MONTHYEARML18108A0222018-05-24024 May 2018 Issuance of Amendment to Revise Technical Specifications 5.5.7 Ventilation Filter Testing Program (Vftp), to Be Consistent with Standard Technical Specifications Project stage: Approval 2018-05-24
[Table View] |
Similar Documents at Fermi |
---|
Category:Letter
MONTHYEARIR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval ML23276B4542023-10-0505 October 2023 Cyber Security Inspection Report 05000341/2023402 ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23248A2242023-09-0707 September 2023 Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer Performance ML23223A2242023-08-29029 August 2023 Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) ML23237B4332023-08-25025 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000341/20230052023-08-24024 August 2023 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23219A1792023-08-0707 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant, Unit 2 IR 05000341/20230022023-08-0404 August 2023 Integrated Inspection Report 05000341/2023002 ML23216A1872023-08-0404 August 2023 Submittal of Relief Request RR-A25 for Extended License Period ML23206A1272023-07-26026 July 2023 NOED for Fermi Power Plant, Unit Two Technical Specification 3.7.2, Emergency Equipment Cooling Water Emergency Equipment Service Water System and Ultimate Heat Sink ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis IR 05000341/20230012023-06-28028 June 2023 Integrated Inspection Report 05000341/2023001 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements IR 05000341/20220102023-06-21021 June 2023 Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23158A1332023-06-0808 June 2023 Notice of Enforcement Discretion (NOED) for Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/ Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink ML23130A1032023-05-17017 May 2023 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency IR 05000341/20234022023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23118A3612023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23114A1172023-05-0101 May 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23115A4152023-04-25025 April 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML23124A2032023-04-10010 April 2023 DTE Electric Company Submittal of Fermi 3 Periodic Reports ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter IR 05000341/20230112023-04-0606 April 2023 Triennial Fire Protection Inspection Report 05000341/2023011 IR 05000341/20234012023-03-17017 March 2023 Security Baseline Inspection Report 05000341/2023401 ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 IR 05000341/20220062023-03-0101 March 2023 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22325A2992023-02-24024 February 2023 Audit Plan in Support of Review of License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency ML23039A1552023-02-14014 February 2023 Integrated Inspection Report 05000341/2022004 IR 05000341/20224032023-02-13013 February 2023 Security Baseline Inspection Report 05000341/2022403 ML23200A2162023-01-20020 January 2023 Outline Submittal Letter 2024-02-05
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21335A2802022-04-0707 April 2022 Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes ML21147A1672021-06-11011 June 2021 Issuance of Amendment No. 221 Regarding Revision of Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-563 ML21029A2542021-05-24024 May 2021 Issuance of Amendment No. 220 - Revision to Technical Specifications to Utilize Neutron Absorbing Inserts in Criticality Safety Analysis for Spent Fuel Pool Storage Racks (Non-Proprietary) ML21098A0452021-04-26026 April 2021 Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt TSTF-529 ML20358A1552021-02-24024 February 2021 Issuance of Amendment No. 218, Revision to Technical Specifications to Change Certain Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML20294A0352020-12-22022 December 2020 Issuance of Amendment No. 217 - Revision to Technical Specifications for Secondary Containment Surveillance Requirements ML20233A8382020-10-0505 October 2020 Issuance of Amendment No. 216 - Revision to Technical Specification in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 ML20094G8142020-04-0808 April 2020 Audit Plan in Support of the Review of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML19288A0732019-12-18018 December 2019 Issuance of Amendment No. 215 Revision to Technical Specification 3.3.5.3 ML19189A0042019-11-0505 November 2019 Issuance of Amendment Technical Specifications Task Force (TSTF)-564 Safety Limit Minimum Critical Power Ratio ML18306A4512019-01-0707 January 2019 Issuance of Amendment Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML18250A1632018-09-20020 September 2018 Issuance of Amendment No. 212 Elimination of Main Steam Line Radiation Monitor Trip and Isolation Function (CAC No. MG0228; EPID L-2017-LLA-0274) ML18247A4522018-09-17017 September 2018 Issuance of Amendment Revision to Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF 542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0208; EPID L-2017-LLA-0282) ML18165A2022018-09-13013 September 2018 Issuance of Amendment Regarding the Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML18144A0642018-07-17017 July 2018 Issuance of Amendment to Revise Technical Specification Section 3.7.2, Emergency Equipment Cooling Water/Emergency Equipment Service Water System and Ultimate Heat Sink ML18108A0222018-05-24024 May 2018 Issuance of Amendment to Revise Technical Specifications 5.5.7 Ventilation Filter Testing Program (Vftp), to Be Consistent with Standard Technical Specifications ML17128A3162017-11-29029 November 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Process ML17076A0272017-04-14014 April 2017 Issuance of Amendment to Revise High Pressure Coolant Injection System and Reactor Core Isolation Cooling System Actuation Instrumentation Technical Specifications ML17074A1092017-03-16016 March 2017 Corrections to Amendment No. 205 Regarding Type a and C Testing ML16351A4602017-03-0909 March 2017 Issuance of Amendment to Extend Containment Leakage Test Frequency ML16270A5262016-12-15015 December 2016 Fermi 2, Renewed Facility Operating License NPF-43 ML16069A0062016-04-20020 April 2016 Issuance of Amendment Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation ML16054A6372016-04-0505 April 2016 Issuance of Amendment to Revise License Amendment Request to Revise Technical Specification Section 3.5.1, Emergency Core Cooling System - Operating Report ML15233A0842015-09-29029 September 2015 Issuance of Amendment License Amendment Request to Revise the Emergency Action Level Scheme for the Fermi Emergency Plan ML15155B4162015-07-14014 July 2015 Ferm, Uniti 2 - Issuance of Amendment Revise Technical Specifications by Relocating Surveillance Frequencies to Licensee Control in Accordance with Technical Specification Task Force Traveler 425, Revision 3 ML15096A0432015-05-0707 May 2015 Issuance of Amendment Cyber Security Plan Implementation Schedule (Tac No. MF4366) ML15057A2972015-03-16016 March 2015 Issuance of Amendment License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries (Tac No. MF4002) ML14016A4872014-03-10010 March 2014 Issuance of Amendment Revise the Fermi 2 Licensing Basis Concerning Protection from Tornado-Generated Missiles ML13364A1312014-02-10010 February 2014 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate ML13346B0672014-02-0404 February 2014 Issuance of Amendment Relocation of Pressure and Temperature Curves to a Pressure Temperature Limits Report ML13309A5942014-01-17017 January 2014 Issuance of Amendment to Adopt TSTF-423 Revision 1 Technical Specifications End States, NEDC-32988-A ML13204A1152013-08-0808 August 2013 Attachment 2 - Fermi 1, Amendment 21 to Operating License ML13164A2502013-07-12012 July 2013 Issuance of Amendment to Change Licensee Name on the Operating License ML13112A1422013-05-13013 May 2013 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522, Using Consolidated Line Item Improvement Process ML12207A5042012-08-29029 August 2012 Issuance of Amendment for Adoption of TSTF-306 ML1135004332012-02-24024 February 2012 Issuance of Amendment 188 TSTF-50, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML1124504642011-09-23023 September 2011 Issuance of Amendment Staff Augmentation Times During Radiological Emergencies ML1122109312011-08-26026 August 2011 License Amendment 186, Reactor Coolant System Leakage ML1119202212011-07-28028 July 2011 License Amendment, Cyber Security Plan ML1036304352011-01-24024 January 2011 License Amendment, Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests ML1027703822010-10-20020 October 2010 Issuance of Amendment to Revise Degraded Voltage Function to Reflect Modification ML1013408612010-05-15015 May 2010 Issuance of Emergency Amendment Regarding Onetime Extension of the Completion Time in Technical Specification 3.7.3, Control Room Emergency Filtration (CREF) System, Condition B ML0913906462009-06-19019 June 2009 License Amendment, Issuance of Amendment Removal of Statements Related to Nuclear Power Plant Staff Working Hours in Technical Specifications ML0812705642008-06-25025 June 2008 Issuance of Amendment 180 Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirements ML0814904202008-06-23023 June 2008 Issuance of Amendment 179 Control Rod Notch Surveillance Test Frequency - TSTF-475 2023-09-18
[Table view] Category:Safety Evaluation
MONTHYEARML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21335A2802022-04-0707 April 2022 Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes ML21253A0102021-10-15015 October 2021 Revised Relief Request RR-A39 for the Fourth 10-Year Inservice Inspection Interval ML21147A1672021-06-11011 June 2021 Issuance of Amendment No. 221 Regarding Revision of Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-563 ML21029A2542021-05-24024 May 2021 Issuance of Amendment No. 220 - Revision to Technical Specifications to Utilize Neutron Absorbing Inserts in Criticality Safety Analysis for Spent Fuel Pool Storage Racks (Non-Proprietary) ML21098A0452021-04-26026 April 2021 Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt TSTF-529 ML21036A0822021-03-12012 March 2021 Relief Request RR-A42 for Inservice Inspection Impracticality During the Third 10-Year Inservice Inspection Interval ML20358A1552021-02-24024 February 2021 Issuance of Amendment No. 218, Revision to Technical Specifications to Change Certain Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML20294A0352020-12-22022 December 2020 Issuance of Amendment No. 217 - Revision to Technical Specifications for Secondary Containment Surveillance Requirements ML20233A8382020-10-0505 October 2020 Issuance of Amendment No. 216 - Revision to Technical Specification in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 ML20169A6522020-07-0808 July 2020 Revised Valve Relief Request VRR-004 for the Inservice Testing Program Fourth 10-Year Interval ML20034F7842020-02-0707 February 2020 Issuance of Relief Proposed Alternative Requests Nos. VRR-010 and VRR-011 Associated with Fourth Ten Year Interval Inservice Testing of Various Valves ML20014E7312020-01-24024 January 2020 Issuance of Relief Proposed Alternative Request Nos. VRR-002, VRR-003, VRR-006, VRR-008, and VRR-009 Associated with Fourth Ten Year Interval Inservice Testing of Various Valves (EPID L-2019-LLR-0048, EPID L-2019-LLR-0049 ML19336A0062020-01-10010 January 2020 Issuance of Relief Proposed Alternative Request Nos. PRR-001 and PRR-004 Associated with Fourth Ten Year Interval Pump Inservice Testing Program (EPID L-2019-LLR-0038 and EPID L-2019-LLR-0041) ML19288A0732019-12-18018 December 2019 Issuance of Amendment No. 215 Revision to Technical Specification 3.3.5.3 ML19267A0272019-10-0303 October 2019 Proposed Alternative to the Required Examination Associated with Snubbers ML19248C7072019-10-0303 October 2019 Proposed Alternative to the Required Examination Associated with Valves Examination ML19183A4722019-08-19019 August 2019 Relief from the Requirements of the American Society of Mechanical Engineers Code ML19183A0232019-07-31031 July 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 ML19204A2532019-07-20020 July 2019 Relief from the Requirements of the ASME Code ML19171A3572019-06-27027 June 2019 Relief from the Requirements of the ASME Code PRR-002 and PRR-003 ML19169A3152019-06-26026 June 2019 2. - Relief from the Requirements of the ASME Code ML19143A2192019-06-13013 June 2019 Relief from the Requirements of the ASME Code ML18306A4512019-01-0707 January 2019 Issuance of Amendment Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML18250A1632018-09-20020 September 2018 Issuance of Amendment No. 212 Elimination of Main Steam Line Radiation Monitor Trip and Isolation Function (CAC No. MG0228; EPID L-2017-LLA-0274) ML18165A2022018-09-13013 September 2018 Issuance of Amendment Regarding the Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML18144A0642018-07-17017 July 2018 Issuance of Amendment to Revise Technical Specification Section 3.7.2, Emergency Equipment Cooling Water/Emergency Equipment Service Water System and Ultimate Heat Sink ML18096A6142018-06-0505 June 2018 Relief from the Requirements of the ASME Code ML18108A0222018-05-24024 May 2018 Issuance of Amendment to Revise Technical Specifications 5.5.7 Ventilation Filter Testing Program (Vftp), to Be Consistent with Standard Technical Specifications ML17354B0022018-03-0707 March 2018 Relief from the Requirement of the ASME OM Code (CAC No. MG0070; EPID L-2017-LLR-0079) ML18003A2102018-03-0707 March 2018 Relief from the Requirements of the ASME OM Code (CAC No. MG0119; EPID L-2017-LLR-0082) ML17128A3162017-11-29029 November 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Process ML17076A0272017-04-14014 April 2017 Issuance of Amendment to Revise High Pressure Coolant Injection System and Reactor Core Isolation Cooling System Actuation Instrumentation Technical Specifications ML16351A4602017-03-0909 March 2017 Issuance of Amendment to Extend Containment Leakage Test Frequency ML16357A2802017-01-18018 January 2017 Relief from the Requirements of the ASME Code ML16258A0402016-09-29029 September 2016 Fermi, Unit 2 - Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 (CAC Nos. MF0770 and MF0771) ML16230A5082016-09-23023 September 2016 Revised Relief Request No. PRR-007 for the Inservice Testing Program Third10-year Interval (CAC No. Mf7573) ML16069A0062016-04-20020 April 2016 Issuance of Amendment Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation ML16054A6372016-04-0505 April 2016 Issuance of Amendment to Revise License Amendment Request to Revise Technical Specification Section 3.5.1, Emergency Core Cooling System - Operating Report ML15233A0842015-09-29029 September 2015 Issuance of Amendment License Amendment Request to Revise the Emergency Action Level Scheme for the Fermi Emergency Plan ML15218A3602015-08-24024 August 2015 Inservice Testing Program Relief Request PRR-012 for Quarterly Test of Core Spray Pumps (Tac No. MF5816) ML15155A5062015-07-29029 July 2015 Request for Use of Mururoa Supplied Air Suits Models MTH2, V4F1 and Blu Suit Systems ML15155B4162015-07-14014 July 2015 Ferm, Uniti 2 - Issuance of Amendment Revise Technical Specifications by Relocating Surveillance Frequencies to Licensee Control in Accordance with Technical Specification Task Force Traveler 425, Revision 3 ML15096A0432015-05-0707 May 2015 Issuance of Amendment Cyber Security Plan Implementation Schedule (Tac No. MF4366) ML15057A2972015-03-16016 March 2015 Issuance of Amendment License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries (Tac No. MF4002) ML14176A9292014-07-16016 July 2014 Alternative Request PVRR-001 Concerning the Third 10-Year Inservice Testing Program 2023-09-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 24, 2018 Mr. Keith J. Polson Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 260 TAC 6400 North Dixie Highway Newport, Ml 48166
SUBJECT:
FERMI 2 - ISSUANCE OF AMENDMENT TO REVISE TECHNICAL SPECIFICATIONS 5.5.7, "VENTILATION FILTER TESTING PROGRAM (VFTP)," TO BE CONSISTENT WITH STANDARD TECHNICAL SPECIFICATIONS (CAC NO. MG0104, EPID L-2017-LLA-0271)
Dear Mr. Polson:
The U.S. Nuclear Regulatory Commission (NRC or Commission) has issued the enclosed Amendment No. 208 to Renewed Facility Operating License No. NPF-43 for the Fermi 2 facility.
The amendment is in response to your application dated August 14, 2017, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17226A277).
The amendment modifies Fermi 2 Technical Specifications 5.5.7, "Ventilation Filter Testing Program (VFTP)" by adopting the format and language of NUREG-1433, "Standard Technical Specifications for General Electric BWR/4 Plants," Revision 4.
A copy of our safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely, s~ ~~-
etz, Pr ect M nager Pia nsing ranch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341
Enclosures:
- 1. Amendment No. 208 to NPF-43
- 2. Safety Evaluation cc w/encls: Listserv
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-43 is hereby amended to read as follows:
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 208, and the Environmental Protection Plan contained in Appendix 8, are hereby incorporated into this renewed license. DTE Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION OJ q v~
David J. Wron{-Chief Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License and Technical Specifications Date <?f Issuance: May 2 4 , 2 o18
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 DTE ELECTRIC COMPANY DOCKET NO. 50-341 FERMI 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 208 License No. NPF-43
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the DTE Electric Company (DTE, the licensee) dated August 14, 2017, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
ATTACHMENT TO LICENSE AMENDMENT NO. 208 FERMI 2 FACILITY OPERATING LICENSE NO. NPF-43 DOCKET NO. 50-341 Replace the following pages of the Facility Operating License and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 4 4 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT 5.0-12 5.0-12 5.0-13 5.0-13 5.0-14 5.0-14
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 208, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this renewed license. DTE Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Antitrust Conditions DTE Electric Company shall abide by the agreements and interpretations between it and the Department of Justice relating to Article I, Paragraph 3 of the Electric Power Pool Agreement between DTE Electric Company and Consumers Power Company as specified in a letter from The Detroit Edison Company to the Director of Regulation, dated August 13, 1971, and the letter from Richard W. McLaren, Assistant Attorney General, Antitrust Division, U.S. Department of Justice, to Bertram H. Schur, Associate General Counsel, Atomic Energy Commission, dated August 16, 1971.
(4) Deleted (5) Deleted (6) Deleted (7) Deleted (8) Deleted (9) Modifications for Fire Protection (Section 9.5.1, SSER #5 and SSER #6}*
DTE Electric Company shall implement and maintain in effect all provisions of the approved fire protection program as described in its Final Safety Analysis Report for the facility through Amendment 60 and as approved in the SER through Supplement No. 5, subject to the following provision:
(a) DTE Electric Company may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report (SER) and/or its supplements wherein the license condition is discussed.
Renewed License No. NPF-43 Amendment 208
Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.7 Ventilation Filter Testing Program (VFTP)
A program shall be established to implement the following required testing of Engineered Safety Feature (ESF) filter ventilation systems at the frequencies specified in Regulatory Guide 1.52, Revision 2, and in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1980.
- a. Demonstrate for each of the ESF systems that an inplace test of the HEPA filters shows a penetration and system bypass<
specified below when tested in accordance with Regulatory Guide 1.52, Revision 2. and ASME N510-1980 at the system flowrate specified below+/- 10%.
Penetration and ESF Ventilation System Flowrate (cfm) System Bypass Standby Gas Treatment 3800 0.05%
Control Room Emergency 1800 (makeup filter) 1.0%
Filtration 3000 (recirculation filter)
- b. Demonstrate for each of the ESF systems that an inplace test of the charcoal adsorber shows a penetration and system bypass< specified below when tested in accordance with Regulatory Guide 1.52, Revision 2. and ASME N510-1980 at the system flowrate specified below+/- 10%.
Penetration and ESF Ventilation System Flowrate (cfm) System Bypass Standby Gas Treatment 3800 0.05%
Control Room Emergency 1800 (makeup filter) 1.0%
Filtration 3000 (recirculation filter)
(continued)
FERMI - UNIT 2 5.0-12 Amendment No. +/-J4. 208
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.7 Ventilation Filter Testing Program (VFTP) (continued)
- c. Demonstrate for each of the ESF systems that a laboratory test of a sample of the charcoal adsorber. when obtained as described in Regulatory Guide 1.52, Revision 2. shows the methyl iodide penetration less than the value specified below when tested in accordance with ASTM 03803-1989 at a temperature of 30°C (86°F) and the relative humidity specified below.
ESF Ventilation System Penetration RH Standby Gas Treatment 0.100% 70%
Control Room Emergency 1.0% 70%
Filtration
- d. Demonstrate for each of the ESF systems that the pressure drop across the combined HEPA filters. the prefilters. and the charcoal adsorbers is less than the value specified below when tested in accordance with Regulatory Guide 1.52, Revision 2. and ASME N510-1980 at the system flowrate specified below+/- 10%.
Delta P Flowrate ESF Ventilation System (inches water gauge) (cfm)
Standby Gas Treatment 11.0 3800 Control Room Emergency 3.0 (makeup train) 1800 Filtration (CREF) 4.2 (recirculation 3000 train)
(continued)
FERMI - UNIT 2 5.0-13 Amendment No. +/-J4, 208
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.7 Ventilation Filter Testing Program (VFTP) (continued)
- e. Demonstrate that the heaters for each of the ESF systems dissipate the value specified below when tested in accordance with ASME N510-1980.
ESF Ventilation System Wattage (kW)
Standby Gas Treatment : : 24 Control Room Emergency 12.0 +/- 2.0 Makeup Inlet Air The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the VFTP test frequencies.
(continued)
FERMI - UNIT 2 5.0-14 Amendment No. +/-J4, ~ . 208
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 208 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-43 DTE ELECTRIC COMPANY FERMI 2 DOCKET NO. 50-341
1.0 INTRODUCTION
By application dated August 14, 2017, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17226A277), DTE Electric Company (DTE, or the licensee), submitted a license amendment request for Fermi 2. The amendment modifies Fermi 2 technical specification (TS) 5.5.7, "Ventilation Filter Testing Program (VFTP)" by adopting the format and language of NUREG-1433, "Standard Technical Specifications [STS]
for General Electric BWR/4 Plants," Revision 4, (April 2012) (ADAMS Accession No. ML12104A192). Specifically, the amendment inserts new text supported by the current licensing basis and STS as well as removing redundant testing frequency statements.
2.0 REGULATORYEVALUATION
The standby gas treatment (SGT) system consists of two separate and parallel 100 percent capacity equipment and filter trains. On detection of radioactivity or conditions that could lead to a release of radioactivity, the SGT system functions to minimize the release related offsite dose rates by permitting the venting and purging of both the primary and secondary containment atmospheres under accident or abnormal conditions, and at the same time containing any airborne particulate or halogen contamination that might be present. Each SGT equipment train consists of a moisture separator, a prefilter, an electric heater, a high efficiency particulate air (HEPA) filter, a charcoal adsorber, a second HEPA filter, an exhaust fan, and a cooling air fan installed in parallel with the exhaust fan.
The control room emergency filtration (CREF) system provides a protected environment from which occupants can control the unit following an uncontrolled release of radioactivity, hazardous chemicals, or smoke. CREF is a single system that performs its safety function with redundant active components and nonredundant passive components, including a control room envelope boundary that limits the inleakage of unfiltered air. The CREF system is designed to maintain a habitable environment in the control room envelope for a 30-day continuous occupancy after a design basis accident without exceeding 5 rem total effective dose Enclosure 2
equivalent. During emergency operation of CREF, two emergency filter trains are automatically put in operation. The emergency makeup filter train consists of a mist eliminator, redundant divisional electric heater, a HEPA filter, a 2-inch deep charcoal adsorber, and a second HEPA filter. The emergency recirculation filter train consists of a prefilter, a HEPA filter, a 4-inch deep charcoal adsorber, and a second HEPA filter. Air is drawn through these emergency filters by one of two redundant divisional emergency recirculation air fans.
The VFTP described in TS 5.5. 7 establishes the required testing of engineered safety feature (ESF) filter ventilation systems, specifically, the SGT and the CREF systems in accordance with Regulatory Guide (RG) 1.52, Revision 2, and the American Society of Mechanical Engineers (ASME) N510-1980. The existing format for the VFTP description in TS 5.5.7 was established during the licensee's TS conversion to NUREG-1433, "Standard Technical Specifications General Electric Plants, BWR/4," Revision 1, (April 1995) (ADAMS Accession No. ML13196A477).
3.0 TECHNICAL EVALUATION
3.1 Technical Specifications and Changes Title 10 of the Code of Federal Regulations ( 10 CFR) 50.36 (b) states, in part:
The technical specifications will be derived from the analyses and evaluation included in the safety analysis report, and amendments thereto, submitted pursuant to §50.34.
10 CFR 50.36 (c)(5), "Administrative controls" states:
Administrative controls are the provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner.
The U.S. Nuclear Regulatory Commission's (NRC or Commission) "Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors" was published in the Federal Register on July 22, 1993, (58 FR 39132). In reference to the four criteria listed in 10 CFR 50.36(c)(2)(ii), the policy states: "LCOs [limiting conditions for operations] which do not meet any of the criteria below may be proposed for removal from the Technical Specifications and relocation to licensee-controlled documents, such as the FSAR [final safety analysis report.)" The policy statement further states:
If a licensee elects to apply these criteria, the requirements of the removed specifications will be relocated to the FSAR or other licensee-controlled documents. Licensees are to operate their facilities in conformance with the descriptions of their facilities and procedures in their FSAR. Changes to the facility or to procedures described in the FSAR are to be made in accordance with 10 CFR 50.59.
The NRC's current guidance for the format and content of licensee TSs can be found in NUREG-1433, "Standard Technical Specifications [STS] General Electric Plants, BWR/4."
3.2 Standard Technical Specification The licensee proposed adopting the STS format and content for Fermi 2 TS 5.5.7. Specifically, the licensee proposed changes that would revise the first sentence of TS 5.5.7 from, "The VFTP
shall establish the required testing of Engineered Safety Feature (ESF) filter ventilation systems," to "A program shall be established to implement the following required testing of Engineered Safety Feature (ESF) filter ventilation systems at the frequencies specified in Regulatory Guide 1.52, Revision 2, and in accordance with Regulatory Guide 1.52, Revision 2, and ASME N510-1980." The licensee also proposed deleting "The following tests shall be performed:" and the associated detailed listing of the four performance frequencies for TS 5.5.7, parts a, b, and c. The licensee also proposed deleting the sentence, "The following tests shall be performed once per 18 months" from TS 5.5.7, parts d and e.
While the proposed adoption of STS formatting and content for the TS 5.5.7 results in a closer alignment between the Fermi 2 TS and the current version of the STS, it also results in the deletion of testing requirements. First, the requirements in TS 5.5. 7a to test the HEPA filters after charcoal adsorber bank replacement and the TS 5.5. 7b requirement to test the charcoal adsorber after HEPA filter bank replacement would no longer appear in the Fermi 2 TS. The licensee provided justification for this deletion:
... these tests are not required by Regulatory Guide 1.52, Revision 2, or ASME N510-1980. The elimination of this testing requirement is justified since the HEPA filters would not be affected by a complete or partial replacement of the charcoal adsorber bank and the charcoal adsorber would not be affected by a complete or partial replacement of the HEPA filter bank.
The deletion of the sentence, "The following tests shall be performed once per 18 months." from TS 5.5. 7, parts d and e, eliminate the detail of the testing frequencies for those parts. The licensee provided the following justification for the removal:
The removal of the testing performance frequency details from TS 5.5. 7 is acceptable because this type of information is not necessary to be included in the TS to provide adequate protection of public health and safety. The TS still retain the requirements to perform tests on the ventilation filters on a frequency and in a manner consistent with Regulatory Guide 1.52, Revision 2, and SR [surveillance requirement] 3.0.1. Also, this change is acceptable because these types of procedural details will be adequately controlled in [the] VFTP. The adequacy of the VFTP will be maintained in accordance with 10 CFR 50.59.
The NRC staff reviewed the proposed changes and the licensee's justifications for the changes.
The staff determined that TS 5.5.7, as modified by the proposed changes, will continue to meet the regulatory requirements of 10 CFR 50.36(c)(5) because removal of the requirements to test HEPA filters after charcoal adsorber replacement and vice versa is not necessary to provide assurance of safe facility operation. Likewise, deletion of the testing frequency detail is acceptable because the details will be still be retained in the VFTP. The staff determined that the licensee will also meet the intent of NRC's "Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors" for removal of TS requirements because the licensee controlled VFTP will contain the required information related to the information being removed from the TS and changes to the VFTP will be made in accordance with 10 CFR 50.59. Therefore, the staff determined that the proposed changes are acceptable.
3.3 Editorial Changes The licensee also proposed the following three editorial changes to further align the Fermi 2 TS with the current version of the STS:
- TS 5.5.7, Part c, will change the words " ... at temperature of 30°C and at the relative
humidity ... "to" ... at a temperature of 30°C (86°F) and the relative humidity ... "
- TS 5.5.7 Part d, will change the words " ... at the system flowrate specified as follows
+/-10%." to "... at the system flowrate specified below+/- 10%.",
- TS 5.5.7, Part e, will change "system" to "systems" and the colon following "ASME N510-1980" will be changed to a period.
The NRC staff reviewed the proposed changes and determined they are editorial and, therefore, the changes are acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Michigan official was notified of the proposed issuance of the amendment on April 9, 2018. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on September 26, 2017 (82 FR 44851 ). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR Section 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: M. Hamm Date of issuance:May 24, 2018
ML18108A022 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DSS/STSB NAME SGoetz SRohrer VCusumano DATE 4/23/18 4/24/18 4/27/18 OFFICE OGC-NLO NRR/DORL/LPL3/BC N RR/DORL/LPL3/PM NAME S. Spicer DWrona SGoetz DATE 5/2/18 5/24/18 5/24/18