test.

c. Copies of the documents that demonstrate that flow balance testing will

continue to be periodically done in the future.

d. Copies of procedures used to monitor interface valves between

the safety-related section of the service water system and the

nonsafety-related section and the associated results. The requested

documents are to be for the time period from the onsite inspection period

back to the documents that were provided in response to the previous

Heat Sink Performance Inspection.

e. Copies of the procedures that verify the performance of risk-significant

non-safety functions and the associated results. The requested

documents are to be for the time period from the onsite inspection period

back to the documents that were provided in response to the previous

Heat Sink Performance Inspection.

4. Copies of any credited AMP monitoring/inspection results for the safety-related

service and closed cooling water systems, and the UHS (as applicable). The

requested documents are to be for any completed monitoring/inspection in the

time period from the onsite inspection period back to the documents that were

provided in response to the previous Heat Sink Performance Inspection.

6

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

If the information requested above will not be available, please contact Vance Petrella as soon

as possible at 630-829-9847 or e-mail Vance.Petrella@nrc.gov.

7