Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML18176A3272018-06-25025 June 2018 R. E. Ginna Nuclear Power Plant - License Amendment Request: Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, Clarification of Rod Position Requirements Project stage: Request ML18197A2262018-06-25025 June 2018 R. E. Ginna Nuclear Power Plant - Acceptance Review: License Amendment Request to Adopt - TSTF-547, Rev 1 Clarification of Rod Position Requirements Project stage: Acceptance Review ML18228A5242018-08-15015 August 2018 R. E. Ginna Nuclear Power Plant - TSTF 547 Adoption, Request for Additional Information (RAI) EPID L-2018-LLA-0179 Project stage: RAI ML18243A1672018-08-29029 August 2018 R. E. Ginna Nuclear Power Plant - Response to Request for Additional Information - License Amendment Request: Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, Clarification of Rod Posit Project stage: Response to RAI ML18295A6302018-10-31031 October 2018 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 131 Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF 547, Clarification of Rod Position Requirements Project stage: Approval ML18309A2632018-11-0909 November 2018 R. E. Ginna Nuclear Power Plant - Correction to Amendment No. 131 Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler 547, Clarification of Rod Position Requirements Project stage: Other 2018-06-25
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator RS-22-084, Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator .2022-06-17017 June 2022 Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator . RS-22-074, Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds .2022-05-20020 May 2022 Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds . ML22118B1432022-04-28028 April 2022 Supplemental Information No. 2 for R.E. Ginna Nuclear Power Plant to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P ML21320A0542021-11-15015 November 2021 R. E. Ginna Nuclear Power Plant - Response to Request for Additional Information - Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.c JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments ML21225A0062021-08-13013 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev.1 and NSAL-15-1, Rev. 0 JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting ML21078A0022021-03-19019 March 2021 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of R. E. Ginna Nuclear Power Plant, License Amendment Request to Modify the Steam Generator Tube Inspection Frequency RS-20-017, Response to Request for Additional Information - Proposed Alternative to Utilize Code Case N-8852021-02-0101 February 2021 Response to Request for Additional Information - Proposed Alternative to Utilize Code Case N-885 ML20248H3882020-09-0404 September 2020 Response to Request for Additional Information - License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System. ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20080N8892020-03-20020 March 2020 R. E. Ginna Nuclear Power Plant, Supplemental Information Associated with the License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 ML18338A2352018-12-0404 December 2018 R. E. Ginna Nuclear Power Plant - Relief Request ISI-18 to Extend the Reactor Pressure Vessel Inservice Inspection Interval ML18243A1672018-08-29029 August 2018 R. E. Ginna Nuclear Power Plant - Response to Request for Additional Information - License Amendment Request: Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, Clarification of Rod Posit NMP1L3221, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R. E. Ginna - Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes.2018-05-10010 May 2018 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R. E. Ginna - Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes. ML17298B4442017-10-25025 October 2017 License Amendment Request - Revised Commitment Associated with Implementation of NFPA 805, 2001 Edition RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-03-13013 March 2017 Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML16336A0482016-11-30030 November 2016 Response to Request for Additional Information for the Review of TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure2016-05-26026 May 2016 Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure ML16042A4212016-02-11011 February 2016 Response to Request for Additional Information Regarding Reactor Internals Program ML16034A1392016-02-0303 February 2016 Response to Request for Additional Information - Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program.. RS-15-288, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-12-0404 December 2015 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident RS-15-255, Response to NRC Audit Review Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report2015-09-30030 September 2015 Response to NRC Audit Review Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report ML18143A4481978-07-28028 July 1978 R. E. Ginna - Response to Letter of 6/21/1978. Additional Information About Standby Auxiliary Feedwater System Attached ML18190A1671978-07-27027 July 1978 R. E. Ginna - Enclosed Copy of Reactor Vessel Fabrication & Inspection Information Requested by Mr. K. G. Hoge. Listed Various Inspection Reports & Dates for Documentation ML18142A6941978-06-15015 June 1978 Steam Generator Water Hammer Prevention ML18143A0291978-04-25025 April 1978 R. E. Ginna - Response to NRC Request Regarding Submittals of 01/16/1978 & 02/15/1978 on the ECCS Analyses for R. E. Ginna Nuclear Power Plant ML18142A7061978-04-0606 April 1978 Forwarding Revision to Tests Described in Applicant'S 03/27/78 Submittal Questions 6.1.E & 6.1.0 Re the Cycle 8 Fuel Reload ML18142B9741978-02-15015 February 1978 R. E. Ginna - 02/15/1978 Response to Request for Additional Information on Adequacy of ECCS Evaluation Model ML18142A8041978-01-18018 January 1978 R. E. Ginna - Enclosed Is Response to Nrc'S Questionnaire of 12/15/1977 Regarding Standby Diesel Generating Units ML18142B9751977-10-31031 October 1977 R. E. Ginna - 10/31/1977 Response to Request for Additional Information Inservice Pump and Valve Testing Program ML18142A8641977-09-13013 September 1977 R. E. Ginna - Response to Request of May 23, 1977 for Additional Information on the Ginna Reactor Vessel Material Surveillance Program ML18142A7191977-08-0404 August 1977 R. E. Ginna - 08/04/1977 Letter Response to Request for Additional Information on Inservice Pump and Valve Testing Program ML18142A8331977-02-24024 February 1977 R. E. Ginna - Fission Gas Release Model ML18142B9771977-02-24024 February 1977 R. E. Ginna - 02/24/1977 Response to Request for Additional Information Reactor Vessel Overpressurization ML18142A8371977-01-19019 January 1977 Forwards Response Letter of 12/17/1976 Requesting Additional Information Regarding Appendix I Evaluation ML18143A9671976-03-23023 March 1976 R. E. Ginna - Plans for Demonstrating Compliance with 10 CFR 50.34a 2022-06-17
[Table view] |
Text
Exelon Generation© 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.90 August 29, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 R. E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRG Docket No. 50-244
Subject:
Response to Request for Additional Information - License Amendment Request:
Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, "Clarification of Rod Position Requirements"
References:
- 1. License Amendment Request: Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, "Clarification of Rod Position Requirements," dated June 25, 2018 (ML18176A327).
- 2. E-mail from V. Sreenivas, Ph.D., C.P.M, NRG Licensing Project Manager, to Jessie Hodge, Exelon, "Ginna -TSTF-547 Adoption, Request for Additional Information (RAI), dated August 15, 2018 (ML18228A524).
By letter dated June 25, 2018 (Reference 1), Exelon Generation Company, LLC (EGG) requested a change to the R. E. Ginna (Ginna) Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, "Clarification of Rod Position Requirements.
By e-mail dated August 15, 2018, (Reference 2), NRG issued a Request for Additional Information. to this letter contains the NRC's RAI as documented in Reference 2 immediately followed by Exelon's response. As previously discussed with Mr. V. Sreenivas, Exelon requests approval of the proposed amendment by September 30, 2018. This will reduce Station vulnerability to unnecessary plant transients due to required shutdown actions if multiple rod position indications in a group become inoperable. Once approved, the amendment shall be implemented within 120 days.
There are no commitments contained in this letter.
Should you have any questions concerning this letter, please contact Enrique Villar at (610) 765-5736.
U.S. Nuclear Regulatory Commission License Amendment Request Revision to Technical Specifications to Adopt Task Force TSTF-547, Revision 1 August29,2018 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 291h of August 2018.
Re;):~JT ~ )yv--
David T. Gudger Manager - Licensing & Regulatory Affairs Exelon Generation Company, LLC
Attachment:
- 1) Response to Request for Additional Information cc: Regional Administrator, NRC Region I NRC Resident Inspector NRC Project Manager A. L. Peterson (NYSERDA)
Attachment 1 Response to Request for Additional Information License Amendment Request: Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, "Clarification of Rod Position Requirements"
U.S. Nuclear Regulatory Commission License Amendment Request Revision to Technical Specifications to Adopt Task Force TSTF-547, Revision 1 August 29, 2018 Page 1 REQUEST FOR ADDITIONAL INFORMATION REQUESTING LICENSE AMENEDMENT REQUEST TO ADOPT TSTF-547, "CLARIFICATION OF ROD POSITION REQUIREMENTS" EXELON GENERSATION COMPANY. LLC R. E. GINNA NUCLEAR POWER PLANT DOCKET NO. 50-244 By application dated June 25, 2018 (Agencywide Documents Access and management System (ADAMS) Accession No. ML18176A327), Exelon Generation Company, LLC (the licensee) submitted a license amendment request (LAA) to revise the R. E. Ginna Nuclear Power Plant (Ginna) Technical Specifications (TSs) by adopting Technical Specifications Task Force (TSTF) change TSTF-547, "Clarification of Rod Position Requirements." The Reactor Systems Branch (SRXB) staff has determined that the following additional information is needed in order to complete its review.
- 1. Condition A in LCO 3.1.5 and LCO 3.1.6 The proposed TS changes would add a new Condition A to limiting Condition for Operation (LCO) 3.1.5, "Shutdown Bank Insertion Limit", and LCO 3.1.6, "Control Bank Insertion Limits".
The proposed Condition A in both LCOs is applicable when one bank is inserted s 8 steps beyond the insertion limit specified in the Core Operating Limits Report. The NRG staff states in its safety evaluation (ADAMS Accession No. ML15328A350) approving TSTF-547 that the bracketed number (16] should be replaced with plant specific minimum number of steps that the rods must be moved to ensure correct performance of Surveillance Requirement (SR) 3.1.4.2.
Provide the plant specific justification for use of s 8 steps in Condition A in LCOs 3.1.5 and 3.1.6 in accordance with the NRC staff SE approving TSTF-547.
Exelon Response:
The proposed change to Ginna Station Technical Specifications (TS) Specification Requirement, SR 3.1.4.2 states:
"Verify rod freedom of movement (trippability) by moving each rod not fully inserted in the core 2:
B steps in either direction."
The 8 steps is Ginna's specific minimum number of steps that rods must be moved to ensure correct performance of the SR 3.1.4.2. One step is equivalent to 0.625 inches A value of "s 8 steps" was selected as the number of allowable steps below the insertion limits specified in the proposed Condition A for LCO 3.1.5 and LCO 3.1.6. The selection of "s 8 steps"
U.S. Nuclear Regulatory Commission License Amendment Request Revision to Technical Specifications to Adopt Task Force TSTF-547, Revision 1 August 29, 2018 Page2 for these LCOs is consistent with the statement in the NRC's Safety Evaluation for TSTF-547 that specifies: "Bracketed number [16] in Condition A should be replaced with plant specific minimum number of steps that the rods must be moved to ensure correct performance of Surveillance Requirement (SR) 3. 1.4.2."
In evaluating the value of 8 steps, the following factors were considered:
- Design of the Microprocessor Rod Position Indication (MRPI) System
- Impact on the intent of the TS 3.1.5 and TS 3.1.6 Design of the Microprocessor Rod Position Indication (MRPI) System The MRPI system provides a highly accurate indication of actual control rod position, but at a lower precision than the step counters. The system consists of one detector assembly with 1O coil pairs (coil stack) for each rod. The detectors are constructed with coils of wire spaced on 7.5-inch centers up the drive rod housing, corresponding to 12 steps of control rod movement.
As the rod is withdrawn into the drive rod housing, it affects the inductance of the coils, creating a large difference in inductance between consecutive coils. A signal from each pair of detector coils is fed into the signal processing cards. Each signal processor independently monitors all rods and senses a rod bottom for any rod. The true rod position as converted from inductance of the coils is always within +/-8 steps of the indicated position (+/-6 steps due to the 12-step interval and +/-2 steps transition uncertainty due to errors arising from linearity, repeatability, long term drift, power source voltage, temperature variations, and coil sensitivity).
Based on this design, each control rod position on the MRPI Cathode Ray Tube (CRT) on the Main Control Board is represented by a bar graph (blue background with yellow fill) and as a control rod is withdrawn, the yellow bar rises against the blue background in 12-step (+/-8 steps) increments. To verify rod position, a change of bar graph height must be observed; i.e.: the bank must be inserted a minimum of ~ 8 steps, as an insertion of less than 8 steps may not result in bar graph height to change. As noted above, the MRPI system is normally accurate to +/-
8 steps of rod position.
It is upon this basis and the statement in the NRC's Safety Evaluation for TSTF-547 that specifies: "Bracketed number [16} in Condition A should be replaced with plant specific minimum number of steps that the rods must be moved to ensure correct performance of Surveillance Requirement (SR) 3. 1.4.2." that 8 steps in Condition A in LCOs 3.1.5 and 3.1.6 is justified.
U.S. Nuclear Regulatory Commission License Amendment Request Revision to Technical Specifications to Adopt Task Force TSTF-547, Revision 1 August 29, 2018 Page3 Impact on the intent of the TS 3.1.5 and TS 3.1.6 The shutdown bank insertion limits (Alls) in Condition A of LCO 3.1.5 are established to ensure that a sufficient amount of negative reactivity is available to shut down the reactor and maintain the required shutdown margin (SOM). The current cycle RIL for shutdown bank is;;:: 220 steps.
As an example, if the shutdown rods are parked at 223 steps, the plant specific procedure directs Operations to move Rods IN from 223 to 212 steps. MRPI transition is normally expected at 217 steps or within the acceptable transition band of 215-219 steps. A review of plant operating experience shows that Ginna station has not been challenged with meeting the acceptable transition band. Therefore, a combination of MRPI design and plant OE provide the basis for the selection of 8 steps as the minimum number of steps that Rods must be moved to ensure correct performance of verification of Rod freedom of movement as well as maintaining the intent of Condition A of LCO 3.1.5 and LCO 3.1.6.
The limits on control banks sequence, overlap, and physical insertion, as defined in the COLA, must be maintained because they serve the function of preserving power distribution, ensuring that the SOM and ejected rod worth are maintained, and ensuring adequate negative reactivity insertion is available on trip. The overlap between control banks provides more uniform rates of reactivity insertion and withdrawal and is imposed to maintain acceptable power peaking during control bank motion.
The proposed change to SR 3.1.4.2 ensures verification of freedom of the shutdown and control rods to move below the LCO limits. The minimum of 8 steps ensure satisfactory completion of SR 3.1 .4.2 while the rods are monitored and controlled during power operation to ensure that safety analyses assumptions for SOM, ejected rod worth, and power distribution power peaking are preserved.
- 2. SR 3.1.4.2 The proposed Ginna SR 3.1.4.2 requires movement of control and shutdown rods a minimum of 8 steps in either direction. The value of 8 steps required for the minimum rod movement is different from the value of 1O steps in the corresponding SR 3.1.4.2 of TSTF-547. Section 2.2 of the LAR dated June 25, 2018 indicated that difference in the values of the minimum required rod movement is due to the differences between Digital Rod Position Indication (DRPI) and Microprocessor Rod Position Indication (MRPI) used in Ginna.
Discuss the determination of the value of 8 steps used in Ginna SR 3.1.4.2 based on Ginna's MRPI, and address acceptability of the use of 8 steps as the minimum rod movement in Ginna SR 3.1.4.
U.S. Nuclear Regulatory Commission License Amendment Request Revision to Technical Specifications to Adopt Task Force TSTF-547, Revision 1 August29,2018 Page4 Exelon Response:
The value of 8 steps used in the Ginna's SR 3.1.4.2 is the minimum number of steps required to see a rod position transition on MRPI, hence successful completion of Surveillance requirement (SR) 3.1.4.2.
The true rod position on MRPI is always within +/-8 steps of the indicated position (+/-6 steps due to the 12-step interval and +/-2 steps transition uncertainty due to errors arising from linearity, repeatability, long term drift, power source voltage, temperature variations, and coil sensitivity).
Using the current cycle RIL for shutdown bank(~ 220 steps) as an example, if the shutdown rods are parked at 223 steps, the plant specific procedure directs Operations to move Rods IN from 223 to 212 steps. MRPI transition is normally expected at 217 steps or within the acceptable transition band of 215-219 steps. Once the MRPI transition is obtained, the bank is moved OUT to its pre-test position. A review of plant operating experience shows that Ginna station has not been challenged with meeting the acceptable transition band. Therefore, a combination of MRPI design and plant OE provide the basis for the selection of 8 steps as the minimum number of steps that Rods must be moved to ensure correct performance of verification of Rod freedom of movement.
- 3. SR 3.1.4.2 and Condition A in LCOs 3.15 and 3.1.6 TSTF-547 uses the different values of 1O steps and [16 steps, a plant specific value] for the required rod movement in SR 3.1.4.2, and Condition A of LCOs 3.15 and 3.1.6, respectively, while Ginna uses the same value of 8 steps for both SR 3.1.4.2 and Condition A in LCOs 3.1.5 and 3.1.6.
Justify the use of the same value of 8 steps in the corresponding Ginna SR and Condition A compared to the different values for SR 3.1.4.2 and Condition A of LCOs 3.1.5 and 3.1.6 respectively approved in the NRC staff SE for TSTF-547.
Exelon Response:
The proposed change to SR 3.1.4.2 states:
"Verify rod freedom of movement (trippability) by moving each rod not fully inserted in the core~
8 steps in either direction."
Specifically, the proposed change to Condition A of LCOs 3.15 and 3.1.6 respectively states:
"Shutdown bank inserted s 8 steps beyond the insertion limit specified in the COLA."
"Control bank A, B, or C inserted s 8 steps beyond the insertion, sequence, or overlap limits specified in the COLR."
The selection for the same value of 8 steps for SR 3.1.4.2 and Condition A of LCOs 3.15 and 3.1.6 is consistent with the statement in the NRC's Safety Evaluation for TSTF-547 that specifies: "Bracketed number [16] in Condition A should be replaced with plant specific
U.S. Nuclear Regulatory Commission License Amendment Request Revision to Technical Specifications to Adopt Task Force TSTF-547, Revision 1 August 29, 2018 Page 5 minimum number of steps that the rods must be moved to ensure correct performance of Surveillance Requirement (SR) 3. 1.4.2." As discussed in responses for question 1 and 2, a minimum of 8 steps has been evaluated based on the design of MRPI and successful completion of SR 3.4.1.2 while the rods are monitored and controlled during power operation to ensure that safety analyses assumptions for SOM, ejected rod worth, and power distribution power peaking are preserved.