Comment (447) of Vinod Arora Opposing Restart of San Onofre Unit 2 Until NRC Completes Comprehensive InvestigationML13155A437 |
Person / Time |
---|
Site: |
San Onofre |
---|
Issue date: |
05/02/2013 |
---|
From: |
Arora V - No Known Affiliation |
---|
To: |
Benney B J, Borchardt R W, Randy Hall, Lantz R E, Leeds E J Rules, Announcements, and Directives Branch, NRC/EDO, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, NRC Region 4 |
---|
References |
---|
NRC-2013-0070, 78FR22576 00447 |
Download: ML13155A437 (3) |
|
|
---|
Category:General FR Notice Comment Letter
MONTHYEARML20161A0122020-06-0808 June 2020 Comment (48) of Martin Kral on Holtec International HI-STORE Consolidated Interim Storage Facility Project ML20115E5482020-04-24024 April 2020 Comment (23) of Pam and Greg Nelson on Holtec International HI-STORE Consolidated Interim Storage Facility Project ML18155A3262018-06-0404 June 2018 Comment (49) of Eva M. O'Keefe on Very Low-Level Radioactive Waste Scoping Study ML18158A1872018-06-0101 June 2018 Comment (51) of Gayle Smith Concerning Nuclear Waste in San Onofre Research and Action Is Needed to Protect the Public ML18158A1862018-05-29029 May 2018 Comment (50) of Joanna Mathews Concerning San Onofre Nuclear Station to Find a Permanent Solution for the Nuclear Waste ML18155A3252018-05-29029 May 2018 Comment (48) of Quentin De Bruyn Opposing to San Onofre Waste Situation ML18066A5612018-03-0707 March 2018 Comment (161) of Matt Collins Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5552018-03-0707 March 2018 Comment (157) of Kathleen Morris Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5582018-03-0707 March 2018 Comment (159) of Anonymous on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5292018-01-22022 January 2018 Comment (140) of Patricia Martz Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5262018-01-22022 January 2018 Comment (139) of Abell Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5252018-01-22022 January 2018 Comment (138) of Michelle Schumacher Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5532018-01-22022 January 2018 Comment (155) of Jan Boudart on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5302018-01-16016 January 2018 Comment (141) of Erin Koch on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5322018-01-10010 January 2018 Comment 142 of Dave Rice on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5372018-01-0808 January 2018 Comment (146) of Carey Strombotne on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5392018-01-0404 January 2018 Comment 147 of Phoebe Sorgen on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5512018-01-0303 January 2018 Comment (153) of Alexander Bay Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5562018-01-0303 January 2018 Comment (158) of Lee Mclendon Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5492018-01-0303 January 2018 Comment (152) of Shari Horne Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18066A5242018-01-0303 January 2018 Comment (137) of Joseph Gildner Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18033A5962018-01-0202 January 2018 Comment (60) of Matthew Stein Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18032A1932018-01-0202 January 2018 Comment (44) of Mha Atma S. Khalsa Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18033A5952018-01-0202 January 2018 Comment (59) of Chelsea Anonymous Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18032A1952018-01-0202 January 2018 Comment (45) of T. Strohmeier on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18033A5932018-01-0202 January 2018 Comment (57) of Patrick Bosold Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18033A5702018-01-0202 January 2018 Comment (56) of Katya Gaynor on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18033A5692018-01-0202 January 2018 Comment (55) of Robert Hensley on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18033A5672018-01-0202 January 2018 Comment (54) of Angela Sarich Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18032A1972018-01-0202 January 2018 Comment (46) of Cheryl Harding Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18033A5632018-01-0202 January 2018 Comment (52) of Viraja Prema on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18033A5622018-01-0202 January 2018 Comment (51) of Larisa Stow-Norman Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18033A4982018-01-0202 January 2018 Comment (66) of Nancy Alexander Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18033A4962018-01-0202 January 2018 Comment (65) of Lorna Farnun Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18032A2002018-01-0202 January 2018 Comment (49) of Starr Cornwall Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18032A1992018-01-0202 January 2018 Comment (48) of Daryl Gale on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18037A6822018-01-0202 January 2018 Comment (94) of Jennifer Quest on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18032A1922018-01-0202 January 2018 Comment (43) of Frances Howard Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18037A6992018-01-0202 January 2018 Comment (108) from Anonymous Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities; Request for Comment on Draft NUREG ML18037A6972018-01-0202 January 2018 Comment (107) of Diana Dehm on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18037A6922018-01-0202 January 2018 Comment (104) of Ari Marsh on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18037A6912018-01-0202 January 2018 Comment (103) Christina Koppisch Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities; Request for Comment on Draft NUREG ML18037A6902018-01-0202 January 2018 Comment (102) of Helen Hanna on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18037A6892018-01-0202 January 2018 Comment (100) of Cindy Koch Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18037A6882018-01-0202 January 2018 Comment (101) Angela Ravenwood Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities; Request for Comment on Draft NUREG ML18037A6872018-01-0202 January 2018 Comment (99) of Melissa Brizzie Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18036A1912018-01-0202 January 2018 Comment (72) of J. C. Chernicky Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18037A6812018-01-0202 January 2018 Comment (93) of Ricardo Toro Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18037A6802018-01-0202 January 2018 Comment (92) of Stan Weber Regarding Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities ML18036A2082018-01-0202 January 2018 Comment (89) of B. Grace on Standard Review Plan for Spent Fuel Dry Storage Systems and Facilities 2020-06-08
[Table view] |
Text
-..4% UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
-7F Q57C SUNSI Review Complete Template = ADM -013 E-RIDS= ADM-03 Add= B. Benney (bjb)-0 rn C' ~Go U rJ~F1~1 C)m Wright; Darlene From: Vinod Arora [vinnie48in@gmail.com]
Sent: Thursday, May 02, 2013 11:00 AM To: CHAIRMAN Resource; Leeds, Eric; Borchardt, Bill; Benney, Brian; Hall, Randy; Lantz, Ryan;Howell, Art; R4ALLEGATION Resource
Subject:
Actions for Honorable NRC Chairman, Dr. Macfarlane on San Onofre Sincere Thanks to NRC Chairman, Mr. Victor Dricks, Mr. Cale Young, Mr. Ryan Lantz, Mr. Randy Hall and entire NRC Staff. Thanks to NRC for posting this blog.Jim Messina, Chair, Organizing for Action, for His Excellency, President of the United States, states," I've spent enough time in Washington to know that the way you win a fight with the gun lobby, faced with some of the most powerful special interests, is just to refuse to give up." Following his example, 8.4 Million Southern Californians will keep questioning NRC and SCE, until they are convinced that SONGS Unit 2 is safe for restart. 8.4 Million Southern Californians pay for SONGS Unit 2, therefore, they are justified in expressing their concerns about their safety.So far, all the available evidence indicates that the following major problems have not been addressed:
Problem Number 1. The design of San Onofre Replacement Steam generators (RSGs) are identical.
SONGS Unit 2 potentially did not suffer in-plane fluid elastic instability due to operation at higher steam pressures and lower RCS flows (Rejecting the impact of double Tube-to-AVB contact forces and better supports responsible for prevention of Unit 2 FEI). SONGS Unit 3 suffered in-plane fluid elastic instability due to operation at lower steam pressures and higher RCS flows (Rejecting the impact of insufficient Tube-to-AVB contact forces and loose supports due to manufacturing errors responsible for Unit 3 FEI). This conclusion is consistent with Westinghouse Operational Assessment, but challenges the SCE, NRC AIT, AREVA and MHI conclusions.
NRC AIT Report, SCE, MHI and AREVA conclusions on Unit 3 and Unit 2 FEI are incomplete, inconsistent, confusing and inconclusive and based on faulty computer simulations and hideous testing data (Shielded under the false pretense of MHI Proprietary information).
The analysis in these reports does not meet the intent of NRC CAL ACTION 1, which states "Southern California Edison Company (SCE) will determine the causes of the tube-to-tube interactions that resulted in steam generator tube wear in Unit 3, and will implement actions to prevent loss of integrity due to these causes in the Unit 2 steam generator tubes. SCE will establish a protocol of inspections and/or operational limits for Unit 2, including plans for a mid-cycle shutdown for further inspections." Repeated requests to NRC, SCE and its Independent Experts to examine carefully the operational difference between Units 2 & 3 and determine its impact on CAL Action I have not been addressed to date.NRR has not asked SCE in its RAI(s) the impact of operational differences between Units 2 and 3 on Unit 2 and Unit 3 tube-to-tube wear. Honorable NRC Commissioner Mr. Apostolakis was very confused on Unit 2 FEI inconsistent and conflicting statements by SCE, Westinghouse and AREVA.Required Action 1: To protect NRC Commission's Independent Public Safety Charter Mission, Honorable NRC Chairman is humbly requested that NRC Office of Inspector General retain an Independent Thermal-Hydraulic Expert to examine the operational differences between Units 2 & 3 during Cycle 16 and determine its impact on NRC CAL Action 1 by examining the entire SONGS Cycle 16 operational data for Units 2 & 3. Unit 2 Restart Permission at 70% power should be contingent on completion of the corrective actions required by NRC CAL Action I and lOCFR 50 Appendix B.Problem Number 2. In light of massive amounts of tube damage (wear), fatigue and tube failure in Unit 3, along with incomplete tube inspections for detection of circumferential incubating cracks in Unit 2, NRC is legally required to ask SCE to check MHI Fatigue Calculations and post the results on its website before any approval 1 of SONGS proposed New License Amendment for restart of Unit 2, to demonstrate that the proposed license (1) Would not involve a significant increase in the probability of an accident previously evaluated in the SONGS FSAR; or, (2) Would not create the possibility of a new or different type of accident previously evaluated in the SONGS FSAR; or, (3) Would not involve a significant reduction in the required margin of safety by operating Unit 2 at 70% power.Required Action 2: Based on the above review, NRC should ask SCE to provide a calculation justifying the engineering basis of MHI Fatigue Calculations to meet the ASME Code, NRC RG 1.121, the NRC Chairman and its own Standards.
The calculation should be performed by a California Licensed Mechanical or Civil Engineer and Independently Verified by a California Licensed Structural Engineer.
In addition, SCE and its Independent Experts should address the synergic effects of tube-to-tube wear and high cycle fatigue, which can be caused by in-plane fluid elastic instability in Unit 2 during anticipated operational occurrences and design bases accidents.
2