Letter Sequence Supplement |
---|
EPID:L-2020-LLA-0031, R. E. Ginna Nuclear Power Plant, License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods (Approved, Closed) |
|
MONTHYEARML20056E9582020-02-25025 February 2020 R. E. Ginna Nuclear Power Plant, License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods Project stage: Request ML20055E4282020-02-26026 February 2020 R. E. Ginna Nuclear Power Plant - Cover Letter with Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License and Opportunity for a Hearing Project stage: Other ML20055E3922020-02-26026 February 2020 R. E. Ginna Nuclear Power Plant - Individual Federal Register Notice Add a One-Time Note for Use of Alternative Residual Heat Removal Loop Project stage: Other ML20066E0402020-03-0505 March 2020 Supplemental Information Associated with the License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods Project stage: Supplement ML20070L0252020-03-10010 March 2020 R. E. Ginna Nuclear Power Plant - Regulatory Audit in Support of License Amendment Request to Support Shutdown of Reactor During Upcoming Refueling Outage Project stage: Other ML20073E2292020-03-12012 March 2020 R. E. Ginna Nuclear Power Plant - Supplemental Information Associated with the License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods Project stage: Supplement ML20077G9742020-03-18018 March 2020 R. E. Ginna Nuclear Power Plant - Summary of March 2, 2020, Meeting Regarding License Amendment Request to Support Shutdown of Reactor During Upcoming Refueling Outage Project stage: Meeting ML20080N8892020-03-20020 March 2020 R. E. Ginna Nuclear Power Plant, Supplemental Information Associated with the License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods Project stage: Supplement ML20085L6882020-04-0202 April 2020 R. E. Ginna Nuclear Power Plant - Summary of Regulatory Audit in Support of Review of License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods Project stage: Approval ML20057E0912020-04-0303 April 2020 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 139 Add a One-Time Note for Use of Alternative Residual Heat Removal Method Project stage: Approval 2020-03-18
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator RS-22-084, Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator .2022-06-17017 June 2022 Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator . RS-22-074, Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds .2022-05-20020 May 2022 Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds . ML22118B1432022-04-28028 April 2022 Supplemental Information No. 2 for R.E. Ginna Nuclear Power Plant to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P ML21320A0542021-11-15015 November 2021 R. E. Ginna Nuclear Power Plant - Response to Request for Additional Information - Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.c JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments ML21225A0062021-08-13013 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev.1 and NSAL-15-1, Rev. 0 JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting ML21078A0022021-03-19019 March 2021 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of R. E. Ginna Nuclear Power Plant, License Amendment Request to Modify the Steam Generator Tube Inspection Frequency RS-20-017, Response to Request for Additional Information - Proposed Alternative to Utilize Code Case N-8852021-02-0101 February 2021 Response to Request for Additional Information - Proposed Alternative to Utilize Code Case N-885 ML20248H3882020-09-0404 September 2020 Response to Request for Additional Information - License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System. ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20080N8892020-03-20020 March 2020 R. E. Ginna Nuclear Power Plant, Supplemental Information Associated with the License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 ML18338A2352018-12-0404 December 2018 R. E. Ginna Nuclear Power Plant - Relief Request ISI-18 to Extend the Reactor Pressure Vessel Inservice Inspection Interval ML18243A1672018-08-29029 August 2018 R. E. Ginna Nuclear Power Plant - Response to Request for Additional Information - License Amendment Request: Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, Clarification of Rod Posit NMP1L3221, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R. E. Ginna - Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes.2018-05-10010 May 2018 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R. E. Ginna - Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes. ML17298B4442017-10-25025 October 2017 License Amendment Request - Revised Commitment Associated with Implementation of NFPA 805, 2001 Edition RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-03-13013 March 2017 Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML16336A0482016-11-30030 November 2016 Response to Request for Additional Information for the Review of TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure2016-05-26026 May 2016 Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure ML16042A4212016-02-11011 February 2016 Response to Request for Additional Information Regarding Reactor Internals Program ML16034A1392016-02-0303 February 2016 Response to Request for Additional Information - Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program.. RS-15-288, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-12-0404 December 2015 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident RS-15-255, Response to NRC Audit Review Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report2015-09-30030 September 2015 Response to NRC Audit Review Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report ML18143A4481978-07-28028 July 1978 R. E. Ginna - Response to Letter of 6/21/1978. Additional Information About Standby Auxiliary Feedwater System Attached ML18190A1671978-07-27027 July 1978 R. E. Ginna - Enclosed Copy of Reactor Vessel Fabrication & Inspection Information Requested by Mr. K. G. Hoge. Listed Various Inspection Reports & Dates for Documentation ML18142A6941978-06-15015 June 1978 Steam Generator Water Hammer Prevention ML18143A0291978-04-25025 April 1978 R. E. Ginna - Response to NRC Request Regarding Submittals of 01/16/1978 & 02/15/1978 on the ECCS Analyses for R. E. Ginna Nuclear Power Plant ML18142A7061978-04-0606 April 1978 Forwarding Revision to Tests Described in Applicant'S 03/27/78 Submittal Questions 6.1.E & 6.1.0 Re the Cycle 8 Fuel Reload ML18142B9741978-02-15015 February 1978 R. E. Ginna - 02/15/1978 Response to Request for Additional Information on Adequacy of ECCS Evaluation Model ML18142A8041978-01-18018 January 1978 R. E. Ginna - Enclosed Is Response to Nrc'S Questionnaire of 12/15/1977 Regarding Standby Diesel Generating Units ML18142B9751977-10-31031 October 1977 R. E. Ginna - 10/31/1977 Response to Request for Additional Information Inservice Pump and Valve Testing Program ML18142A8641977-09-13013 September 1977 R. E. Ginna - Response to Request of May 23, 1977 for Additional Information on the Ginna Reactor Vessel Material Surveillance Program ML18142A7191977-08-0404 August 1977 R. E. Ginna - 08/04/1977 Letter Response to Request for Additional Information on Inservice Pump and Valve Testing Program ML18142A8331977-02-24024 February 1977 R. E. Ginna - Fission Gas Release Model ML18142B9771977-02-24024 February 1977 R. E. Ginna - 02/24/1977 Response to Request for Additional Information Reactor Vessel Overpressurization ML18142A8371977-01-19019 January 1977 Forwards Response Letter of 12/17/1976 Requesting Additional Information Regarding Appendix I Evaluation ML18143A9671976-03-23023 March 1976 R. E. Ginna - Plans for Demonstrating Compliance with 10 CFR 50.34a 2022-06-17
[Table view] |
Text
200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.90 March 20, 2020 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 R. E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244
Subject:
Supplemental Information Associated with the License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods Reference 1. Letter from S. Rafferty-Czincila (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods, dated February 25, 2020
- 2. Letter from S. Rafferty-Czincila (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, Supplemental Information Associated with the License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods, dated March 5, 2020
- 3. Letter from D. Gudger (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, Supplemental Information Associated with the License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods, dated March 12, 2020 In the Reference 1 letter, Exelon Generation Company, LLC (EGC) requested changes to the Technical Specifications (TS) of the R. E. Ginna Nuclear Power Plant (Ginna). EGC proposed to revise TS 3.4.7 (RCS Loops - MODE 5, Loops Filled), TS 3.4.8 (RCS Loops
- MODE 5, Loops Not Filled), TS 3.9.4 ("Residual Heat Removal (RHR) and Coolant Circulation - Water Level 23 Ft"), and TS 3.9.5 ("Residual Heat Removal (RHR) and Coolant Circulation - Water Level < 23 Ft") to add an asterisk to allow the use of alternate means for residual heat removal. This one-time change was requested to support the station in the shutdown of the reactor during the upcoming refueling outage scheduled to start in April 2020. contains additional information based on questions provided during a U.S.
Nuclear Regulatory Commission audit on March 17 and 18, 2020. These issues have been discussed with the audit team. Attachment 2 contains a revised markup of Technical Specifications pages.
Supplemental Information Associated with the License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods March 20, 2020 Page2 EGC has reviewed the information supporting a finding of no significant hazards consideration, and the environmental consideration, that were previously provided to the NRC in the Reference 1 letter. The supplemental information provided in this response does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92. In addition, EGC has concluded that the information provided in this supplemental response does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
- There are no regulatory commitments contained in this submittal. Should you have any questions concerning this submittal, please contact Tom Loomis at (610) 765-5510.
I declare under penalty of perjury that the foregoing is true and correct. This statement was executed on the 20,!h day of March 2020.
Respectfully, JevvJ1. ~)5'1'--
David T. Gudger Senior Manager - Licensing Exelon Generation Company, LLC Attachments: 1) Response to Audit Questions
- 2) Revised Markup of Proposed Technical Specifications Pages cc: NRC Regional Administrator, Region I NRC Senior Resident Inspector, Ginna NRC Project Manager, Ginna A. L. Peterson, NYSERDA I
Attachment 1 Response to Audit Questions
Response to Audit Questions Page 1 Question:
- 1) Information about the basis for the 10% opening of MOV-700, and operation of normal RHR with MOV-700 stuck partially open.
Response
With MOV 700 at least 10 percent open it has been determined that there is adequate RHR pump flow to cooldown the RCS using the normal shutdown cooling flow path. Two RHR pumps would be capable of operating at a combined flow of greater than 2,500 gpm, and a single RHR pump operating alone can exceed 2,000 gpm while the RCS is pressurized above 100 psig. Prior to venting the RCS, a single RHR pump would be left running and the RHR flow would be required to be throttled lower using valves 624 and 625 on the discharge of the RHR heat exchangers. It is normal to run two RHR pumps while the RCS is pressurized and then use only one RHR pump during RCS vented conditions. This is done to maximize NPSH margin and limit the potential for flashing on the suction of the RHR pumps.
Only one pump is required to remove RCP heat and decay heat. The heat removal for the throttled flow rate would be equal to approximately 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> post shutdown, which would allow depressurization and drain down to RCS flange level in less time than it would take to implement the alternative RHR method. If the valve were to stick at a position less than 10%
open, then NPSH could be lost and flashing could occur on the suction of the RHR pump.
Since 700 could not be relied upon as an isolation boundary with the valve partially open, the Alternate RHR Cooling #1 could not be implemented. In the unlikely event that 700 sticks partially open, but less than 10% open, the Alternate RHR Cooling #2 mode from Figure 3 in the LAR would need to be implemented.
Question:
- 2) Information about the updated design (3 inch pipes in parallel) of the alternate RHR cooling, including verification that flow can be established and maintained, and pressure transients for alternate RHR have been evaluated.
- a. What is the minimum required RHR flow in the Alternate RHR Cooling configuration?
- b. Are two RHR pumps required to obtain the minimum RHR flow?
Response
The minimum required flow in the Alternate RHR Cooling configurations is 1,500 gpm. This is based on the flow rate used in the RELAP analysis that demonstrates that the RCS can be vented, depressurized and drained to 84-inches when at least 1,500 gpm of flow is provided through the deluge nozzles. The use of a single RHR pump at this flow rate is adequate to cooldown the RCS to refueling conditions. The updated design, that includes the use of 3-inch pipes run in parallel, was analyzed to determine the minimum number of runs required to meet at least 1,500 gpm from one operating RHR pump at all plant conditions prior to defueling the reactor in the upcoming outage at Ginna. The most limiting condition for flow is when the RCS is vented and drained to reactor vessel flange level (84 RCS level). Under these conditions a single operating RHR pump can recirculate an RCS flow rate of greater than 1,500 gpm without loss of NPSH or flashing in the suction piping with six 3-inch diameter lines installed in parallel. Prior to venting the RCS, two RHR pumps can be operated together to achieve a faster cooldown rate in accordance with existing procedural
Response to Audit Questions Page 2 guidance in the Ginna cooldown procedure O-2.2, if desired. The combined flow rate from two RHR pumps operating in parallel exceeds 2,800 gpm under these conditions.
The temporary alternate RHR piping is being designed to meet the RHR system design pressure of 660 psig. This pressure rating exceeds the peak pressure for shutdown transients caused by either mass addition or an unintentional heat addition. The Ginna analysis for these events determined that the peak pressure in the RHR system would be limited to less than 650 psig on the discharge of the RHR pumps. The temporary piping will be located on the suction of the RHR pumps. The portion of the modification that would be left permanently installed, the 10-inch tees between the MOVs 700/701 and 720/721, are designed to meet the design pressure of that section of piping of 2485 psig.
Question:
- 3) Provide a detailed sequence of events or timeline of how the alternate cooling systems will be placed in service
Response
The plant is cooled down from hot zero power with an average RCS temperature of 547°F using the condenser steam dump valves and atmospheric relief valves (ARVs). Auxiliary feedwater supplies water to the SGs for this cooldown, and an RCP will remain in operation during this time. This will be no different during the upcoming RFO than a normal cooldown.
Once the temperature in the RCS is between 330°F and 350°F the LTOP system is placed in-service, and the normal shutdown cooling RHR system will be attempted to be placed in-service. This includes attempting to open MOV-700.
If MOV-700 cannot be opened at this time (including use of contingency methods), then preparations for installation of the alternate RHR cooling configurations will be enacted. This will include moving materials into containment and setting up rigging scaffolds for being able to cut into the piping to install the tees. Once the piping is adequately cooled the water will be drained from between 700 and 701 and between 720 and 721, and the modification will be installed.
While installation is occurring, the ARVs and AFW will be used to continue cooling the RCS.
An RCP will continue to operate during this time.
Once installation is complete, filling and venting will occur. The plan for filling and venting has not been finalized, yet; however, the modification will require that the piping be at a slope from low to high. The piping will be fit-up without permanent connections to verify proper slope. There are existing high point vents between 700 and 701 and between 720 and 721.
These will allow for a fill and vent from the low point to the high point. Vents will be added as necessary if local high points are identified after permanent connections are made. UT checks will be used to verify the piping is sufficiently full.
Once the system has been readied, the alternate shutdown cooling system will be placed in-service. The expected RCS temperature that this will occur will be between 250°F and 280°F based on the estimated time for installation.
Response to Audit Questions Page 3 The system will be placed in-service similar to the existing system except that 720 and 700 will be left closed, and the valves 852A and 852B will be opened to allow for discharge into the upper plenum of the reactor vessel. An RCP will remain in operation as the system is placed in-service.
Once the alternate RHR system is shown to be operating correctly cooldown will continue into Mode 5 (<200°F). The RCP will remain in operation into Mode 5 such that the Mode 4 Technical Specification 3.4.6 is met with two operable RCS loops and one RCP in operation.
There will be no differences from a normal cooldown and depressurization of the RCS once the alternate RHR system is in-service. At the time when drain down is accomplished in the RCS, there will be different flow limits on the RHR system than the existing drain down procedure. Currently if the RCS is drained to between 100 to 70 inches RHR flow is limited to 3000 gpm, and if less than 70 inches to 30 inches RHR flow is limited to less than or equal to 1400 gpm. During the upcoming RFO, the plan is to drain the RCS to 84 inches (the reactor vessel flange). This level allows for head removal and entering Mode 6 when the cavity can be flooded. While the alternate RHR system is in-service the RCS will not be drained beyond what is required to remove the reactor vessel head and will not enter into Reduced Inventory, which is defined as less than 64 inches, or into mid-loop conditions. If the alternate RHR system is in-service, then the RHR flow will be limited to between 1500 gpm and 1600 gpm as the RCS is drained to 84 inches.
Question:
- 4) Provide a bases for the Technical Specification changes as provided.
Response
Attached are revised markups of proposed Technical Specifications pages. As stated in the original License Amendment Request, due to concerns over the opening of the Motor Operated Valve (MOV) 700 associated with the operation of the Residual Heat Removal (RHR) system, this one-time change is being requested to provide an alternate form of plant cooldown which may be used during the shutdown of the reactor during the upcoming refueling outage scheduled for April 2020.
LCO 3.4.7 (RCS Loops-Mode 5, Loops Filled), LCO 3.4.8 (RCS Loops - MODE 5, Loops Not Filled), LCO 3.9.4 ("Residual Heat Removal (RHR) and Coolant Circulation - Water Level > 23 Ft"), and LCO 3.9.5 ("Residual Heat Removal (RHR) and Coolant Circulation -
Water Level < 23 Ft") have been modified by asterisks to ensure that an alternate RHR loop will allow these actions to be met.
The attached pages have been modified to add a note that:
- Beginning April 1, 2020, an alternate means of RHR as approved in Amendment No.
____ may be used until June 30, 2020. No increase in Mode changes will be permitted while utilizing the alternate approved means of RHR.
This note ensures that the alternate means of RHR, as approved in the Amendment, will be used until June 30, 2020, and that no increase in Mode changes will be permitted while utilizing the alternate approved means of RHR.
Response to Audit Questions Page 4 No Bases changes are associated with this one-time change. Justification for these changes has been supplied in the letters referenced in the cover letter. No Technical Specification Bases pages are being made as a result of this one-time change that expires on June 30, 2020. The basis for this change remains in compliance with 10 CFR 50.36. This supplement is also deleting pages that were previously supplied for information.
Attachment 2 Revised Markup of Proposed Technical Specifications Pages TECHNICAL SPECIFICATIONS PAGES 3.4.7-1 3.4.8-1 3.9.4-1 3.9.5-1
RCS Loops - MODE 5, Loops Filled 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 RCS Loops - MODE 5, Loops Filled LC03.4.7 One residual heat removal (AHR) loop shall be OPERABLE and in operation, and either: * *
- a. One additional AHR loop shall be OPERABLE; or
- b. The secondary side water level of at least one steam generator (SG) shall be;;::: 16%.
-NOTE-
- 1. The AHR pump of the loop in operation may be de-energized for
~ 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period provided:
- a. No operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SOM of LCO 3.1.1; and
- b. Core outlet temperature is maintained at least 10°F below saturation temperature.
- 2. One required RHR loop may be inoperable for~ 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided that the other RHR loop is OPERABLE and in operation.
- 3. No reactor coolant pump shall be started with one or more RCS cold leg temperatures less than or equal to the LTOP enable temperature specified in the PTLR unless:
- a. The secondary side water temperature of each SG is ~ 50°F above each of the RCS cold leg temperatures; or
- b. The pressurizer water volume is < 324 cubic feet (38% level).
- 4. All AHR loops may be removed from operation during planned heatup to MODE 4 when at least one RCS loop is in operation.
APPLICABILITY: MODE 5 with RCS loops filled.
- Beginning April 1, 2020, an alternate means of RHR as approved in Amendment No. ____ may be used until June 30, 2020. No increase in Mode changes will be permitted while utilizing the alternate approved means of RHR.
R.E. Ginna Nuclear Power Plant 3.4.7-1 Amendment 118
RCS Loops - MODE 5, Loops Not Filled 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 RCS Loops - MODE 5, Loops Not Filled LC03.4.8 Two residual heat removal (AHR) loops shall be OPERABLE and one RHR loop shall be in operation. *
-NOTE-
- 1. All AHR pumps may be de-energized for s 15 minutes when switching from one loop to another provided:
- a. No operations are permitted that would cause introduction of coolant into the RCS with boron concentration less than required to meet the SOM of LCO 3.1.1; and
- b. Core outlet temperature is maintained at least 10°F below saturation temperature; and
- c. No draining operations to further reduce the RCS water volume are permitted.
- 2. One AHR loop may be inoperable for~ 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided that the other AHR loop is OPERABLE and in operation.
APPLICABILITY: MODE 5 with RCS loops not filled.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One AHR loop A.1 Initiate action to restore Immediately inoperable. AHR loop to OPERABLE status.
B. Both AHR loops B.1 Suspend operations that Immediately inoperable. would cause introduction of coolant into the RCS with OR boron concentration less than required to meet the No AHR loop in SOM of LCO 3.1.1.
operation.
AND
- Beginning April 1, 2020, an alternate means of RHR as approved in Amendment No. ____ may be used until June 30, 2020. No increase in Mode changes will be permitted while utilizing the alternate approved means of RHR.
R.E. Ginna Nuclear Power Plant 3.4.8-1 Amendment 118
RHR and Coolant Circulation - Water Level;;:: 23 Ft 3.9.4 3.9 REFUELING OPERATIONS 3.9.4 Residual Heat Removal (RHR) and Coolant Circulation - Water Level ~ 23 Ft LCO 3.9.4 One RHR loop shall be OPERABLE and in operation.
- NOTE-The required RHR loop may be removed from operation for~ 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would cause introduction of coolant into the Reactor Coolant System (RCS) with boron concentration less than that required to meet the minimum required boron concentration of LCO 3.9.1.
APPLICABILITY: MODE 6 with the water level ~ 23 ft above the top of reactor vessel flange.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RHR loop requirements A.1 Suspend operations that Immediately not met. would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.
A.2 Suspend loading irradiated Immediately fuel assemblies in the core.
A.3 Initiate action to satisfy RHR Immediately loop requirements .
- Beginning April 1, 2020, an alternate means of RHR as approved in Amendment No. ____ may be used until June 30, 2020. No increase in Mode changes will be permitted while utilizing the alternate approved means of RHR.
R.E. Ginna Nuclear Power Plant 3.9.4-1 Amendment 118
AHR and Coolant Circulation - Water Level< 23 Ft 3.9.5 3.9 REFUELING OPERATIONS 3.9.5 Residual Heat Removal (AHR) and Coolant Circulation - Water Level< 23 Ft LCO 3.9.5 Two AHR loops shall be OPERABLE, and one AHR loop shall be in operation.
APPLICABILITY: MODE 6 with the water level < 23 ft above the top of reactor vessel flange.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Less than the required A.'I Initiate action to restore Immediately number of AHR loops AHR loop(s) to OPERABLE OPERABLE. status.
OR A.2 Initiate action to establish Immediately
~ 23 ft of water above the top of reactor vessel flange.
B. No RHR loop in B.'I Suspend operations that Immediately operation. would cause introduction of coolant into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.'I.
AND B.2 Initiate action to restore one Immediately AHR loop to operation.
AND B.3 Close all containment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetrations providing direct access from containment to outside atmosphere.
- Beginning April 1, 2020, an alternate means of RHR as approved in Amendment No. ____ may be used until June 30, 2020. No increase in Mode changes will be permitted while utilizing the alternate approved means of RHR.
R.E. Ginna Nuclear Power Plant 3.9.5-'I Amendment 1'18