Tech Spec Pages for Amendment 265 Risk-Informed Modification to Selected Required End States
ML071970164
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 07/12/2007
From:
NRC/NRR/ADRO/DORL/LPLI-2
To:
Hughey J, NRR/DORL, 301-415-3204
Shared Package
ML063450173 List:
References
TAC MD2632
Download: ML071970164 (21)


Text

(5) Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facililty.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:

(1) Maximum Power Level Exelon Generation Company is authorized to operate the Peach Bottom Atomic Power Station, Unit No. 3, at steady state reactor core power levels not in excess of 3514 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained In Appendices A and B, as revised through Amendment No:265 are hereby incorporated in the license. Exelon Generation Compoany shall operate the facility in accordance with the Technical Specifications.'

(3) Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822), and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans,, which contain Safeguards Information protected under 10 CFR 73.21, Is entitled: "Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage InstallationSecurity Program, Revision 0,." submitted by letter dated October 21, 2004.

(4) Fire Protection The Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility, and as approved In

,Licensed power level was revised by Amendment No. 250, dated November 22, 2002, and will be implemented following the 14" refueling outage currently scheduled for Fall 2003.

,The training and Qualification Plan and Safeguards Contingency Plan and Appendices to the Security Plan.

Page 3 Renewed License No. DPR-56 Revised by letter dated October 28, 2004 Revised by letter dated November 5, 2004 I

ECCS-Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS-Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of five safety/relief valves shall be OPERABLE.

NOTE Low pressure coolant injection (LPCI) subsystems may be considered OPERABLE during alignment and operation for decay heat removal with reactor steam dome pressure less than the Residual Heat Removal (RHR) shutdown cooling isolation pressure in MODE 3, if capable of being manually realigned and not otherwise inoperable.

APPLICABILITY: MODE 1, MODES 2 and 3, except high pressure coolant injection (HPCI) is not required to be OPERABLE with reactor steam dome pressure : 150 psig and ADS valves are not required to be OPERABLE with reactor steam dome pressure 5 100 psig.

ACTIONS


NOTE---------------------------------

LCO 3.0.4.b is not applicable to HPCI.

CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days injection/spray ECCS injection/spray subsystem inoperable, subsystem(s) to OPERABLE status.

OR One low pressure coolant injection (LPCI) pump in each subsystem inoperable.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

(continued)

PBAPS UNIT 3 3.5-1 Amendment No. 265

ECCS-Operating 3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. HPCI System C.1 Verify by Immediately inoperable, administrative means RCIC System is OPERABLE.

AND C.2 Restore HPCI System 14 days to OPERABLE status.

D. HPCI System 0.1 Restore HPCI System 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable, to OPERABLE status.

AND OR One low pressure ECCS D.2 Restore low pressure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> injection/spray ECCS injection/spray subsystem is subsystem to OPERABLE inoperable, status.

E. One ADS valve E.1 Restore ADS valve to 14 days inoperable. OPERABLE status.

(continued)

PBAPS UNIT 3 3.5-2 Amendment No. 265

ECCS-Operating 3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F. One ADS valve F.1 Restore ADS valve to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. OPERABLE status.

AND One low pressure ECCS F.2 Restore low pressure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> injection/spray ECCS injection/spray subsystem inoperable, subsystem to OPERABLE status.

G. Required Action and G.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C, D, E or F not met.

H. Two or more ADS valves H.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> inoperable.

AND H.2 Reduce reactor steam dome pressure to 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I 5 100 psig.

I. Two or more low 1.1 Enter LCO 3.0.3. Immediately pressure ECCS injection/spray subsystems inoperable for reasons other than Condition A.

OR HPCI System and one or more ADS valves inoperable.

PBAPS UNIT 3 3.5-3 Amendment No.265

RCIC System 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.3 RCIC System LCO 3.5.3 The RCIC System shall be OPERABLE.

APPLICABILITY: MODE 1, MODES 2 and 3 with reactor steam dome pressure > 150 psig'.

ACTIONS


NOTE---------------------------------

LCO 3.0.4.b is not applicable to RCIC.

CONDITION REQUIRED ACTION COMPLETION TIME A. RCIC System A.1 Verify by Immediately inoperable, administrative means High Pressure Coolant Injection System is OPERABLE.

AND A.2 Restore RCIC System 14 days to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

PBAPS UNIT 3 3.5-12 Amendment No. 265

Primary Containment 3.6.1.1 3.6 CONTAINMENT SYSTEMS 3.6.1.1 Primary Containment LCO 3.6.1.1 Primary containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Primary containment A.1 Restore primary 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable, containment to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

PBAPS UNIT 3 3.6-1 Amendment No. 265

Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C not met.

E. Two lines with one or E.1 Restore all vacuum 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> more reactor building- breakers in one line to-suppression chamber to OPERABLE status.

vacuum breakers inoperable for opening.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time of Conditions A, AND B, or E not met.

F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.5.1 Verify Containment Atmospheric Dilution 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (CAD) System nitrogen storage tank level is Ž 16 inches water column.

SR 3.6.1.5.2 Verify Safety Grade Instrument Gas (SGIG) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> System header pressure Ž 80 psig.

(continued)

PBAPS UNIT 3 3.6-19 Amendment No.265

Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.6 3.6 CONTAINMENT SYSTEMS 3.6.1.6 Suppression Chamber-to-Drywell Vacuum Breakers LCO 3.6.1.6 Nine suppression chamber-to-drywell vacuum breakers shall be OPERABLE for opening.

AND Twelve suppression chamber-to-drywell vacuum breakers shall be closed, except when performing their intended function.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED'ACTION COMPLETION TIME A. One required A.1 Restore one required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> suppression chamber- vacuum breaker to to-drywell vacuum OPERABLE status.

breaker inoperable for opening.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

C. One suppression C.1 Close the open vacuum 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> I chamber-to-drywell breaker.

vacuum breaker not closed.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C AND not met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> PBAPS UNIT 3 3,6-21 Amendment No. 265

RHR Suppression Pool Cooling 3.6.2.3 3.6 CONTAINMENT SYSTEMS 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling LCO 3.6.2.3 Two RHR suppression pool cooling subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR suppression A.1 Restore RHR 7 days pool cooling subsystem suppression pool inoperable, cooling subsystem to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

C. Two RHR suppression C.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> pool cooling suppression pool subsystems inoperable, cooling subsystem to OPERABLE status.

D. Required Action and 0.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C AND not met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> PBAPS UNIT 3 3.6-27 Amendment No.265

RHR Suppression Pool Spray 3.6.2.4 3.6 CONTAINMENT SYSTEMS 3.6.2.4 Residual Heat Removal (RHR) Suppression Pool Spray LCO 3.6.2.4 Two RHR suppression pool spray subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR suppression A.1 Restore RHR 7 days pool spray subsystem suppression pool inoperable, spray subsystem to OPERABLE-status.

B. Two RHR suppression B.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> pool spray subsystems suppression pool inoperable, spray subsystem to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

PBAPS UNIT 3 3.6-29 Amendment No.265

Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment A.1 Restore secondary 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable in MODE 1, containment to 2, or 3. OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

C. Secondary containment C.1 ---------NOTE--------

inoperable during LCO 3.0.3 is not movement of irradiated applicable.

fuel assemblies in the secondary containment, during CORE Suspend movement of Immediately ALTERATIONS, or during irradiated fuel OPDRVs. assemblies in the secondary containment.

AND (continued)

PBAPS UNIT 3 3.6-34 Amendment No.265

SGT System 3.6.4.3 3.6 CONTAINMENT SYSTEMS 3.6.4.3 Standby Gas Treatment (SGT) System LCO 3.6.4.3 Two SGT subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One SGT subsystem A.1 Restore SGT subsystem 7 days inoperable, to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met in MODE 1, 2, or 3.

C. Required Action and ------------NOTE-----------

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A not met during movement of irradiated C.1 Place OPERABLE SGT Immediately fuel assemblies in the subsystem in secondary containment, operation.

during CORE ALTERATIONS, or during OR OPDRVs.

(continued)

PBAPS UNIT 3 3.6-40 PAmendment No.265

SGT System 3.6.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2.1 Suspend movement of Immediately irradiated fuel assemblies in secondary containment.

AND C.2.2 Suspend CORE Immediately ALTERATIONS.

AND C.2.3 Initiate action to Immediately suspend OPDRVs.

D. Two SGT subsystems D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> inoperable in MODE 1, 2, or 3.

E. Two SGT subsystems E.1 ---------NOTE--------

inoperable during LCO 3.0.3 is not movement of irradiated applicable.

fuel assemblies in the secondary containment, during CORE Suspend movement of Immediately ALTERATIONS, or during irradiated fuel OPDRVs. assemblies in secondary containment.

AND E.2 Suspend CORE Immediately ALTERATIONS.

AND E.3 Initiate action to Immediately suspend OPDRVs.

PBAPS UNIT 3 3.6-41 Amendment No.265

HPSW System 3.7.1 3.7 PLANT SYSTEMS 3.7.1 High Pressure Service Water (HPSW) System LCO 3.7.1 Two HPSW subsystems shall be OPERABLE.-

APPLICABILITY: MODES 1, 2,. and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One HPSW subsystem -----------NOTE-----------

inoperable. Enter applicable Conditions and Required Actions of LCO 3.4.7, "Residual Heat Removal (RHR) Shutdown Cooling System-Hot Shutdown," for RHR shutdown cooling made inoperable by HPSW System.

A.1 Restore HPSW 7 days subsystem to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

C. Both HPSW subsystems ----------- NOTE----------- I inoperable. Enter applicable Conditions and Required Actions of LCO 3.4.7 for RHR shutdown cooling made inoperable by.

HPSW System.

C.1 Restore one HPSW. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> subsystem to OPERABLE status.

(continued)

PBAPS UNIT 3 3.7-1 Amendment No. 265

HPSW System 3.7.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C AND not met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 Verify each HPSW manual and power operated 31 days valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position or can be aligned to the correct position.

PBAPS UNIT 3 3.7-2 Amendment No. 265

MCREV System 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Main Control Room Emergency Ventilation (MCREV) System LCO 3.7.4 Two MCREV subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One MCREV subsystem A.1 Restore MCREV 7 days inoperable, subsystem to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met in MODE 1, 2, or 3.

C. Required Action and ------------- NOTE-----------

associated Completion LCO 3.0.3 is not applicable.

Time of Condition A -----------------------------

not met during movement of irradiated C.1 Place OPERABLE MCREV Immediately fuel assemblies in the subsystem in secondary containment, operation.

during CORE ALTERATIONS, or during OR OPDRVs.

(continued)

PBAPS UNIT 3 3.7-7 Amendment No.265

MCREV System 3.7.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND C.2.2 Suspend CORE Immediately ALTERATIONS.

AND C.2.3 Initiate action to Immediately suspend OPDRVs.

D. Two MCREV subsystems D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> inoperable in MODE 1, 2, or 3.

E. Two MCREV subsystems ------------- NOTE-----------

inoperable during LCO 3.0.3 is not applicable.

movement of irradiated -----------------------------

fuel assemblies in the secondary containment, E.1 Suspend movement of Immediately during CORE irradiated fuel ALTERATIONS, or during assemblies in the OPDRVs. secondary containment.

AND E.2 Suspend CORE Immediately ALTERATIONS.

AND E.3 Initiate action to Immediately suspend OPDRVs.

PBAPS UNIT 3 3.7-8 Amendment No.265

Main Cond~enser Off gas 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Main Condenser Offgas LCO 3.7.5 The gross gamma activity rate of the noble gases measured at the steam jet air ejector (SJAE) discharge at the offgas sample rack shall be : 320,000 4Ci/second after decay of 30 minutes.

APPLICABILITY: MODE 1, MODES 2 and 3 with any main steam line not isolated and SJAE in operation.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Gross gamma activity A.1 Restore gross gamma 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> rate of the noble activity rate of the gases not within noble gases to within limit, limit.

B. Required Action and B.1 Isolate all main 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion steam lines.

Time not met.

OR B.2 Isolate SJAE. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B.3 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> PBAPS UNIT 3 3.7-10 Amendment No. 265

AC Sources-Operating 3.8.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. One offsite circuit ------------- NOTE-----------

inoperable. Enter applicable Conditions and Required Actions of AND LCO 3.8.7, "Distribution Systems-Operating," when One DG inoperable. Condition E is entered with no AC power source to any 4 kV emergency bus.

E.1 Restore offsite 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> circuit to OPERABLE status.

OR E.2 Restore DG to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE status.

F. Two or more DGs F.1 Restore all but one 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inoperable. DG to OPERABLE status.

G. Required Action and G.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A, C, D, E, or F not met.

OR Required Action B.2, B.3, B.4.1, B.4.2, or B.5 and associated Completion Time not met.

(continued)

PBAPS UNIT 3 3.8-5 Amendment No.265

DC Sources-Operating 3.8.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One Unit 2 DC NOTE----------

electrical power Enter applicable Conditions subsystem inoperable and Required Actions of LCO for reasons other than 3.8.7, "Distribution Condition A. Systems-Operating," when Condition B results in de-energization of a Unit 3 4 kV emergency bus.

B.1 Restore Unit 2 DC 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> electrical power subsystem to OPERABLE status.

C. One Unit 3 DC C.1 Restore Unit 3 DC 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> electrical power electrical power subsystem inoperable, subsystem to OPERABLE status.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time of Condition A, B, or C not met.

E. Two or more inoperable E.1 Enter LCO 3.0.3. Immediately DC electrical power subsystems.

PBAPS UNIT 3 3.8-29 Amendment No265

Distribution Systems-Operating 3.8.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. One Unit 3 DC D.1 Restore Unit 3 DC 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> electrical power electrical power distribution subsystem distribution AND inoperable, subsystem to OPERABLE status. 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7.a E. Required Action and E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A, B, C, or D not met.

F. Two or more inoperable F.1 Enter LCO 3.0.3. Immediately electrical power distribution subsystems that result in a loss of function.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.7.1 Verify: 7 days

a. Correct breaker alignments to required AC electrical power distribution subsystems; and
b. Indicated power availability to required AC and DC electrical power distribution subsystems.

PBAPS UNIT 3 3'. 8 -43 Amendment No.265