MONTHYEARIR 05000341/20240122024-11-0101 November 2024 Commercial Grade Dedication Inspection Report 05000341/2024012 IR 05000341/20245012024-10-0808 October 2024 – Emergency Preparedness Inspection Report 05000341/2024501 ML24276A2032024-10-0303 October 2024 FEMA Level 1 Finding Transmittal Letter ML24268A0992024-10-0101 October 2024 Power Plant – Audit Summary for License Amendment Request and Regulatory Exemptions for a Risk Informed Approach to Address ECCS Strainer Performance IR 05000341/20240132024-09-30030 September 2024 Phase 2 Post Approval License Renewal Report 05000341/2024013 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24257A1652024-09-13013 September 2024 FEMA Region 5 Fermi 2 Nuclear Power Plant Level 1 Finding September 2024 ML24254A3562024-09-0909 September 2024 FEMA Level 1 Finding for Fermi 2024 Biennial Exercise ML24240A3532024-08-27027 August 2024 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval Update IR 05000341/20240052024-08-22022 August 2024 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2024005) IR 05000341/20244042024-08-21021 August 2024 Public-Fermi Power Plant, Unit 2 - Material Control and Accounting Program Inspection Report 05000341/2024404 IR 05000341/20240022024-08-14014 August 2024 Integrated Inspection Report 05000341/2024002 ML24199A2182024-07-25025 July 2024 Enrico Fermi Atomic Power Plant, Unit 1 - NRC Position on Continuation of Possession-Only License No. DPR-9 Past the Current Expiration Date (Docket No. 50-016) ML24169A4092024-07-18018 July 2024 Relief Request RR-A25, Alternative to Reactor Vessel Circumferential Shell Weld Examination IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000341/20244022024-05-30030 May 2024 Security Baseline Inspection Report 05000341/2024402 ML24143A1852024-05-29029 May 2024 – Regulatory Audit in Support of LAR to Adopt TSTF-505, Rev. 2, TSTF-439, Rev. 2, and TSTF-591, Rev. 0 ML24141A2072024-05-20020 May 2024 Plant—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000341/LER-2024-002, Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications2024-05-16016 May 2024 Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications 05000341/LER-2024-001, Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-222024-05-15015 May 2024 Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-22 IR 05000341/20240102024-05-0606 May 2024 NRC Inspection Report 05000341/2024010 ML24052A2772024-04-30030 April 2024 Issuance of Amendment No. 229 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 IR 05000341/20240012024-04-30030 April 2024 Integrated Inspection Report 05000341/2024001 ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 ML24101A3732024-04-11011 April 2024 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000341/2024012 ML24100A8422024-04-0909 April 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection: Inspection Report 05000341/2024013 IR 05000341/20234022024-04-0808 April 2024 Reissue - Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402 (Public) ML24088A2162024-04-0404 April 2024 Change in Estimated Review Schedule and Level of Effort for License Amendment Request for Risk Informed Approach to ECCS Strainer Performance ML24086A5732024-04-0101 April 2024 Response to Disputed Non-Cited Violation Documents in Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402-01 Withdrawal of Non-Cited Violation (Public) IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 IR 05000341/20244012024-03-22022 March 2024 – Security Baseline Inspection Report 05000341/2024401 (Public) IR 05000341/20240112024-03-0808 March 2024 Nbsp;Safety Conscious Work Environment Issue of Concern Follow-up Inspection Report 05000341/2024011 ML24002B1812024-03-0404 March 2024 Issuance of Amendment No. 228 Regarding Revision of Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage IR 05000341/20230062024-02-28028 February 2024 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2023006) ML24019A1842024-02-16016 February 2024 Exemption from Select Requirements of 10 CFR Part 73 Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 IR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 – Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) 2024-09-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24143A1852024-05-29029 May 2024 – Regulatory Audit in Support of LAR to Adopt TSTF-505, Rev. 2, TSTF-439, Rev. 2, and TSTF-591, Rev. 0 ML24052A2772024-04-30030 April 2024 Issuance of Amendment No. 229 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML24002B1812024-03-0404 March 2024 Issuance of Amendment No. 228 Regarding Revision of Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21335A2802022-04-0707 April 2022 Issuance of Amendment No. 222 Regarding Revision of Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Several Editorial Changes ML21147A1672021-06-11011 June 2021 Issuance of Amendment No. 221 Regarding Revision of Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-563 ML21029A2542021-05-24024 May 2021 Issuance of Amendment No. 220 - Revision to Technical Specifications to Utilize Neutron Absorbing Inserts in Criticality Safety Analysis for Spent Fuel Pool Storage Racks (Non-Proprietary) ML21098A0452021-04-26026 April 2021 Issuance of Amendment No. 219 to Revise Technical Specifications to Adopt TSTF-529 ML20358A1552021-02-24024 February 2021 Issuance of Amendment No. 218, Revision to Technical Specifications to Change Certain Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML20294A0352020-12-22022 December 2020 Issuance of Amendment No. 217 - Revision to Technical Specifications for Secondary Containment Surveillance Requirements ML20233A8382020-10-0505 October 2020 Issuance of Amendment No. 216 - Revision to Technical Specification in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 ML20094G8142020-04-0808 April 2020 Audit Plan in Support of the Review of License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML19288A0732019-12-18018 December 2019 Issuance of Amendment No. 215 Revision to Technical Specification 3.3.5.3 ML19189A0042019-11-0505 November 2019 Issuance of Amendment Technical Specifications Task Force (TSTF)-564 Safety Limit Minimum Critical Power Ratio ML18306A4512019-01-0707 January 2019 Issuance of Amendment Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML18250A1632018-09-20020 September 2018 Issuance of Amendment No. 212 Elimination of Main Steam Line Radiation Monitor Trip and Isolation Function (CAC No. MG0228; EPID L-2017-LLA-0274) ML18247A4522018-09-17017 September 2018 Issuance of Amendment Revision to Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF 542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0208; EPID L-2017-LLA-0282) ML18165A2022018-09-13013 September 2018 Issuance of Amendment Regarding the Adoption of TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML18144A0642018-07-17017 July 2018 Issuance of Amendment to Revise Technical Specification Section 3.7.2, Emergency Equipment Cooling Water/Emergency Equipment Service Water System and Ultimate Heat Sink ML18108A0222018-05-24024 May 2018 Issuance of Amendment to Revise Technical Specifications 5.5.7 Ventilation Filter Testing Program (Vftp), to Be Consistent with Standard Technical Specifications ML17128A3162017-11-29029 November 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Process ML17076A0272017-04-14014 April 2017 Issuance of Amendment to Revise High Pressure Coolant Injection System and Reactor Core Isolation Cooling System Actuation Instrumentation Technical Specifications ML17074A1092017-03-16016 March 2017 Corrections to Amendment No. 205 Regarding Type a and C Testing ML16351A4602017-03-0909 March 2017 Issuance of Amendment to Extend Containment Leakage Test Frequency ML16270A5262016-12-15015 December 2016 Fermi 2, Renewed Facility Operating License NPF-43 ML16069A0062016-04-20020 April 2016 Issuance of Amendment Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation ML16054A6372016-04-0505 April 2016 Issuance of Amendment to Revise License Amendment Request to Revise Technical Specification Section 3.5.1, Emergency Core Cooling System - Operating Report ML15233A0842015-09-29029 September 2015 Issuance of Amendment License Amendment Request to Revise the Emergency Action Level Scheme for the Fermi Emergency Plan ML15155B4162015-07-14014 July 2015 Ferm, Uniti 2 - Issuance of Amendment Revise Technical Specifications by Relocating Surveillance Frequencies to Licensee Control in Accordance with Technical Specification Task Force Traveler 425, Revision 3 ML15096A0432015-05-0707 May 2015 Issuance of Amendment Cyber Security Plan Implementation Schedule (Tac No. MF4366) ML15057A2972015-03-16016 March 2015 Issuance of Amendment License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries (Tac No. MF4002) ML14016A4872014-03-10010 March 2014 Issuance of Amendment Revise the Fermi 2 Licensing Basis Concerning Protection from Tornado-Generated Missiles ML13364A1312014-02-10010 February 2014 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate ML13346B0672014-02-0404 February 2014 Issuance of Amendment Relocation of Pressure and Temperature Curves to a Pressure Temperature Limits Report ML13309A5942014-01-17017 January 2014 Issuance of Amendment to Adopt TSTF-423 Revision 1 Technical Specifications End States, NEDC-32988-A ML13204A1152013-08-0808 August 2013 Attachment 2 - Fermi 1, Amendment 21 to Operating License ML13164A2502013-07-12012 July 2013 Issuance of Amendment to Change Licensee Name on the Operating License ML13112A1422013-05-13013 May 2013 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522, Using Consolidated Line Item Improvement Process ML12207A5042012-08-29029 August 2012 Issuance of Amendment for Adoption of TSTF-306 ML1135004332012-02-24024 February 2012 Issuance of Amendment 188 TSTF-50, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML1124504642011-09-23023 September 2011 Issuance of Amendment Staff Augmentation Times During Radiological Emergencies ML1122109312011-08-26026 August 2011 License Amendment 186, Reactor Coolant System Leakage ML1119202212011-07-28028 July 2011 License Amendment, Cyber Security Plan ML1036304352011-01-24024 January 2011 License Amendment, Revise the Core Spray Flow Requirement of Technical Specification Surveillance Tests ML1027703822010-10-20020 October 2010 Issuance of Amendment to Revise Degraded Voltage Function to Reflect Modification ML1013408612010-05-15015 May 2010 Issuance of Emergency Amendment Regarding Onetime Extension of the Completion Time in Technical Specification 3.7.3, Control Room Emergency Filtration (CREF) System, Condition B 2024-05-29
[Table view] |
Text
UNITED ST ATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 16, 2017 Mr. Paul Fessler Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, Ml 48166
SUBJECT:
FERMI 2 - CORRECTION TO LICENSE AMENDMENT NO. 205 (CAC NO.
MF7534)
Dear Mr. Fessler:
On March 9, 2017, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 205 to Renewed Facility Operating License (RFOL) No. NPF-43 for the Fermi 2 facility. The amendment revised Technical Specification (TS) 5.5.12, "Primary Containment Leakage Rate Testing Program," for the permanent extension of the Type A test interval up to one test in 15 years, as stipulated in Nuclear Energy Institute (NEI) 94-01, Revision 2-A ,"Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J," October 2008.
The amendment also increased the containment isolation valves leakage test intervals (i.e.,
Type C tests) from their current 60 months to 75 months by replacing TS 5.5.12.a. reference to Regulatory Guide 1.163, "Performance-Based Containment Leak-Test Program," with a reference to NEI 94-01, Revision 3-A, and the conditions and limitations specified in NEI 94-01, Revision 2-A, to implement the performance-based leakage testing program in accordance with Title 1O of the Code of Federal Regulations Part 50, Appendix J, Option B.
In addition, the amendment deleted from TS 5.5.12.a, a Type A test extension that expired in 2007 and also removed from Fermi 2 RFOL paragraph 2.D an exemption, listed as "(c)," from Appendix J testing requirements for containment air locks. Amendment No.108, approved by the NRC in 1996, eliminated the need for this exemption by adopting Appendix J, Option B, requirements for the testing program for containment air locks.
During issuance of Amendment 205, the NRC issued replacement page 8 based on page 8 as it existed in the license before the renewed license was issued. The RFOL was issued on December 15, 2016. Paragraph 2.D, which is the only paragraph that was revised by Amendment No. 205 on page 8 of the RFOL, remains on page 8 of the license. This letter reissues page 8 of the license, as revised by Amendment No. 205, however, it reflects the page as it currently exists in the RFOL.
The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment, and does not affect the associated notice to the public.
Enclosed, please find corrected page 8 to the RFOL.
If you have any questions regarding this matter, I can be reached at (301) 415-8004 or Sujata.Goetz@nrc.gov.
Sincerely, Su1ata o~ject Plant icensing Branc Ill nage?
Division of Operating eactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341
Enclosure:
Corrected Page 8 to Renewed Facility Operating License NPF-43 cc: Distribution via Listserv
ENCLOSURE FERMI 2 RENEWED FACILITY OPERATING LICENSE NPF-43 DOCKET NO. 50-341 AMENDMENT NO. 205 CORRECTED PAGE 8 TO RENEWED FACILITY OPERATING LICENSE NPF-43
activities to be completed before the period of extended operation (PEO), as follows:
- 1. The applicant shall implement those new programs and enhancements to existing programs no later than 6 months prior to the PEO.
- 2. The applicant shall complete those activities by the 6-month date before the PEO or the end of the last refueling outage prior to the PEO, whichever occurs later.
The applicant shall notify the NRG in writing within 30 days after having accomplished item (b)1. above and include the status of those activities that have been or remain to be completed in item (b)2. above.
(c) DTE Electric Company shall fully implement the Boraflex rack replacement approved in Amendment No. 141 before the PEO (i.e., March 20, 2025), so that the Boraflex material in the spent fuel pool will not be required to perform a neutron absorption function. DTE Electric Company shall submit a letter to the NRG, within 60 days following completion of the removal of the Boraflex material and installation of the Boral material, as described in Amendment No. 141, confirming the removal of the Boraflex material and discontinued reliance on its neutron absorption function.
D. Exemptions from certain requirements of Appendices E and J to 10 CFR Part 50, are described in supplements to the SER. These include: (a) an exemption from the requirement of Section IV.F of Appendix E that a full participation emergency planning exercise be conducted within one year before issuance of the first operating license for full power and prior to operation above five percent of rated power (Section 13.3 of SSER #6); and (b) an exemption from the requirement of Paragraph lll.C.2(b) of Appendix J, the testing of the main steam isolation valves at the peak calculated containment pressure associated with the design basis accident (Section 6.2.7 of SSER
- 5). These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. Therefore, these exemptions are hereby granted pursuant to 10 CFR 50.12. With the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Fermi 2 Physical Security Plan, Security Training and Qualification Plan, and Renewed License No. NPF-43 Amendment No. 205
ML17074A109 OFFICE LPL3/PM LPL3/LA LPL3/BC/A LPL3/PM NAME SGoetz SRohrer KGreen SGoetz DATE 3 /16/17 3/16/17 3/16/17 3/16/17